NFM AFLA Volume 1 of 5 |
12/04/2020 |
Amended Final License Application |
Download
|
TF and NFM AFLA Executive Summary |
12/04/2020 |
Amended Final License Application |
Download
|
TF AFLA Volume 1 of 5 |
12/04/2020 |
Amended Final License Application |
Download
|
TF and NFM AFLA Volume 2 of 5 (Part 3 of 4) |
12/04/2020 |
Amended Final License Application |
Download
|
TF and NFM AFLA Cover letter |
12/04/2020 |
Amended Final License Application |
Download
|
TF and NFM AFLA Volume 2 of 5 (Part 4 of 4) |
12/04/2020 |
Amended Final License Application |
Download
|
TF and NFM AFLA Volume 2 of 5 (Part 2 of 4) |
12/04/2020 |
Amended Final License Application |
Download
|
TF and NFM AFLA Volume 2 of 5 (Part 1 of 4) |
12/04/2020 |
Amended Final License Application |
Download
|
FirstLight cover letter for filing Relicensing Study 3.3.19 Ultrasound Array and Cabot Station Shad Mortality Study (March 2019) |
03/31/2020 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Study 3.3.19 Ultrasound Array and Cabot Station Shad Mortality Study (March 2019) |
03/01/2020 |
Fish and Aquatics |
Download
|
FirstLight submits request to revise schedule for filing Amended License Application |
02/10/2020 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight cover letter for filing Revised (Jan 2020) Relicensing Study 3.7.1 Phase II MA Report |
02/03/2020 |
Cultural |
Download
|
FirstLight cover letter for filing Relicensing Study 3.7.1 Phase II MA Report (Evaluations of 17 Archaeological Sites) |
10/18/2019 |
Cultural |
Download
|
FirstLight submits fifth Monthly Progress Report for Massachusetts Phase II Archaeological Report |
10/04/2019 |
Cultural |
Download
|
FirstLight cover letter for filing Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the bypass Reach and below Cabot Station -Addendum 7 |
09/30/2019 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the bypass Reach and below Cabot Station -Addendum 7 |
09/01/2019 |
Fish and Aquatics |
Download
|
FirstLight submits fourth Monthly Progress Report for Massachusetts Phase II Archaeological Report |
08/30/2019 |
Cultural |
Download
|
FirstLight submits third Monthly Progress Report for Massachusetts Phase II Archaeological Report |
08/05/2019 |
Cultural |
Download
|
FirstLight submits second Monthly Progress Report for Massachusetts Phase II Archaeological Report |
07/05/2019 |
Cultural |
Download
|
FirstLight submits response to Connecticut River Conservancy (CRC) Comments on 2019 Updated Study Reports 3.3.19, 3.3.9 and 3.7.1 |
06/13/2019 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight submits first Monthly Progress Report for Massachusetts Phase II Archaeological Report |
06/06/2019 |
Cultural |
Download
|
FirstLight cover letter for filing Northfield Mountain Generation Station CFD Modeling for Fish Exclusion Net Forces Report |
06/03/2019 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Northfield Mountain Generation Station CFD Modeling for Fish Exclusion Net Forces Report |
06/01/2019 |
Fish and Aquatics |
Download
|
FirstLight submits response to Massachusetts Division of Fisheries and Wildlife relative to Mussel Assessment |
05/29/2019 |
Fish and Aquatics |
Download
|
FirstLight submits request to FERC for time extension regarding the Phase II Archaeological Report |
05/06/2019 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight cover letter filing Final 2019 Ultrasound Array Control Study (Updated) |
04/30/2019 |
Fish and Aquatics |
Download
|
FirstLight cover letter for FERC filing Relicensing Study 3.3.1 Addendum 6 |
04/19/2019 |
Fish and Aquatics |
Download
|
FirstLight Study Meeting Summary and presentation (March 29, 2019) |
04/15/2019 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight proposed schedule for Amended License Application |
04/12/2019 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the bypass Reach and below Cabot Station -Addendum 6 Assessment of Sea Lamprey and Yellow Lampmussels in Reach 4 |
04/01/2019 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.19 - Final 2019 Ultrasound Array Control Study (Updated) |
04/01/2019 |
Fish and Aquatics |
Download
|
FirstLight cover letter for filing 3/29/19 meeting agenda and Relicensing Study No. 3.3.19 Ultrasound Array 2018 report and the Proposed 2019 ultrasound array control study plan and the Relicensing Study No. 3.7.1 Phase IB Archaeological Survey for MA |
03/12/2019 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Study 3.3.19 Evaluate the Use of an Ultrasound Array to Facilitate Upstream Movement to Turners Falls Dam by avoiding Cabot Station Tailrace -2018 Study Report |
03/01/2019 |
Fish and Aquatics |
Download
|
FirstLight cover letter filing Relicensing Study 3.3.1 Addendum 5 and Relicensing Study 3.5.1 Addendum 3 |
03/01/2019 |
Wetlands |
Download
|
Relicensing Study 3.3.19 Proposed 2019 Ultrasound Array Control Study |
03/01/2019 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station Addendum 5 Assessment of Sea Lamprey (new spawning HSI curves) and Yellow Lampmussels in Reach 3 |
03/01/2019 |
Fish and Aquatics |
Download
|
Relicensing Study 3.5.1 Baseline Inventory of Wetland Riparian and Littoral Habitat in the Turners Falls Impoundment and Assessment of Operational Impacts on Special Species Addendum Tiger Beetles |
03/01/2019 |
Wetlands |
Download
|
FirstLight submits response to comments on various Study Report Addendums that were filed between April 3, 2017 and May 1, 2018 |
12/21/2018 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Letter FirstLight filing Phase IB and Phase II Reports for Archaeological Investigations in Vermont, New Hampshire, and Massachusetts as part of Relicensing Study No. 3.7.1 |
12/14/2018 |
Cultural |
Download
|
FirstLight files October 9, 2018 Study Report Meeting Summary |
10/24/2018 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight files Conference Call-In Number for October 9, 2018 Study Plan Meeting |
09/21/2018 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight files Agenda for October 9, 2018 Study Plan Meeting |
09/13/2018 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight submits Request for Extension of Time to Complete Archaeological Surveys, Relicensing Study Nos 3.7.1 and 3.7.3 |
07/17/2018 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Cover Letter FirstLight files Response to FERC’s Additional Information Request dated June 21, 2018 regarding Phase IB Archaeological Surveys |
07/16/2018 |
Cultural |
Download
|
FirstLight's response to the USFWS letter requesting the report titled Juvenile American Shad Assessment in the Connecticut River – Fall 2017 |
06/28/2018 |
Fish and Aquatics |
Download
|
FirstLight request waiver of the requirement to conduct Phase IB Archaeological Surveys on lands owned by GRH and within the FERC project boundary |
06/20/2018 |
Cultural |
Download
|
Cover letter FirstLight files request to FERC regarding Phase IB Archaeological Surveys |
05/31/2018 |
Cultural |
Download
|
FirstLight submits notification letter and attachments to FERC of Additional Proposed Study- Barrier Net Assessment |
05/10/2018 |
Fish and Aquatics |
Download
|
Cover Letter FirstLight files outstanding Relicensing Study Addendums for Study 3.3.1 and 3.3.15 |
05/01/2018 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station Addendum 3 Assessment of Yellow Lampmussels in Reach 3 |
05/01/2018 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.15 Assessment of Sea Lamprey Spawning within Assessment of Sea Lamprey Spawning within Turners Falls Turners Falls Project Northfield Mountain Project Area Addendum 1 Impact on Sea Lamprey Spawning Nests near Stebbins Island |
05/01/2018 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station Addendum 2 IFIM Study for Mussels in Reach 5 |
05/01/2018 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station Addendum 4 New Sea Lamprey Weighed Usable Area Curves based on Agency Proposed Habitat Suitability Index Curves |
05/01/2018 |
Fish and Aquatics |
Download
|
FirstLight Submittal of RMC 1994 Report |
04/19/2018 |
Fish and Aquatics |
Download
|
FirstLight Response to Stakeholder Comments on Study Plan 3.3.19 |
04/13/2018 |
Fish and Aquatics |
Download
|
FirstLight Response to FERC’s March 13, 2018 letter regarding Downstream Juvenile Shad Study No. 3.3.3 (Harza_RMC_1993) |
04/06/2018 |
Fish and Aquatics |
Download
|
FirstLight Response to FERC’s March 13, 2018 letter regarding Downstream Juvenile Shad Study No. 3.3.3 (RMC_1994) |
04/06/2018 |
Fish and Aquatics |
Download
|
FirstLight Response to FERC’s March 13, 2018 letter regarding Downstream Juvenile Shad Study No. 3.3.3 |
04/06/2018 |
Fish and Aquatics |
Download
|
FirstLight Response to FERC’s March 13, 2018 letter regarding Downstream Juvenile Shad Study No. 3.3.3 (RMC_1995) |
04/06/2018 |
Fish and Aquatics |
Download
|
FirstLight Response to FERC’s March 13, 2018 letter regarding Downstream Juvenile Shad Study No. 3.3.3 (Harza_RMC_1992) |
04/06/2018 |
Fish and Aquatics |
Download
|
FirstLight files record of MADFW correspondence supporting the delay on conducting the Juvenile Shad Study Report 3.3.3 |
02/28/2018 |
Fish and Aquatics |
Download
|
FirstLight Update to FERC on Study Report 3.7.1 |
02/26/2018 |
Cultural |
Download
|
FirstLight Update to FERC Outstanding Addendums, Additional Proposed Studies and Proposed Schedule |
02/23/2018 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight cover letter filing 2017 Relicensing Study 3.3.1 IFIM for Reach 5 Mussels |
08/23/2017 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station - IFIM for Mussels 2017 |
08/01/2017 |
Fish and Aquatics |
Download
|
FirstLight files Response to Stakeholder Requests for Study Modifications and/or New Studies Based on the Study Report |
05/30/2017 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight files status of additional data required for Relicensing Studies No. 3.3.1 and 3.3.15 by FERC's February 17, 2017 Study Plan Determination Letter |
05/11/2017 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Cover Letter for filing 2017 Study Report 3.3.2, 3.3.3 Addendums and 3.3.1 Errata |
05/01/2017 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Study 3.3.3 Evaluate Downstream Pass Evaluate Downstream Pass Evaluate Downstream Passage Addendum 1 |
05/01/2017 |
Fish and Aquatics |
Download
|
Errata Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment E2 Errata) |
05/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.2 Evaluate Upstream and Downstream Passage Addendum 1 |
05/01/2017 |
Fish and Aquatics |
Download
|
FirstLight response Massachusetts Department of Environmental Protection (MADEP) comments on the Erosion Causation Report letter dated December 14, 2016 |
04/03/2017 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Transmittal Letter FERC filing 2017 Study Reports 3.1.2 (re-issue), 3.3.1 Addendum 1, 3.5.1 Addendum 2 |
04/03/2017 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight analysis of expanded use of the Upper Reservoir on potential shoreline erosion of the Turners Falls Impoundment |
04/03/2017 |
Operations |
Download
|
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume III (Re-Issue 2017) Appendix J-II |
04/01/2017 |
Geology and Soils |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D7) |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment E2) |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study 3.5.1 Baseline Inventory of Wetland, Riparian and Littoral Habitat in the Turners Falls Impoundment and Assessment of Operational Impacts on Special Status Species Addendum 2 - Public Version (Attachment) |
04/01/2017 |
Wetlands |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment E1) |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D2) |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume III (Re-Issue 2017) |
04/01/2017 |
Geology and Soils |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D3) |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study 3.5.1 Baseline Inventory of Wetland, Riparian and Littoral Habitat in the Turners Falls Impoundment and Assessment of Operational Impacts on Special Status Species Addendum 2 - Public Version |
04/01/2017 |
Wetlands |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D6) |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D1) |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume I (2017) |
04/01/2017 |
Geology and Soils |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D4) |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D5) |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume II (Re-Issue 2017) |
04/01/2017 |
Geology and Soils |
Download
|
FirstLight Study Report Meeting Summary (March 16, 2017) |
03/31/2017 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Presentation for Study Report Meeting March 16, 2017 |
03/16/2017 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Study 3.8.1 Evaluate the Impact of Current and Potential Future Modes of Operations on Flow, Water Elevation and Hydropower Generation |
03/01/2017 |
Operations |
Download
|
FirstLight Response to the January 17, 2017 letter from the Elnu Abenaki Tribe regarding Traditional Cultural Properties Study |
03/01/2017 |
Cultural |
Download
|
FirstLight Response to the January 15, 2017 letter from the Narragansett Indian Tribe (NIT) regarding Traditional Cultural Properties Study |
03/01/2017 |
Cultural |
Download
|
Transmittal Letter Filing of Study Reports 3.3.5, 3.3.19, 3.8.1 and Agenda for Study Report Meeting, March 16, 2017 |
03/01/2017 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Study 3.3.5 Evaluate Downstream Passage of American Eel |
03/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.19 Evaluate the use of Ultrasound Array to Facilitate Upstream Movement to Turners Falls Dam by Avoiding Cabot Station Tailrace |
03/01/2017 |
Fish and Aquatics |
Download
|
FirstLight Notification of Updated Study Report Meeting March 1, 2017 |
02/23/2017 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight letter to FERC requesting filing date extension until April 3, 2017 for Study No. 3.1.2 Addendum |
02/22/2017 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Response to Stakeholder Requests for Study Modifications and/or New Studies Based on the Study Report and Meeting Summary (1/17/2017) |
01/17/2017 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Transmittal Letter FERC filing Study Reports 3.3.10 and 3.3.20 |
12/28/2016 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Discuss Instream Flow Study (FirstLight Study No 3.3.1) Meeting Summary (12/2/2016) |
12/02/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.20 Ichthyoplankton Entrainment Assessment at Northfield Mountain Project -Second year |
12/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.10 Assess Operational Impacts on Emergence of State-Listed Odonates in the Connecticut River 2014-2016 Study Report |
12/01/2016 |
Fish and Aquatics |
Download
|
FirstLight Notification Letter providing revised FERC filing date for the Relicensing Study Report No. 3.1.2 Northfield Mountain/Turners Falls Operations Impacts on Existing Erosion and Potential Bank Instability Addendum |
11/18/2016 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Updated Study Report (URS) Study Meeting Summary (10/31/16 - 11/1/2016) |
11/15/2016 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Presentation for Study Report Meetings Oct 31, 2016 and Nov 1, 2016 |
10/31/2016 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Transmittal Letter filing 10 Study Reports, 3 Addenda and Agenda for Study Report Meetings Oct 31, 2016 and Nov 1, 2016 |
10/14/2016 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Study 3.3.3 Evaluate Downstream Passage of Juvenile American Shad Interim Study Report |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.8 Computational Fluid Dynamics Modeling in the Vicinity of the Fishway Entrances and Powerhouse Forebays Addendum |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.15 Assessment of Adult Sea Lamprey Spawning within the Turners Falls Project and Northfield Mountain Project Area (same report as posted 6/30/16) |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.13 Impacts of the Turners Falls Project and Northfield Mountain Project on Littoral Zone Fish Habitat and Spawning Habitat Study Report (same report as posted 6/30/2016) |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.1.2 Northfield Mountain/Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report, Volume I (2016) |
10/01/2016 |
Geology and Soils |
Download
|
Relicensing Study 3.1.3 Northfield Mountain Pumped Storage Project Sediment Management Plan |
10/01/2016 |
Geology and Soils |
Download
|
Relicensing Study 3.1.2 Northfield Mountain/Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report, Volume III (2016) |
10/01/2016 |
Geology and Soils |
Download
|
Relicensing Study 3.1.2 Northfield Mountain/Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report, Volume II (2016) |
10/01/2016 |
Geology and Soils |
Download
|
Relicensing Study 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station (Appendix E) |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.6.6 Assessment of Effects of Project Operation on Recreation and Land Use |
10/01/2016 |
Recreation and Land Use |
Download
|
Relicensing Study 3.5.1 Baseline Inventory of Wetland, Riparian and Littoral Habitat in the Turners Falls Impoundment and Assessment of Operational Impacts on Special Status Species Addendum - Public Version |
10/01/2016 |
Wetlands |
Download
|
Relicensing Study 3.3.16 Habitat Suitability Criteria for State-listed Mussel Species in the Connecticut River below Cabot Station Study Report |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.7 Fish Entrainment and Turbine Passage Mortality Study |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.2. Evaluate Upstream and Downstream Passage of Adult American Shad Study Report |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.3 Evaluate Downstream Passage of Juvenile American Shad Interim Study Report |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.6 Impact of Project Operations on Shad Spawning, Spawning Habitat and Egg Deposition in the area of the Northfield Mountain and Turners Falls Projects Addendum |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume II (2016) |
09/01/2016 |
Geology and Soils |
Download
|
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume I (2016) |
09/01/2016 |
Geology and Soils |
Download
|
Relicensing Study 3.3.15 Assessment of Adult Sea Lamprey Spawning within the Turners Falls Project and Northfield Mountain Project Area |
06/30/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.13 Impacts of the Turners Falls Project and Northfield Mountain Project on Littoral Zone Fish Habitat and Spawning Habitat Study Report |
06/30/2016 |
Fish and Aquatics |
Download
|
FirstLight letter to FERC notifying study reports 3.3.13 and 3.3.15 uploaded to website |
06/30/2016 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Response to Stakeholder Requests for Study Modifications and/or New Studies Based on the Study Report and Meeting Summary (5/31/2016) |
05/31/2016 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Final License Application Exhibit H |
04/29/2016 |
Final License Application |
Download
|
Final License Application Exhibit C |
04/29/2016 |
Final License Application |
Download
|
Final License Application Exhibit G |
04/29/2016 |
Final License Application |
Download
|
Final License Application Initial Statement and Additional Information |
04/29/2016 |
Final License Application |
Download
|
Final License Application Exhibit D |
04/29/2016 |
Final License Application |
Download
|
Final License Application Exhibit B |
04/29/2016 |
Final License Application |
Download
|
Final License Application Exhibit E |
04/29/2016 |
Final License Application |
Download
|
Final License Application Exhibit A |
04/29/2016 |
Final License Application |
Download
|
Final License Application Cover Letter |
04/29/2016 |
Final License Application |
Download
|
Responses to Connecticut River Watershed Council comment letter dated March 25, 2016 and Mr. Karl Meyer comment letter dated March 27, 2016 |
04/22/2016 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
March 16, 2016, Study Meeting Summary. |
03/31/2016 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight- March 16, 2016 Study Report Meeting |
03/14/2016 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight - March 8, 2016 Study 3.3.2 Adult Shad Telemetry Data Analysis Meeting. Presentation. |
03/08/2016 |
Fish and Aquatics |
Download
|
FirstLight - March 8, 2016 Study 3.3.2 Adult Shad Telemetry Data Analysis Meeting. Memorandum. |
03/08/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.2.1 Water Quality Monitoring Study |
03/01/2016 |
Water Resources |
Download
|
Relicensing Study 3.3.6 Impact of Project Operations on Shad Spawning, Spawning Habitat and Egg Deposition in the area of the Northfield Mountain and Turners Falls Projects |
03/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.11 Fish Assemblage Assessment |
03/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.12 Evaluation of Emergency Gate and Bypass Flume Discharges |
03/01/2016 |
Fish and Aquatics |
Download
|
Filing of Study Reports, Proposed Schedule, and Process Plan for Remaining Study Reports |
03/01/2016 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Revised Study Plan 3.3.19 - Evaluate the Use of an Ultrasound Array to Facilitate Upstream Movement to Turners Falls Dam by Avoiding Cabot Station Tailrace |
02/18/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.4 Evaluate Upstream Passage of American Eel at the Turners Falls Project |
02/12/2016 |
Fish and Aquatics |
Download
|
Notification of Study Report Meeting, March 16, 2016 |
02/12/2016 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Study 3.3.20 Ichthyoplankton Entrainment Assessment at the Northfield Mountain Pumped Storage Project |
02/12/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.5.1 Baseline Inventory of Wetland, Riparian and Littoral Habitat in the Turners Falls Impoundment, and Assessment of Operational Impacts on Special-Status Species |
02/12/2016 |
Wetlands |
Download
|
Relicensing Study 3.3.18 Impacts of the Turners Falls Canal Drawdown on Fish Migration and Aquatic Organisms Addendum |
02/12/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.2.2 Hydraulic Study Addendum |
02/04/2016 |
Water Resources |
Download
|
Relicensing Study 3.4.1 Baseline Study of Terrestrial Wildlife and Botanical Resources |
02/04/2016 |
Terrestrial |
Download
|
Relicensing Study 3.3.8 Computational Fluid Dynamics Modeling in the Vicinity of the Fishway Entrances and Powerhouse Forebays |
02/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.10 Assess Operational Impacts on Emergence of State-Listed Odonates in the Connecticut River |
02/01/2016 |
Fish and Aquatics |
Download
|
FERC Letter Determination on Requests for Study Modifications and New Studies |
01/15/2016 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Study 3.6.1 Recreation Use/User Contact Survey Study Report |
12/31/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.6.5 Land Use Inventory Study Report |
12/31/2015 |
Recreation and Land Use |
Download
|
FirstLight Response to Stakeholder Requests for Study Modifications and/or New Studies Based on the Updated Study Report and Meeting Summary |
12/14/2015 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Draft License Application Exhibit E |
12/02/2015 |
Draft License Application |
Download
|
Draft License Application Exhibit D |
12/02/2015 |
Draft License Application |
Download
|
Draft License Application Cover Letter |
12/02/2015 |
Draft License Application |
Download
|
Draft License Application Exhibit C |
12/02/2015 |
Draft License Application |
Download
|
Draft License Application |
12/02/2015 |
Draft License Application |
Download
|
Draft License Application Exhibit A |
12/02/2015 |
Draft License Application |
Download
|
Draft License Application - Initial Statement and Additional Information |
12/02/2015 |
Draft License Application |
Download
|
Draft License Application Exhibit G |
12/02/2015 |
Draft License Application |
Download
|
Draft License Application Exhibit H |
12/02/2015 |
Draft License Application |
Download
|
Sediment Management Plan – Report of 2015 Activities for Northfield Mountain Pumped Storage Project (FERC No. 2485) |
12/01/2015 |
Geology and Soils |
Download
|
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace (Appendix A) |
12/01/2015 |
Water Resources |
Download
|
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace (Appendix B Velocity) |
12/01/2015 |
Water Resources |
Download
|
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace |
12/01/2015 |
Water Resources |
Download
|
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace (Appendix B Depth) |
12/01/2015 |
Water Resources |
Download
|
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace (Appendix B Water Surface) |
12/01/2015 |
Water Resources |
Download
|
Relicensing Study 3.7.2 Historic Architectural Resources Survey & National Register Evaluation Study Report Addendum |
11/16/2015 |
Cultural |
Download
|
FirstLight submits requested survey data relating to Relicensing Study No. 3.6.3 Whitewater Boating Evaluation and Study No. 3.6.7 Recreation Study at Northfield Mountain, Including Assessment of Sufficiency of Trails For Shared Use |
11/10/2015 |
Recreation and Land Use |
Download
|
FirstLight 2015 Updated Study Meeting Summary, held on 9/29/15-9/30/15 |
10/14/2015 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
2015 Updated Study Report Presentation |
09/28/2015 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Updated Study Report Summary 3.3.11 Fish Assemblage Assessment |
09/14/2015 |
Fish and Aquatics |
Download
|
FirstLight Transmittal Letter for 2015 Updated Study Report FERC Submission |
09/14/2015 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Updated Study Report Summary 3.8.1 Evaluate the IMpact of Current and Proposed Future Modes of Operation on Flow, Water Elevation and Hydropower Generation |
09/14/2015 |
Operations |
Download
|
Updated Study Report Summary 3.7.2 Historical Architechtural Resources Survey & National Register Evaluation |
09/14/2015 |
Cultural |
Download
|
Updated Study Report Summary 3.7.1 Phase IA (Reconnaissance) Archaeological Survey |
09/14/2015 |
Cultural |
Download
|
Updated Study Report Summary 3.6.6 Assessment of Effects of Project Operation on the Recreation and Land Use |
09/14/2015 |
Recreation and Land Use |
Download
|
Updated Study Report Summary 3.6.5 Land Use Inventory |
09/14/2015 |
Recreation and Land Use |
Download
|
Updated Study Report Summary 3.6.1 Recreational Use/User Contact Survey |
09/14/2015 |
Recreation and Land Use |
Download
|
Updated Study Report Summary 3.3.7 Fish Entrainment and Turbine Passage Mortality Study |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.2 Evaluate Upstream and Downstream Passage of Adult American Shad |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.19 Evaluate the Use of an Ultrasound Array to Facilitate Upstream Movement of American Shad at Turner Falls |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.5.1 Baseline Inventory of Wetland, Ripariam and Littoral Habitat in the Turners Falls Impoundment and Assessment of Operational Impacts on Special-Status Species |
09/14/2015 |
Wetlands |
Download
|
Updated Study Report Summary 3.4.1 Baseline Study of Terrestrial Wildlilfe and Botanical Resources |
09/14/2015 |
Terrestrial |
Download
|
Updated Study Report Summary 3.3.8 Computation Fluid Dynamics Modeling in the Vicinity of the Fishway Entrances and Powerhouse Forebays |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.6 Impact of Project Operations on Shad Spawning, Spawning Habitat and Egg Deposition in the area of Northfield Mountain and Turner Falls Projects |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.5 Evaluate Downstream Passage of American Eel |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.16 Habitat Assessment, Surveys, and Modeling of Suitable Habitat for State-Listed Mussel Species in the Connecticut River Below Cabot Station |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.3 Evaluate Downstream Passage of Juvenile American Shad |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.12 Evaluate Frequency and Impact of Emergency Water Control Gate Discharge Events and Bypass Flume Events on Shortnose Sturgeon Spawning and Rearing Habitat in the Tailrace and Downstream From Cabot Station |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.13 Impacts of the Turner Falls Project and Northfield Mountain Project on Littoral Zone Fish Habitat and Spawning Habitat |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.15 Assessment of Adult Sea Lamprey Spawning with the Turner Falls Project and Northfield Mountain Project Area |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.2.1 Water Quality Monitoring Study |
09/14/2015 |
Water Resources |
Download
|
Updated Study Report Summary 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station |
09/14/2015 |
Water Resources |
Download
|
Udated Study Report Summary 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Project Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.4 Evaluate Upstream Passage of American Eel at the Turner Falls Project |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.10 Assess Operational Impacts on Emergence of State-Listed Odonates in the Connecticut River |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.1.2 Operation Impacts on Existing Erosion and Potential Bank Instability |
09/14/2015 |
Recreation and Land Use |
Download
|
Updated Study Report Summary 3.3.20 Ichthyoplankton Entrainment Assessment at the Northfield Mountain Project |
09/14/2015 |
Fish and Aquatics |
Download
|
Relicensing Study 3.1.3 Sediment Management Plan |
09/14/2015 |
Geology and Soils |
Download
|
Revised Appendix C for Completed Study Report for Study No. 3.7.2 (Transmittal Letter) |
07/22/2015 |
Cultural |
Download
|
Revised Appendix C for Completed Study Report for Study No. 3.7.2 (NH Area Form) |
07/22/2015 |
Cultural |
Download
|
FristLight Notification of Updated Study Report Meetings September 29 and 30, 2015 |
07/21/2015 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Study 3.4.2 Effects of Northfield Mountain Pumped Storage Development Related to Land Management Practices and Recreation Use on Terrestral Habitats |
06/30/2015 |
Terrestrial |
Download
|
Relicensing Study 3.3.14 Aquatic Habitat Mapping of Turner Falls Impoundment |
06/30/2015 |
Fish and Aquatics |
Download
|
Relicensing Study 3.6.7 Recreation Study at Northfield Mountain, including Assessment of Sufficient of Trails for Shared Use |
06/30/2015 |
Recreation and Land Use |
Download
|
FirstLight CoverLetter Posting of Second Quarter 2015 Study Reports, Turners Falls Hydroelectric Project (FERC No. 1889) and Northfield Mountain Pumped Storage Project (FERC No. 2485) |
06/30/2015 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Study 3.3.17 Assess the Impacts of Turner Falls Project and Northfield Project Operations on Tributary and Backwater Area Access and Habitat |
06/30/2015 |
Fish and Aquatics |
Download
|
Study 3.6.2 Recreation Facilities Inventory and Assessment Addendum |
06/15/2015 |
Recreation and Land Use |
Download
|
Study 3.6.2 Recreation Facilities Inventory and Assessment Addendum Cover Letter |
06/15/2015 |
Recreation and Land Use |
Download
|
Interim Relicensing Study 3.3.10 Assess Operational Impacts on Emergence of State-Listed Odonated in the Connecticut River |
04/02/2015 |
Fish and Aquatics |
Download
|
Relicensing Study 3.2.2 Hydraulic Study of Turner Falls Impoundment, Bypass Reach and Below Cabot |
03/31/2015 |
Water Resources |
Download
|
Relicensing Study 3.6.4 Assessment of Day Use and Overnight Facilities associated with Non-Motorized Boats |
03/31/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Form Flow 3500) |
03/31/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Form Flow 2500) |
03/31/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.3.4 Evaluate Upstream Passage of American Eel at the Turner Falls Project |
03/31/2015 |
Fish and Aquatics |
Download
|
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Form Flow 8000) |
03/31/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Form Flow 13000) |
03/31/2015 |
Recreation and Land Use |
Download
|
FirstLight CoverLetter Posting of First Quarter 2015 Study Reports, Turners Falls Hydroelectric Project (FERC No. 1889) and Northfield Mountain Pumped Storage Project (FERC No. 2485) |
03/31/2015 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Form Flow 5000) |
03/31/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Comparative Flow Evaluation Form) |
03/31/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.7.3 Traditional Cultural Properties Study Report |
03/31/2015 |
Cultural |
Download
|
FirstLight Response to EPA Comments on Northfield Mountain Pumped Storage Project Sediment Management Plan – 2014 Summary of Annual Monitoring |
03/31/2015 |
Geology and Soils |
Download
|
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Form Flow 10000) |
03/31/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.3.18 Impacts of the Turner Falls Canal Drawdown on Fish Migration and Aquatic Organisms |
03/31/2015 |
Fish and Aquatics |
Download
|
Relicensing Study 3.6.3 Whitewater Boating Evaluation |
03/31/2015 |
Recreation and Land Use |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 1 |
02/24/2015 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment B-2007 to 2014 Photo Comparison |
02/24/2015 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 3 |
02/24/2015 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 6 |
02/24/2015 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 5 |
02/24/2015 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Cover Letter |
02/24/2015 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 4 |
02/24/2015 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 2 |
02/24/2015 |
Geology and Soils |
Download
|
FirstLight Study No. 3.3.16 Interim Report - Habitat Assessment, Surveys, and Modeling for State-Listed Mussel Speices in the Connecticut River below Cabot Station |
01/29/2015 |
Fish and Aquatics |
Download
|
FirstLight Study Report No. 3.7.2 Historic Architechtural Resources Survey & National Register Evaluation (Re-Submission) |
01/20/2015 |
Cultural |
Download
|
Filing of November 17, 2014 Meeting Minutes re: Consultation on Studies employing Hydroacoustic and Telemetry Methods |
12/22/2014 |
Fish and Aquatics |
Download
|
FirstLight Response to Stakeholder Comments on the Initial Study Report and Meeting Summary |
12/15/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Proposed Modification to Study Plan 3.3.2 Evaluate Upstream and Downstream Passage of Adult American Shad |
12/08/2014 |
Fish and Aquatics |
Download
|
Sediment Management Plan – Report of 2014 Activities for Northfield Mountain Pumped Storage Project (FERC No. 2485) |
12/01/2014 |
Geology and Soils |
Download
|
Proposed Study Plan for the Acoustic Evaluation of Juvenile American Shad and Adult American Eel Passage and Entrainment |
11/04/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Letter Response to Connecticut River Streambank Erosion Committee Full River Reconnaissance Data Request received October 22, 2014 |
10/29/2014 |
Geology and Soils |
Download
|
Revised Study Plan 3.3.20 Entrainment of American shad ichthyoplankton at the Northfield Mountain Pumped Storage Project |
10/16/2014 |
Fish and Aquatics |
Download
|
2014 Initial Study Meeting Summary |
10/15/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
2014 Initial Study Report Meeting-Call in Number |
09/25/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
2014 Initial Study Report Meeting Presentation |
09/25/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
2014 Initial Study Report. Study 3.1.1 |
09/15/2014 |
Geology and Soils |
Download
|
2014 Initial Study Report. Transmittal Letter |
09/15/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
2014 Initial Study Report. Summary Study 3.6.5. |
09/15/2014 |
Recreation and Land Use |
Download
|
2014 Initial Study Report. Summary Study 3.8.1. |
09/15/2014 |
Operations |
Download
|
2014 Initial Study Report. Summary Study 3.7.2. |
09/15/2014 |
Cultural |
Download
|
2014 Initial Study Report. Summary Study 3.6.6. |
09/15/2014 |
Recreation and Land Use |
Download
|
2014 Initial Study Report. Summary Study 3.6.7. |
09/15/2014 |
Recreation and Land Use |
Download
|
2014 Initial Study Report. Summary Study 3.3.7. |
09/15/2014 |
Fish and Aquatics |
Download
|
2014 Initial Study Report. Summary Study 3.4.1. |
09/15/2014 |
Terrestrial |
Download
|
2014 Initial Study Report. Summary Study 3.3.16. |
09/15/2014 |
Fish and Aquatics |
Download
|
2014 Initial Study Report. Summary Study 3.3.8. |
09/15/2014 |
Fish and Aquatics |
Download
|
2014 Initial Study Report. Summary Study 3.3.5. |
09/15/2014 |
Fish and Aquatics |
Download
|
2014 Initial Study Report. Summary Study 3.3.4. |
09/15/2014 |
Fish and Aquatics |
Download
|
2014 Initial Study Report. Summary Study 3.3.15. |
09/15/2014 |
Fish and Aquatics |
Download
|
2014 Initial Study Report. Summary Study 3.3.2. |
09/15/2014 |
Fish and Aquatics |
Download
|
2014 Initial Study Report. Summary Study 3.3.13. |
09/15/2014 |
Fish and Aquatics |
Download
|
2014 Initial Study Report. Summary Study 3.3.19. |
09/15/2014 |
Fish and Aquatics |
Download
|
2014 Initial Study Report. Summary Study 3.6.3. |
09/15/2014 |
Recreation and Land Use |
Download
|
2014 Initial Study Report. Summary 3.4.2. |
09/15/2014 |
Terrestrial |
Download
|
2014 Initial Study Report. Summary Study 3.5.1. |
09/15/2014 |
Wetlands |
Download
|
2014 Initial Study Report. Summary Study 3.6.1. |
09/15/2014 |
Recreation and Land Use |
Download
|
2014 Initial Study Report. Summary Study 3.7.1. |
09/15/2014 |
Cultural |
Download
|
2014 Initial Study Report. Study Summary 3.7.3a. |
09/15/2014 |
Cultural |
Download
|
2014 Initial Study Report. Summary 3.3.3. |
09/15/2014 |
Fish and Aquatics |
Download
|
2014 Initial Study Report. Summary Study 3.3.18. |
09/15/2014 |
Fish and Aquatics |
Download
|
2014 Initial Study Report. Summary Study 3.3.14. |
09/15/2014 |
Fish and Aquatics |
Download
|
2014 Initial Study Report. Summary Study 3.3.12. |
09/15/2014 |
Fish and Aquatics |
Download
|
2014 Initial Study Report. Summary Study 3.2.1. |
09/15/2014 |
Water Resources |
Download
|
2014 Initial Study Report. Summary Study 3.1.3. |
09/15/2014 |
Geology and Soils |
Download
|
2014 Initial Study Report. Summary study 3.3.10 |
09/15/2014 |
Fish and Aquatics |
Download
|
2014 Initial Study Report. Summary Study 3.3.11. |
09/15/2014 |
Fish and Aquatics |
Download
|
2014 Initial Study Report. Summary Study 3.3.6. |
09/15/2014 |
Fish and Aquatics |
Download
|
2014 Initial Study Report. Summary Study 3.3.9. |
09/15/2014 |
Fish and Aquatics |
Download
|
2014 Initial Study Report. Summary Study 3.6.4. |
09/15/2014 |
Recreation and Land Use |
Download
|
2014 Initial Study Report. Summary Study 3.3.17. |
09/15/2014 |
Fish and Aquatics |
Download
|
2014 Initial Study Report. Summary Study 3.6.2. |
09/15/2014 |
Recreation and Land Use |
Download
|
2014 Initial Study Report. Summary Study 3.3.1. |
09/15/2014 |
Fish and Aquatics |
Download
|
2014 Initial Study Report. Summary Study 3.2.2. |
09/15/2014 |
Water Resources |
Download
|
2014 Initial Study Report. Summary Study 3.1.2 |
09/15/2014 |
Geology and Soils |
Download
|
Study Plan for Entrainment of American Shad Ichthyoplankton at the Northfield Mountain Pumped Storage Project. Study # 3.3.20. DRAFT FOR CONSULTATION. |
09/05/2014 |
Fish and Aquatics |
Download
|
FERC Resolution of Dispute on Entrainment Study, and Clarification on Study 3.1.2 |
09/03/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Letter from FirstLight regarding Study No. 3.3.6 Impact of Project Operations on Shad Spawning, Spawning Habitat and Egg Deposition in the Area of the Northfield Mountain and Turners Falls Project. |
08/25/2014 |
Fish and Aquatics |
Download
|
FirstLight Hydro Generating Company files Notification of Dates and Agenda for 2014 Initial Study Report Meeting |
08/21/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Letter from FirstLight Re: Study No. 3.3.18- Impact of Turners Falls Canal Drawdown on Fish Migration and Aquatic Organisms |
08/15/2014 |
Fish and Aquatics |
Download
|
Letter from FirstLight pertaining to the causation study (Study No. 3.1.2) |
08/12/2014 |
Geology and Soils |
Download
|
FirstLight Hydro Generating Company files 2014 Study Progress Report |
07/23/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Staff Memo: Telephone conference 5/6/2014 between Commission Staff, Massachusetts Division of Fisheries and Wildlife, and FirstLight Hydro Generating Company |
05/07/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Supplemental Information submitted by Massachusetts Division of Fisheries and Wildlife under P-1889. et. al. , regarding documented presence of yellow lampmussel, eastern pondmussel, and tidewater mucket in Reach 5 of Project Area. |
05/05/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
USDOI/Fish and Wildlife Service/NEFO Submits ILP Proposed Study Plan or Revised Study under P-2485. |
05/02/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Letter Supplemental/Additional Information to FERC re USFWS Proposed Revised Study Plan |
05/02/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Letter requesting the Dispute Resolution Panel to provide recommendation by 5/2/14 re the Suspension of Dispute Resolution Panel |
05/02/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Supplemental Information from USDOI/Fish and Wildlife Service/NEFO re: Submitted ILP Proposed Study Plan or Revised Study under P-2485. |
05/02/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
U.S. Department of the Interior Response on the study dispute resolution process initiated by the U.S. Fish and Wildlife Service on March 13, 2014 |
05/01/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Study dispute resolution panel re Northfield Mountain Pumped Storage Project under P-2485. |
04/30/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Letter order approving FirstLight Approval Letter for Modified Study 3.6.3 – Whitewater Boating |
04/25/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Supplemental Information/Request of U.S. Fish and Wildlife Service/NEFO under P-2485. FWS Response to Panel Questions Study from April 8, 2014 Dispute Panel Questions for NMPS Project Study Dispute Technical Conference |
04/24/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Supplemental Information of FirstLight Hydro Generating Company under P-2485, et. al to Narragansett Indian Tribe (NIT) re: Traditional Cultural Properties Study |
04/24/2014 |
Cultural |
Download
|
FERC Staff Memo: Teleconference 4/22/2014 between Commission staff, the U.S. Fish and Wildlife Service (FWS) and FirstLight Hydro Generating Company (FirstLight) on the FWS’s formal dispute filed on March 13, 2014. |
04/24/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Comments and Information Regarding Notice of Study Dispute (4/16/2014) |
04/16/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Meeting Memo. FWS Formal Dispute Resolution. Meeting between Commission staff, the U.S. Fish and Wildlife Service (FWS) and FirstLight Hydro Generating Company (FirstLight) on the FWS’s formal dispute filed on March 13, 2014 |
04/16/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Hydro Generating Company provides maps depicting the final APE for Notifications of the impending archaeological investigations (P-1889 and P-2485). |
04/15/2014 |
Cultural |
Download
|
The Nolumbeka Project Inc. submits comments re the Phase 1A Archaeological Survey for relicensing of the Turners Falls & Northfield Mountain Pumped Storage Hydroelectric Projects |
04/15/2014 |
Cultural |
Download
|
FirstLight Hydro Generating Company submits Dye Test Information as requested as part of U.S. Fish and Wildlife Service Notice of Study Dispute under P-2485, et al. |
04/15/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Hydro Generating Company submits Drawings and Photographs requested as part of U.S. Fish and Wildlife Service Notice of Study Dispute (CEII) under P-2485, et al. |
04/15/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Memo. Supplemental Information of FERC Staff / Teleconference between Commission staff, the U.S. Fish and Wildlife Service (FWS) and FirstLight on the FWS's formal dispute filed on March 13, 2014 |
04/07/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Comments and Information Regarding Notice of Study Dispute (4/7/2014) |
04/07/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight files Information Relevant to U.S. Fish and Wildlife Service Notice of Study Dispute |
04/03/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments of Kevin Malone re: Dispute Resolution for the Turners Falls Hydroelectric Project (P-1889) and Northfield Mountain Pumped Storage Project(P-2485) |
04/01/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Hydro Generating Company Notifications of the impending archaeological investigations (P-1889 and P-2485). |
03/31/2014 |
Cultural |
Download
|
FERC Notice of dispute resolution panel meeting and technical conference (4/8/2014) re FirstLight Hydro Generating Company under P-2485. |
03/31/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments of Stakeholder Karl Meyer on FirstLight Repsonse/Filing Supplemental Information Relevant to U.S. Fish and Wildlife Service Notice of Study Dispute |
03/31/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Files Supplemental Information Relevant to U.S. Fish and Wildlife Service Notice of Study Dispute |
03/28/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Response to FERC Request for Northfield Mountain Pumped Storage Project, 1992 American Shad Study |
03/18/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight files Turners Falls Project - Fish Passage Facilities 2013 Annual Report of Operations |
03/15/2014 |
Fish and Aquatics |
Download
|
MADFW Additional Comment/Supplemental Information re: Documented Presence of State-listed Mussel Species in the Project Area |
03/13/2014 |
Fish and Aquatics |
Download
|
U.S. Fish and Wildlife Service/NEFO ILP Notice for Dispute Resolution of project study requests. |
03/13/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Staff Memo to Public Files: Tribal consultation telephone conference with the Narragansett Indian Tribe of Rhode Island |
03/12/2014 |
Cultural |
Download
|
FERC Staff Memo to Public Files - Email communication between Commission staff and FirstLight Re: Clarification on Study No. 3.3.7- Fish Entrainmental and Turbine Mortality Study |
03/07/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Staff Memo to Public Files -Telephone communications between Commission staff and the Massachusetts Division of Fisheries & Wildlife re: FERC's Study Plan Determination of the mussel studies (3.3.1, 3.3.11 and 3.3.16) |
03/07/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Letter to FirstLight re: Clarification of the Study Plan Determination for Aquatic Studies |
03/07/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Staff Memo to Public Files - Email communication between Commission staff and the U.S. Fish and Wildlife Service re: clarification of the February 21, 2014 study plan determination |
03/07/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Letter order approving FirstLight Hydro Generating Company's 9/13/13 filing of the Study 3.5.1 - Baseline Inventory of Wetland, Riparian & Littoral Habitat in Turners Falls Impoundment |
03/06/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Letter to FirstLight Hydro Generating Company providing the Study Plan Determination for Aquatic Studies - Turners Falls Hydroelectric Project and the Northfield Mountain Pumped Storage Project |
02/21/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FWS/NEFO Supplemental Comments on Revised Study Plan: Request for Additional Consultation on Studies 3.3.6 and 3.3.11 |
02/12/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Letter Additional Information on Study Plan 3.6.3, Whitewater Boating Evaluation |
02/10/2014 |
Recreation and Land Use |
Download
|
FERC Memo: FERC Staff Memo to Public Records documenting telephone conversation between Commission staff and Dr. Theodore Castro-Santos of the U.S. Geological Survey’s S.O. Conte Anadromous Fish Research Center |
02/03/2014 |
Fish and Aquatics |
Download
|
FERC Memo: Supplemental Information/Request of FERC Staff under P-1889, et. al..Communications between Commission staff and Bob Nasdor of the American Whitewater |
01/31/2014 |
Recreation and Land Use |
Download
|
FERC Memo: Supplemental Information/Request of FERC Staff under P-1889, et. al..Communications between Commission staff, and Mr. Mark Wamser and Mr. John Howard of FirstLight |
01/31/2014 |
Recreation and Land Use |
Download
|
FirstLight's letter to Narragansett Indian Tribal Historic Preservation Office regarding initiation of the Traditional Cultural Properties Study Plan (FERC Project No. 2485 and 1889) |
01/31/2014 |
Cultural |
Download
|
FERC Memo: Communications between FERC staff and the U.S. Geological Survey’s Conte Anadromous Fish Research Center (Conte Lab) |
01/29/2014 |
Fish and Aquatics |
Download
|
FirstLight Response to National Marine Fisheries Service Supplemental Comments on Study Plan |
01/28/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Letter Acknowledging Receipt of Sediment Management Plan - 2013 Summary of Annual Monitoring |
01/23/2014 |
Geology and Soils |
Download
|
FERC Letter reminding FirstLight Power Resources, LLC of their license obligation to gather recreation use data for a 12-month beginning no later than March 15, 2014, re Revised Form 80 for the Turners Falls |
01/22/2014 |
Recreation and Land Use |
Download
|
Additional Comments of American Whitewater's on Modified Revised Study Plan Study No. 3.6.3 (Whitewater Boating Evaluation) |
01/22/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Submittal of Modified Revised Study Plans, Study No.3.5.1(Baseline Inventory of Wetland, Riparian, and Littoral Habitat, and Assessment of Operational Impacts on Special-Status Species) and Study No.3.6.3 (Whitewater Boating Evaluation) |
01/13/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Report Regarding Conveyance of Easements, Rights-of-Way, or Leases in 2013 |
01/10/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Letter Approval for Modified Study Plan No. 3.6.7 Recreation Study at Northfield Mountain, including Assessment of Sufficiency of Trails for Shared Use |
01/10/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
VT SHPO concurrence with FERC's APE determination Turners Falls and Northfield Mountain Projects |
01/09/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments of Boyd Kynard, PhD on FERC Study Plan Determination, Study 4.2.3 Hydraulic Study of Turner Falls |
01/07/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments of Massachusetts Division of Fisheries and Wildlife on Draft Modified Revised Study Plan, Study No. 3.5.1 |
01/06/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments of Dorothy McIver on Northfield and Turner Falls Projects Relicensing power canal hydraulic study |
01/02/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comment of Garrett D. Connelly regarding socioeconomic and environmental positive goods not yet analyzed under P-1889. |
01/02/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comment of citizen Hazel Dawkins on Northfield Project Relicensing |
01/01/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comment of citizen Margo P. Jones on Turner Falls Project Relicensing |
12/30/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Massachusetts Historical Commission (MHC) submits letter to FERC: concurs with FERC's determination of the project APE |
12/19/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Letter to FirstLight Hydro Generating Company re the Interim ILP schedule for Study Plan Determination for the Turners Falls Project |
12/13/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Submittal of Modified Revised Study Plan, Study No. 3.6.7 (Recreation Study at Northfield Mountain, including Assessment of Sufficiency of Trails for Shared Use) |
12/11/2013 |
Recreation and Land Use |
Download
|
MA Division of Fisheries and Wildlife Comments on Technical Meeting (11/25/13) re:Effects of Decommissioning the Vermont Yankee Power Plant on Revised Proposed Study Plan |
12/06/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight submits to FERC 2013 Construction Progress Report MA Erosion Control Plan for Northfield Mountain Project, Riverbank Restoration Bathory-Gallagher and Wallace-Watson Sites. |
12/06/2013 |
Geology and Soils |
Download
|
Sediment Management Plan - 2013 Summary of Annual Monitoring |
12/02/2013 |
Geology and Soils |
Download
|
FERC Letter to FirstLight requesting their concurrence on the area of potential effects for the Turner Falls and Northfield Mountain Projects |
11/27/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Transcript of the 11/25/13 Scoping Meeting held in Northfield, MA |
11/27/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Department of Commerce, NOAA Supplemental Comments on FirstLight's Proposed Study Plan dated June 28, 2013 for Turner Falls and Northfield Mountain Pumped Storage |
11/22/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Letter order approving FirstLight Hydro Generating Company's 10/25/13 request for an extension of time until 1/13/14 to file modified study plans |
11/08/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Letter to FirstLight regarding the Request for Clarification of September 13, 2012 Study Plan Determination |
10/25/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Request for Extension of Time to File Modified Study Plans |
10/25/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Notification of November 25, 2013 Technical Meeting |
10/25/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Letter Postponement of October 16, 2013 Technical Meeting |
10/08/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Request for Clarification on an aspect of one of the 20 studies entitled: Study No. 3.2.2- Hydraulic Study of Turners Falls Impoundment, Bypassed Reach, and the Connecticut River below Cabot Station |
10/07/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Appalachian Mountain Club, Vermont River Conservancy, and the Friends of the Connecticut River Paddlers' Trail's Comments on the Revised Study Plans |
10/03/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Letter to Peter Champoux discussing the canal water seeping incident |
10/03/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Order Approving FirstLight 2013 Full River Reconnaissance (FRR) Report Schedule for the Northfield Mountain |
10/02/2013 |
Geology and Soils |
Download
|
FERC Letter Response to US Representative James P McGovern's 8/30/13 letter re FirstLight Hydro Generating Co's revised study plans for the relicensing of the Northfield Mountain Pumped Storage |
09/25/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Notification of October 16, 2013 Technical Meeting |
09/18/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Study Plan Determination for the Turner Falls Hydroelectric Project and The Northfield Mountain Punmped Storage Project |
09/13/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
U.S. Fish and Wildlife Service/NEFO Supplemental Comments on Revised Study Plan |
09/13/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
US House of Representatives Comments on the Revised Study Plan for Turner Falls and Northfield Mountain Pumped |
08/30/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Letter to FERC re: Impact on Relicensing Studies and Schedule due to Reported Closing of the Vermont Yankee Nuclear Project, Vernon, VT, Connecticut River |
08/30/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
New Hampshire Department of Environmental Services (NHDES) Comments on Revised Study Plan for FERC NO. 1889 (Turners Falls) and 2485 (Northfield Mountain) |
08/29/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments of the Landowners and Concerned Citizens for License Compliance on FirstLight Power's Revised Study Plan |
08/29/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Massachusetts Division of Fisheries and Wildlife Comments on Northfield Mountain and Turners Falls Revised Proposed Study Plan |
08/29/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
U.S. Fish and Wildlife Service/NEFO Comments on Revised Study Plan |
08/29/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
The Nature Conservancy Connecticut River Program Comments on Revised Study Plan |
08/29/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Donald Pugh Comments regarding FirstLight Revised Study Plans dated August 14, 2013 |
08/29/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
New Hampshire Fish and Game Department Comments on Impacts of Closure of Vermont Yankee Nuclear Power Plant on Results of Proposed Study Plans |
08/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Massachusetts Division of Fisheries and Wildlife (MADFW) Impacts of Closure of Vermont Yankee Nuclear Power Plant on Results of Proposed Study Plans |
08/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Massachusetts Department of Environmental Protection Comments on Revised Study Plans |
08/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Karl Meyer Comments on FirstLight Hydro Generating Company's Revised Study Plan (RSP) |
08/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Massachusetts Department of Conservation and Recreation Comments on Revised Study Plans |
08/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
National Oceanic and Atmospheric Administration (NOAA) Fisheries comments on Revised Study Plans |
08/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Franklin Regional Council of Governments Comment the Revised Study Plan (RSP) submitted by FirstLight August 14, 2013 |
08/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Supplement Information from L. McLoughlin and Warren Ondras Additonal Noise Spectral Plots |
08/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
American Whitewater Comment's on FirstLight Power's Revised Study Plan for the Turners Falls Hydroelectric |
08/27/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Massachusetts Historical Commission Comments on the Revised Proposed Study Plan |
08/26/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comment of Thomas J Christopher (New England Flow) Comments on Revised Study Plans |
08/26/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Letter to FERC re: Northfield Mountain Station submits the Erosion Control Plan Status and Update of Activities |
08/26/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments of National Park Service on RSP, Appl. For License / Relicense of FirstLight, Northeast Region |
08/23/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Revised Study Plan. Appendix F – Turners Falls Upstream Fish Passage CFD Modeling of Gatehouse Entrance |
08/14/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Revised Study Plan. Appendix E – Previous data and information for Adult American shad |
08/14/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Revised Study Plan. Appendix C – NRCS Chemical and Physical Soil Properties |
08/14/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Revised Study Plan. Appendix D – 2013 Full River Reconnaissance Study and Quality Assurance Project Plan |
08/14/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Revised Study Plan. Appendix H – Stakeholder Comments on Updated PSP |
08/14/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Revised Study Plan |
08/14/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Revised Study Plan. Appendix A – Study Request Letters |
08/14/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight's Letter to Narragansett Indian Tribal Historic Preservation Office, RE:Revised Study Plan, Traditional Cultural Properties Study Plan for Northfield Mountain Pumped Storage et al under P-2485 et al. |
08/14/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Revised Study Plan. Appendix G – 2011 Cabot Station Drawdown Juvenile American Shad Stranding Survey |
08/14/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Revised Study Plan. Appendix B – Resource Comments/Concerns and Response |
08/14/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Supplemental Information of FERC Staff under P-1892, et. al. Memo of Teleconference between Commission staff and representatives of TransCanada |
08/07/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight's request for approval Report on Uses and Occupancies of Project Lands (2013 Mitigation Implementation Report) |
08/05/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Supplemental Information/Request of FERC Staff Memo of Teleconference between Commission staff and Representatives of FirstLight Power Resources regarding PSP 3.1.2 |
07/23/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Massachusetts Historical Commission submits Comments on Updated Proposed Study Plan 3.7.1 |
07/16/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Vermont Department of Environmental Conservation Comments on Updated Proposed Study Plans for Turners Falls and Northfield Mountain |
07/15/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
VT Office of Historic Preservation Comments on Updated Proposed Study Plan |
07/15/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments from the Landowners and Concerned Citizens for License Compliance on the Updated Study Plan filed by FirstLight on June 28, 2013 |
07/15/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Connecticut River Watershed Council, Inc. (CRWC) Comments on the June 28, 2013 updated Proposed Study Plan |
07/15/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Franklin Regional Council of Governments Comments on the Updated Proposed Study Plan (PSP) submitted by FirstLight June 28, 2013 |
07/15/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
US Fish and Wildlife Service Comments on 6-28-13 Updated Proposed Study Plan |
07/15/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Town of Northfield Office of the Town Adminstrator Comments on Updated Proposed Study Plans 3.1.1 and 3.1.2 |
07/15/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comment of Katherine Putnam "Using the river for the lower reservoir is old technology and an old idea." |
07/15/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
National Marine Fisheries Service Comments on Updated Proposed Study Plans |
07/15/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Franklin Conservation District Comments on Proposed Study Plan for Turners Falls and Northfield Mountain |
07/15/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
The Nature Conservancy Connecticut River Program Comments on Proposed Study Plans for P-1889 and P-2485 |
07/15/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
New Hampshire Department of Environmental Services (NHDES) Comments on Updated Proposed Study Plan |
07/15/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Town of Gill Comments on the Updated Proposed Study Plan |
07/15/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Trout Unlimited's comments on FirstLight Proposed Study Plan |
07/15/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Karl Meyer Comments on FirstLight Hydro Generating Company's Updated Proposed Study Plan (PSP) |
07/14/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Nolumbeka Project, Inc. Traditional Cultural Properties Study Request |
07/14/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments to FERC from Steve Alves regarding FirstLight use of Connecticut River for Northfield Mountain Pumping Station |
07/14/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
National Park Service, Northeast Region comments on Proposed Study Plans Revision |
07/14/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
American Whitewater Comments on Updated Proposed Study Plan |
07/12/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Massachusetts Department of Environmental Protection comments to Proposed Study Plans under P-1889 |
07/12/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Massachusetts Division of Fisheries and Wildlife Comments on Updated Proposed Study Plan |
07/12/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC memo: Teleconference between Commission staff and the MA Division of Fisheries |
07/11/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
EPA Comments of EPA New England under P-2485, comments on PSP Section 3.1 Geology and Soils |
07/11/2013 |
Geology and Soils |
Download
|
New Hampshire Department of Fish and Game comments to Draft Proposed Study Plans |
07/11/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
NEW ENGLAND FLOW Comments on Updated Proposed Study Plans |
07/09/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Appeal to rejection of request for noise study of Warren Ondras under P-2485. |
07/08/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments from Peter Richardson on Northfield Mountain project |
07/08/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments from Philip Tomlinson on Northfield Mountain project |
07/08/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comment from Jane Whittlesey on Northfield Mountain project |
07/05/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments from Elizabeth Austin on Relicensing of the Northfield Pumped Storage Facility |
07/05/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Updated Proposed Study Plan (PSP) for the relicensing of the Turners Falls Project and Northfield Mountain Project |
06/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Letter Order denying U.S. Fish and Wildlife Service's request for a 15 days extension of time request on the licensees' proposed study plan re the TransCanada Hydro Northeast Inc et al under P-1892 et al |
06/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Information Concerning Request for Noise Study |
06/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Schedule for Filing 2013 Full River Reconnaissance Report |
06/27/2013 |
Geology and Soils |
Download
|
Letter to Peter Champoux from FERC responding to the 3/1/13 letter and the 6/19/13 email discussing the parcel of land that abuts the power canal wall of the Turners Falls Project under P-1889 |
06/25/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
The Commonwealth of Massachusetts submits comments on the Project Notification Form (PMF) for Turners Falls and Northfield Mountain |
06/21/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments of Fire Chief Robert Escott on effects of low water levels of Turner Falls Project |
06/21/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Franklin Regional Council of Governments (FRCOG) letter in Support of the Extension of Time Request to Comment Support for Extension of Time Request to Comment on Proposed Study Plans for five Hydroelectric Projects on the Connecticut River |
06/19/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Response to US Fish and Wildlife Service Extension of Time Request |
06/19/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comment of The Nature Conservancy, Connecticut River Program under P-1892, et. al..Support for the US Fish and Wildlife Service Extension of Time Request to Comment on Proposed Study Plans |
06/18/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Letter of Support for USFWS EOT by the New Hampshire Department of Environmental Services and request for extension of time to Comment on Draft Proposed Study Plans |
06/18/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Massachusetts Division of Fisheries and Wildlife Comments in regard to Extension of time request by the US Fish and Wildlife Service to Comment on Proposed Study Plans |
06/17/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
NOAA Fisheries comments in support for US Fish and Wildlife Service Extension of Time request on P-1889 Turners Falls and P-2485 Northfield Mtn Pump Storage |
06/17/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments of Connecticut River Watershed Council, Inc. under P-2485. "Support for the Extension of time request by the US Fish and Wildlife Service to Comment on Proposed Study Plans" |
06/17/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Donald Pugh comments re Trout Unlimited's EOT request to Comment on Draft Proposed Study Plans |
06/17/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
USDOI/Fish and Wildlife Service/NEFO Extension of Time Request to Comment on Proposed Study Plans |
06/14/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
U.S. Fish & Wildlife Service - Extension of Time Request to Comment of Proposed Study Plans |
06/13/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
June 11-12, 2013 Working Group 3: Recreation and Land Use Resources, Aesthetic Resources , Cultural Resources Meeting Presentation |
06/10/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
June 5, 2013 Working Group 2: Aquatic Resources, Terrestial, Wetlands, Riparian Resources Meeting Presentation |
06/05/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
June 4, 2013 Working Group 2: Aquatic Resources, Terrestial, Wetlands, Riparian Resources Meeting Presentation |
06/04/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
May 22, 2013 Working Group 2: Aquatic Resources, Terrestial, Wetlands, Riparian Resources Meeting Presentation |
05/22/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
May 21, 2013 Working Group 2: Aquatic Resources, Terrestial, Wetlands, Riparian Resources Meeting Presentation |
05/21/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
May 14, 2013 Broad Overview of All Proposed Studies Meeting Presentation |
05/14/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
May 14 (afternoon) and May 15, 2013 Working Group 1 (Geology and Soils, Water Resources, Developmental Resources) Meeting Presentation |
05/14/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Order approving report on existing uses and occupancies of project lands and waters re FirstLight Hydro Generating Company |
05/13/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Public Files Memo: Initial Tribal consultation meeting with the Narragansett Indian Tribe of Rhode Island |
05/03/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Massachusetts Historical Commission submits comments re the proposed study plan for the relicensing of the Turners Falls and Northfield Mountain Pumped Storage Hydroelectric |
04/24/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
April 16, 2013 Turners Fall Instream Flow Study Meeting: Study Process Overview Presentation |
04/16/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Scoping Document 2 for the Wilder (FERC No. 1892-026), Bellows Falls (FERC No. 1855-045), Vernon (FERC No. 1904-073), and Turners Falls (FERC No. 1889-081) hydroelectric projects, and the Northfield Mountain Pumped Storage Project (FERC No. 2485-063) |
04/15/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Proposed Study Plan (PSP) for the relicensing of the Turners Falls Project and Northfield Mountain Project (Volume 2 Appendix A) |
04/15/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Proposed Study Plan (PSP) for the relicensing of the Turners Falls Project and Northfield Mountain Project (Volume 1 without Appendices) |
04/15/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Proposed Study Plan (PSP) for the relicensing of the Turners Falls Project and Northfield Mountain Project (Volume 2 Appendices B-G) |
04/15/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Schedule for Meetings after formal meeting to discuss Proposed Study Plan |
04/05/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Study Requests of Deerfield River Trout Unlimited |
03/01/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments of Joanne McGee regarding Canoe/Kayaks access on Connecticut River |
03/01/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments and Study Requests of Kurt Heidinger for Biocitizen School of Environmental Philosophy and Practice |
03/01/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
The Nature Conservancy Comments on Scoping Document 1 and Study Requests for the Wilder, Bellows Falls (FERC No. 1855-045), Vernon (FERC No. 1904-073), and Turners Falls (FERC No. 1889-081) hydroelectric projects, and the Northfield Mountain Pumped Storag |
03/01/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comment of Howard Fairman re environmental impacts on migratory fish in relicensing of Northfield Mountain Pumped Storage. |
03/01/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments on Connecticut River Massachusetts water withdrawal by Massachusetts Farm Bureau Federation ( A. Richard Bonanno, Ph.D.) |
03/01/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
ILP Comments or Study Request of U.S. Fish and Wildlife Service/New England Field Office |
03/01/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Connecticut River Joint Commissions Comments on Integrated Licensing Process and Study Request for FERC project numbers P-1904 (Vernon), P-1855 (Bellows Falls), P-1892 (Wilder), 1889 (Turners Falls), No. 2485 (Northfield Mountain). |
03/01/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments on the PAD, Scoping Document 1, and Study Requests of Connecticut River Watershed Council, Inc. |
03/01/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Stefanie Krug Study Plan Request for the Northfield Mountain Trail Assessment under P-2485: Mountain Bike Trails Access |
03/01/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
ILP Comments or Study Request of Massachusetts Department of Environmental Protection |
03/01/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments and Study Request submitted by The Nolumbeka Project, Inc, et al |
03/01/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Letter to FirstLight Hydro Generating Company providing Identified PAD Deficiencies, Additional Information Requests, and Study Requests |
03/01/2013 |
Pre-Application Document |
Download
|
NMFS Study Requests and Comments regarding PAD |
03/01/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments on Scoping Document 1 for the Wilder, Bellows Falls, Vernon and Turners Falls hydroelectric projects, and the Northfield Mountain Pumped Storage Project from Northeast Climate Science Center |
03/01/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments on PAD, SD1 and Study Requests from Franklin Conservation District |
03/01/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comment and Study Requests of New England FLOW, American Whitewater and Appalachian Mountain Club |
03/01/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Supplemental Information of Vivien Venskowski of The River Residents Association. Connecticut River concerns on Extreme Water Level Fluctuations and Campsite License Terms |
03/01/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comment of Stefanie Krug (2) |
03/01/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comment of Stefanie Krug |
03/01/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
New Hampshire Department of Environmental Services Comments on Pre-Application Documents and Study Requests for 5 Hydroelectric Projects on the Connecticut River |
03/01/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
New England Farmers Union review of Pre-Application Documents |
03/01/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Stefanie Krug Additional information and comments letter for study request (Accession No. 20130301-5029) |
03/01/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
The Vermont Agency of Natural Resources (Agency) submits comments and requests for studies. |
03/01/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments and Study Requests in Response to the Notice of Intent to File License Application, Filing of Pre-Application Document (PAD), Commencement of Pre-Filing Process and Scoping and Request for Comments on the PAD and Scoping Document |
02/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Photos from Anonymous River Resident regarding the Turner Falls and Northfield Projects |
02/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
SD1 Comments, PAD Comments, and Study Requests of the Massachusetts Division of Fisheries and Wildlife (MADFW) |
02/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments on the Preliminary Application Document, Scoping Document 1, and Study Requests submitted by the Landowners and Concerned Citizens for License Compliance |
02/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Supplemental/Additional Information Response to Data Request of Town of Montague, MA, Native American Cultural Landscape District Properties in Turners Falls Management Plan |
02/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Appalachian Mountain Club, Vermont River Conservancy, and Friends |
02/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments of Chris Curtis re the Turners Falls Project Article from The Recorder: "Lower water hampers use of Connecticut River, Jeopardizes potential river rescue response." |
02/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments on the Preliminary Application Document, Scoping Document 1, and Study Requests submitted by Franklin Regional Council of Governments |
02/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments on the Preliminary Application Document, Scoping Document 1, and Study Requests submitted by the Town of Gill, MA Select Board and Conservation Commission |
02/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Transcript of 1/30/13 scoping meeting held in Turners Falls, Massachusetts for the Vernon, Northfield Mountain, and Turners Falls Hydroelectric Projects re TransCanada Hydro Northeast, Inc and FirstLight Hydro Generating Company |
02/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Transcript of 1/31/13 scoping meeting held in Turners Falls, Massachusetts for the Connecticut River Projects' Cumulative Effects re TransCanada Hydro Northeast, Inc and FirstLight Hydro Generating Company |
02/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Transcript of 1/31/13 scoping meeting held in Turners Falls, Massachusetts for the Northfield Mountain and Turners Falls Hydroelectric Projects re FirstLight Hydro Generating Company |
02/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments from Cynthia S. Dale of River Residents Association Connecticut River concerns regarding the Turner Falls Project and Northfield Mountain Projects |
02/25/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments from Robert Stafford and Family of River Residents Association, Connecticut River concerns regarding the Turner Falls and Northfield Projects |
02/25/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Comments by Karl Meyer, Greenfield, MA |
02/25/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments from Leena Newcomb of the River Residents Association re the Turners Falls Project |
02/25/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments from Michael and Diane Kane of River Residents Association, Connecticut River concerns regarding the Turner Falls and Northfield Projects |
02/25/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Letter to FERC from Connecticut River Residents concerning Northfield Mountain and Turners Falls Dam licensing issues |
02/25/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments from Robert and Linda Emond of River Residents Association, Connecticut River concerns regarding the Turner Falls and Northfield Projects |
02/25/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments or Study Request of Ashuelot River Local Advisory Committee |
02/24/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Draft Study plan - "Conduct Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station" |
02/22/2013 |
Fish and Aquatics |
Download
|
FERC Filing: Comment of FirstLight Hydro Generating Company on Scoping Document 1 under P-1889, et. al. |
02/22/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Northfield Conservation Commission, Town of Northfield, MA submits Comments re Northfield Mountain Pumped Storage Project |
02/22/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments of Four Star Farms, Inc. re the Northfield Mountain Relicensing |
02/20/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Filing: Supplemental Information of FERC Staff under P-1889, et. al.. Town of Montague files the National Register Eligibility Notification for the Turners Falls Ceremonial Site and concept paper for the Great Falls Native Cultural Park |
02/20/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
The Western Massachusetts Climbers’ Coalition Scoping Comments for the Northfield Mountain Pumped Storage Project |
02/20/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Filing: Supplemental Information of FERC Staff under P-1889, et. al.. Email communications between Kenneth Hogan of the Commission's Staff and Ms. Leena Newcomb representing The River Residents Association |
02/20/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments from Stanley Johnson of River Residents Association regarding the Turner Falls and Northfield Projects |
02/16/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments from Peter W. Conway of River Residents Association re regarding the Turner Falls Project and Northfield Mountain Projects |
02/16/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Filing: REFILE of the Request of Massachusetts Division of Fisheries and Wildlife under P-1889, et al. |
02/11/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Filing: Submitted on behalf of the Landowners and Concerned Citizens for License Compliance. Comments on the draft QAPP for the 2013 Full River Reconnaissance |
02/04/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments of Thomas Shearer et al re the Northfield Mountain Pumped Storage Project |
01/31/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments from Leena Newcomb of River Residents Association regarding the Turner Falls Project and Northfield Mountain Projects |
01/31/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Scoping proposal for noise study, filed by Warren Ondras |
01/31/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments from the Appalachian Mountain Club, headquartered in Boston, Mass., on riverwide issues in the proposed relicensing Connecticut River Facilities. |
01/30/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments from the Appalachian Mountain Club (AMC Riverwide Issues) |
01/30/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
1/30/2013 - 1/31/2013 - FERC Scoping Meetings Presentation |
01/30/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Landowners & Concerned Citizens for License Compliance (LCCLC) Comments on proposed Relicensing of Turner Falls and Northfield Mountain |
01/30/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
New England Flow and American Whitewater's Comments and Study Requests |
01/30/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Instream Flow Study Scoping Meeting with Fish Agencies |
01/24/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Massachusetts Historical Commission comments to assist in compliance with Section 106 of the National Historic Preservation Act oof 1966 as amended (36 CFR 800). |
01/16/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
WD Cowls, Inc. submit comments in lieu of attending FERC Scoping Meeting |
01/14/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Aquatic Mesohabitat Assessment and Mapping prepared by FirstLight (2012) |
01/08/2013 |
Fish and Aquatics |
Download
|
Analysis of Erosion in Vicinity of Route 10 Bridge Spanning the Connecticut River prepared by Simons & Associates (2012). |
01/08/2013 |
Geology and Soils |
Download
|
Freshwater Mussel Survey in the Connecticut River for the Turners Falls and Northfield Mountain Hydroelectric Projects prepared by Biodrawversity (2012) |
01/08/2013 |
Fish and Aquatics |
Download
|
Riverbank Erosion Comparison along the Connecticut River prepared by Simons & Associates (2012) |
01/08/2013 |
Geology and Soils |
Download
|
Scoping Document 1 for TransCanada Hydro Northeast Inc. (Wilder Project, Bellows Falls, Vernon Project) and FirstLight (Turner Falls, Northfield Mountain) |
12/21/2012 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Modification to Integrated Licensing Process Schedule |
12/21/2012 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Pre-Application Document (PAD) For The Turners Falls Hydroelectric Project (No. 1889) and the Northfield Mountain Pumped Storage Project (No. 2485) |
10/30/2012 |
Pre-Application Document |
Download
|
Notification of Intent (NOI) of Firstlight Hydro Generation Company to File an Application for A New License For The Turners Falls Hydroelectric Project (No. 1889) and the Northfield Mountain Pumped Storage Project (No. 2485) |
10/30/2012 |
Notice of Intent |
Download
|
Field, John. 2011. Detailed Analysis of the 2008 Full River Reconnaissance of the Turners Falls Pool on the Connecticut River: Unpublished report prepared for The Landowners and Concerned Citizens for License Compliance. |
01/01/2011 |
Geology and Soils |
Download
|
Field Geology Services. (2007). Fluvial geomorphology study of the Turners Falls Pool on the Connecticut River between Turners Falls, MA and Vernon, VT. Prepared for Northfield Mountain Pumped Storage Project. Farmington, ME: Field Geology Services. |
01/01/2007 |
Geology and Soils |
Download
|
US Army Corps of Engineers (USACE). 1991. General investigation study - Connecticut River streambank erosion. Waltham, MA: USACE, New England Division. |
01/01/1991 |
Geology and Soils |
Download
|
Northrop, Devine and Tarbell, Inc.. 1991. Connecticut River Riverbank Management Master Plan (Draft). Northeast Utilities Service Company, Inc. |
01/01/1991 |
Geology and Soils |
Download
|
Simons, D.B., Andrew, J.W., Li, R.M., & Alawady, M.A. (1979). Connecticut River Streambank Erosion Study: Massachusetts, New Hampshire, and Vermont. Waltham, MA: US Army Corps of Engineers (USACE). |
01/01/1979 |
Geology and Soils |
Download
|