Licensing Documents

Filter

Document Title Date of Filing Contents Download
NFM AFLA Volume 1 of 5 12/04/2020 Amended Final License Application Download
TF and NFM AFLA Executive Summary 12/04/2020 Amended Final License Application Download
TF AFLA Volume 1 of 5 12/04/2020 Amended Final License Application Download
TF and NFM AFLA Volume 2 of 5 (Part 3 of 4) 12/04/2020 Amended Final License Application Download
TF and NFM AFLA Cover letter 12/04/2020 Amended Final License Application Download
TF and NFM AFLA Volume 2 of 5 (Part 4 of 4) 12/04/2020 Amended Final License Application Download
TF and NFM AFLA Volume 2 of 5 (Part 2 of 4) 12/04/2020 Amended Final License Application Download
TF and NFM AFLA Volume 2 of 5 (Part 1 of 4) 12/04/2020 Amended Final License Application Download
FirstLight cover letter for filing Relicensing Study 3.3.19 Ultrasound Array and Cabot Station Shad Mortality Study (March 2019) 03/31/2020 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Relicensing Study 3.3.19 Ultrasound Array and Cabot Station Shad Mortality Study (March 2019) 03/01/2020 Fish and Aquatics Download
FirstLight submits request to revise schedule for filing Amended License Application 02/10/2020 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight cover letter for filing Revised (Jan 2020) Relicensing Study 3.7.1 Phase II MA Report 02/03/2020 Cultural Download
FirstLight cover letter for filing Relicensing Study 3.7.1 Phase II MA Report (Evaluations of 17 Archaeological Sites) 10/18/2019 Cultural Download
FirstLight submits fifth Monthly Progress Report for Massachusetts Phase II Archaeological Report 10/04/2019 Cultural Download
FirstLight cover letter for filing Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the bypass Reach and below Cabot Station -Addendum 7 09/30/2019 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the bypass Reach and below Cabot Station -Addendum 7 09/01/2019 Fish and Aquatics Download
FirstLight submits fourth Monthly Progress Report for Massachusetts Phase II Archaeological Report 08/30/2019 Cultural Download
FirstLight submits third Monthly Progress Report for Massachusetts Phase II Archaeological Report 08/05/2019 Cultural Download
FirstLight submits second Monthly Progress Report for Massachusetts Phase II Archaeological Report 07/05/2019 Cultural Download
​FirstLight submits response to Connecticut River Conservancy (CRC) Comments on 2019 Updated Study Reports 3.3.19, 3.3.9 and 3.7.1 06/13/2019 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight submits first Monthly Progress Report for Massachusetts Phase II Archaeological Report 06/06/2019 Cultural Download
FirstLight cover letter for filing Northfield Mountain Generation Station CFD Modeling for Fish Exclusion Net Forces Report 06/03/2019 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Northfield Mountain Generation Station CFD Modeling for Fish Exclusion Net Forces Report 06/01/2019 Fish and Aquatics Download
FirstLight submits response to Massachusetts Division of Fisheries and Wildlife relative to Mussel Assessment 05/29/2019 Fish and Aquatics Download
FirstLight submits request to FERC for time extension regarding the Phase II Archaeological Report 05/06/2019 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight cover letter filing Final 2019 Ultrasound Array Control Study (Updated) 04/30/2019 Fish and Aquatics Download
FirstLight cover letter for FERC filing Relicensing Study 3.3.1 Addendum 6 04/19/2019 Fish and Aquatics Download
FirstLight Study Meeting Summary and presentation (March 29, 2019) 04/15/2019 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight proposed schedule for Amended License Application 04/12/2019 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the bypass Reach and below Cabot Station -Addendum 6 Assessment of Sea Lamprey and Yellow Lampmussels in Reach 4 04/01/2019 Fish and Aquatics Download
Relicensing Study 3.3.19 - Final 2019 Ultrasound Array Control Study (Updated) 04/01/2019 Fish and Aquatics Download
FirstLight cover letter for filing 3/29/19 meeting agenda and Relicensing Study No. 3.3.19 Ultrasound Array 2018 report and the Proposed 2019 ultrasound array control study plan and the Relicensing Study No. 3.7.1 Phase IB Archaeological Survey for MA 03/12/2019 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Relicensing Study 3.3.19 Evaluate the Use of an Ultrasound Array to Facilitate Upstream Movement to Turners Falls Dam by avoiding Cabot Station Tailrace -2018 Study Report 03/01/2019 Fish and Aquatics Download
FirstLight cover letter filing Relicensing Study 3.3.1 Addendum 5 and Relicensing Study 3.5.1 Addendum 3 03/01/2019 Wetlands Download
Relicensing Study 3.3.19 Proposed 2019 Ultrasound Array Control Study 03/01/2019 Fish and Aquatics Download
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station Addendum 5 Assessment of Sea Lamprey (new spawning HSI curves) and Yellow Lampmussels in Reach 3 03/01/2019 Fish and Aquatics Download
Relicensing Study 3.5.1 Baseline Inventory of Wetland Riparian and Littoral Habitat in the Turners Falls Impoundment and Assessment of Operational Impacts on Special Species Addendum Tiger Beetles 03/01/2019 Wetlands Download
FirstLight submits response to comments on various Study Report Addendums that were filed between April 3, 2017 and May 1, 2018 12/21/2018 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Letter FirstLight filing Phase IB and Phase II Reports for Archaeological Investigations in Vermont, New Hampshire, and Massachusetts as part of Relicensing Study No. 3.7.1 12/14/2018 Cultural Download
FirstLight files October 9, 2018 Study Report Meeting Summary 10/24/2018 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight files Conference Call-In Number for October 9, 2018 Study Plan Meeting 09/21/2018 FERC Scoping/Integrated Licensing Process (ILP) Process Download
​FirstLight files Agenda for October 9, 2018 Study Plan Meeting 09/13/2018 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight submits Request for Extension of Time to Complete Archaeological Surveys, Relicensing Study Nos 3.7.1 and 3.7.3 07/17/2018 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Cover Letter FirstLight files Response to FERC’s Additional Information Request dated June 21, 2018 regarding Phase IB Archaeological Surveys 07/16/2018 Cultural Download
FirstLight's response to the USFWS letter requesting the report titled Juvenile American Shad Assessment in the Connecticut River – Fall 2017 06/28/2018 Fish and Aquatics Download
FirstLight request waiver of the requirement to conduct Phase IB Archaeological Surveys on lands owned by GRH and within the FERC project boundary 06/20/2018 Cultural Download
Cover letter FirstLight files request to FERC regarding Phase IB Archaeological Surveys 05/31/2018 Cultural Download
FirstLight submits notification letter and attachments to FERC of Additional Proposed Study- Barrier Net Assessment 05/10/2018 Fish and Aquatics Download
Cover Letter FirstLight files outstanding Relicensing Study Addendums for Study 3.3.1 and 3.3.15 05/01/2018 Fish and Aquatics Download
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station Addendum 3 Assessment of Yellow Lampmussels in Reach 3 05/01/2018 Fish and Aquatics Download
Relicensing Study 3.3.15 Assessment of Sea Lamprey Spawning within Assessment of Sea Lamprey Spawning within Turners Falls Turners Falls Project Northfield Mountain Project Area Addendum 1 Impact on Sea Lamprey Spawning Nests near Stebbins Island 05/01/2018 Fish and Aquatics Download
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station Addendum 2 IFIM Study for Mussels in Reach 5 05/01/2018 Fish and Aquatics Download
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station Addendum 4 New Sea Lamprey Weighed Usable Area Curves based on Agency Proposed Habitat Suitability Index Curves 05/01/2018 Fish and Aquatics Download
FirstLight Submittal of RMC 1994 Report 04/19/2018 Fish and Aquatics Download
FirstLight Response to Stakeholder Comments on Study Plan 3.3.19 04/13/2018 Fish and Aquatics Download
FirstLight Response to FERC’s March 13, 2018 letter regarding Downstream Juvenile Shad Study No. 3.3.3 (Harza_RMC_1993) 04/06/2018 Fish and Aquatics Download
FirstLight Response to FERC’s March 13, 2018 letter regarding Downstream Juvenile Shad Study No. 3.3.3 (RMC_1994) 04/06/2018 Fish and Aquatics Download
FirstLight Response to FERC’s March 13, 2018 letter regarding Downstream Juvenile Shad Study No. 3.3.3 04/06/2018 Fish and Aquatics Download
FirstLight Response to FERC’s March 13, 2018 letter regarding Downstream Juvenile Shad Study No. 3.3.3 (RMC_1995) 04/06/2018 Fish and Aquatics Download
FirstLight Response to FERC’s March 13, 2018 letter regarding Downstream Juvenile Shad Study No. 3.3.3 (Harza_RMC_1992) 04/06/2018 Fish and Aquatics Download
FirstLight files record of MADFW correspondence supporting the delay on conducting the Juvenile Shad Study Report 3.3.3 02/28/2018 Fish and Aquatics Download
FirstLight Update to FERC on Study Report 3.7.1 02/26/2018 Cultural Download
FirstLight Update to FERC Outstanding Addendums, Additional Proposed Studies and Proposed Schedule 02/23/2018 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight cover letter filing 2017 Relicensing Study 3.3.1 IFIM for Reach 5 Mussels 08/23/2017 Fish and Aquatics Download
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station - IFIM for Mussels 2017 08/01/2017 Fish and Aquatics Download
FirstLight files Response to Stakeholder Requests for Study Modifications and/or New Studies Based on the Study Report 05/30/2017 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight files status of additional data required for Relicensing Studies No. 3.3.1 and 3.3.15 by FERC's February 17, 2017 Study Plan Determination Letter 05/11/2017 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Cover Letter for filing 2017 Study Report 3.3.2, 3.3.3 Addendums and 3.3.1 Errata 05/01/2017 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Relicensing Study 3.3.3 Evaluate Downstream Pass Evaluate Downstream Pass Evaluate Downstream Passage Addendum 1 05/01/2017 Fish and Aquatics Download
​Errata Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment E2 Errata) 05/01/2017 Fish and Aquatics Download
Relicensing Study 3.3.2 Evaluate Upstream and Downstream Passage Addendum 1 05/01/2017 Fish and Aquatics Download
FirstLight response Massachusetts Department of Environmental Protection (MADEP) comments on the Erosion Causation Report letter dated December 14, 2016 04/03/2017 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Transmittal Letter FERC filing 2017 Study Reports 3.1.2 (re-issue), 3.3.1 Addendum 1, 3.5.1 Addendum 2 04/03/2017 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight analysis of expanded use of the Upper Reservoir on potential shoreline erosion of the Turners Falls Impoundment 04/03/2017 Operations Download
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume III (Re-Issue 2017) Appendix J-II 04/01/2017 Geology and Soils Download
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D7) 04/01/2017 Fish and Aquatics Download
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment E2) 04/01/2017 Fish and Aquatics Download
Relicensing Study 3.5.1 Baseline Inventory of Wetland, Riparian and Littoral Habitat in the Turners Falls Impoundment and Assessment of Operational Impacts on Special Status Species Addendum 2 - Public Version (Attachment) 04/01/2017 Wetlands Download
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment E1) 04/01/2017 Fish and Aquatics Download
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D2) 04/01/2017 Fish and Aquatics Download
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 04/01/2017 Fish and Aquatics Download
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume III (Re-Issue 2017) 04/01/2017 Geology and Soils Download
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D3) 04/01/2017 Fish and Aquatics Download
Relicensing Study 3.5.1 Baseline Inventory of Wetland, Riparian and Littoral Habitat in the Turners Falls Impoundment and Assessment of Operational Impacts on Special Status Species Addendum 2 - Public Version 04/01/2017 Wetlands Download
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D6) 04/01/2017 Fish and Aquatics Download
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D1) 04/01/2017 Fish and Aquatics Download
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume I (2017) 04/01/2017 Geology and Soils Download
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D4) 04/01/2017 Fish and Aquatics Download
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D5) 04/01/2017 Fish and Aquatics Download
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume II (Re-Issue 2017) 04/01/2017 Geology and Soils Download
FirstLight Study Report Meeting Summary (March 16, 2017) 03/31/2017 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Presentation for Study Report Meeting March 16, 2017 03/16/2017 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Relicensing Study 3.8.1 Evaluate the Impact of Current and Potential Future Modes of Operations on Flow, Water Elevation and Hydropower Generation 03/01/2017 Operations Download
FirstLight Response to the January 17, 2017 letter from the Elnu Abenaki Tribe regarding Traditional Cultural Properties Study 03/01/2017 Cultural Download
FirstLight Response to the January 15, 2017 letter from the Narragansett Indian Tribe (NIT) regarding Traditional Cultural Properties Study 03/01/2017 Cultural Download
Transmittal Letter Filing of Study Reports 3.3.5, 3.3.19, 3.8.1 and Agenda for Study Report Meeting, March 16, 2017 03/01/2017 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Relicensing Study 3.3.5 Evaluate Downstream Passage of American Eel 03/01/2017 Fish and Aquatics Download
Relicensing Study 3.3.19 Evaluate the use of Ultrasound Array to Facilitate Upstream Movement to Turners Falls Dam by Avoiding Cabot Station Tailrace 03/01/2017 Fish and Aquatics Download
FirstLight Notification of Updated Study Report Meeting March 1, 2017 02/23/2017 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight letter to FERC requesting filing date extension until April 3, 2017 for Study No. 3.1.2 Addendum 02/22/2017 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Response to Stakeholder Requests for Study Modifications and/or New Studies Based on the Study Report and Meeting Summary (1/17/2017) 01/17/2017 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Transmittal Letter FERC filing Study Reports 3.3.10 and 3.3.20 12/28/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Discuss Instream Flow Study (FirstLight Study No 3.3.1) Meeting Summary (12/2/2016) 12/02/2016 Fish and Aquatics Download
Relicensing Study 3.3.20 Ichthyoplankton Entrainment Assessment at Northfield Mountain Project -Second year 12/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.10 Assess Operational Impacts on Emergence of State-Listed Odonates in the Connecticut River 2014-2016 Study Report 12/01/2016 Fish and Aquatics Download
FirstLight Notification Letter providing revised FERC filing date for the Relicensing Study Report No. 3.1.2 Northfield Mountain/Turners Falls Operations Impacts on Existing Erosion and Potential Bank Instability Addendum 11/18/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Updated Study Report (URS) Study Meeting Summary (10/31/16 - 11/1/2016) 11/15/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Presentation for Study Report Meetings Oct 31, 2016 and Nov 1, 2016 10/31/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Transmittal Letter filing 10 Study Reports, 3 Addenda and Agenda for Study Report Meetings Oct 31, 2016 and Nov 1, 2016 10/14/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Relicensing Study 3.3.3 Evaluate Downstream Passage of Juvenile American Shad Interim Study Report 10/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.8 Computational Fluid Dynamics Modeling in the Vicinity of the Fishway Entrances and Powerhouse Forebays Addendum 10/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.15 Assessment of Adult Sea Lamprey Spawning within the Turners Falls Project and Northfield Mountain Project Area (same report as posted 6/30/16) 10/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.13 Impacts of the Turners Falls Project and Northfield Mountain Project on Littoral Zone Fish Habitat and Spawning Habitat Study Report (same report as posted 6/30/2016) 10/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station 10/01/2016 Fish and Aquatics Download
Relicensing Study 3.1.2 Northfield Mountain/Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report, Volume I (2016) 10/01/2016 Geology and Soils Download
Relicensing Study 3.1.3 Northfield Mountain Pumped Storage Project Sediment Management Plan 10/01/2016 Geology and Soils Download
Relicensing Study 3.1.2 Northfield Mountain/Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report, Volume III (2016) 10/01/2016 Geology and Soils Download
Relicensing Study 3.1.2 Northfield Mountain/Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report, Volume II (2016) 10/01/2016 Geology and Soils Download
Relicensing Study 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station (Appendix E) 10/01/2016 Fish and Aquatics Download
Relicensing Study 3.6.6 Assessment of Effects of Project Operation on Recreation and Land Use 10/01/2016 Recreation and Land Use Download
Relicensing Study 3.5.1 Baseline Inventory of Wetland, Riparian and Littoral Habitat in the Turners Falls Impoundment and Assessment of Operational Impacts on Special Status Species Addendum - Public Version 10/01/2016 Wetlands Download
Relicensing Study 3.3.16 Habitat Suitability Criteria for State-listed Mussel Species in the Connecticut River below Cabot Station Study Report 10/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.7 Fish Entrainment and Turbine Passage Mortality Study 10/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.2. Evaluate Upstream and Downstream Passage of Adult American Shad Study Report 10/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.3 Evaluate Downstream Passage of Juvenile American Shad Interim Study Report 10/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.6 Impact of Project Operations on Shad Spawning, Spawning Habitat and Egg Deposition in the area of the Northfield Mountain and Turners Falls Projects Addendum 10/01/2016 Fish and Aquatics Download
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume II (2016) 09/01/2016 Geology and Soils Download
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume I (2016) 09/01/2016 Geology and Soils Download
Relicensing Study 3.3.15 Assessment of Adult Sea Lamprey Spawning within the Turners Falls Project and Northfield Mountain Project Area 06/30/2016 Fish and Aquatics Download
Relicensing Study 3.3.13 Impacts of the Turners Falls Project and Northfield Mountain Project on Littoral Zone Fish Habitat and Spawning Habitat Study Report 06/30/2016 Fish and Aquatics Download
FirstLight letter to FERC notifying study reports 3.3.13 and 3.3.15 uploaded to website 06/30/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Response to Stakeholder Requests for Study Modifications and/or New Studies Based on the Study Report and Meeting Summary (5/31/2016) 05/31/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Final License Application Exhibit H 04/29/2016 Final License Application Download
Final License Application Exhibit C 04/29/2016 Final License Application Download
Final License Application Exhibit G 04/29/2016 Final License Application Download
Final License Application Initial Statement and Additional Information 04/29/2016 Final License Application Download
Final License Application Exhibit D 04/29/2016 Final License Application Download
Final License Application Exhibit B 04/29/2016 Final License Application Download
Final License Application Exhibit E 04/29/2016 Final License Application Download
Final License Application Exhibit A 04/29/2016 Final License Application Download
Final License Application Cover Letter 04/29/2016 Final License Application Download
Responses to Connecticut River Watershed Council comment letter dated March 25, 2016 and Mr. Karl Meyer comment letter dated March 27, 2016 04/22/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
March 16, 2016, Study Meeting Summary. 03/31/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight- March 16, 2016 Study Report Meeting 03/14/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight - March 8, 2016 Study 3.3.2 Adult Shad Telemetry Data Analysis Meeting. Presentation. 03/08/2016 Fish and Aquatics Download
FirstLight - March 8, 2016 Study 3.3.2 Adult Shad Telemetry Data Analysis Meeting. Memorandum. 03/08/2016 Fish and Aquatics Download
Relicensing Study 3.2.1 Water Quality Monitoring Study 03/01/2016 Water Resources Download
Relicensing Study 3.3.6 Impact of Project Operations on Shad Spawning, Spawning Habitat and Egg Deposition in the area of the Northfield Mountain and Turners Falls Projects 03/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.11 Fish Assemblage Assessment 03/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.12 Evaluation of Emergency Gate and Bypass Flume Discharges 03/01/2016 Fish and Aquatics Download
Filing of Study Reports, Proposed Schedule, and Process Plan for Remaining Study Reports 03/01/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Revised Study Plan 3.3.19 - Evaluate the Use of an Ultrasound Array to Facilitate Upstream Movement to Turners Falls Dam by Avoiding Cabot Station Tailrace 02/18/2016 Fish and Aquatics Download
Relicensing Study 3.3.4 Evaluate Upstream Passage of American Eel at the Turners Falls Project 02/12/2016 Fish and Aquatics Download
Notification of Study Report Meeting, March 16, 2016 02/12/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Relicensing Study 3.3.20 Ichthyoplankton Entrainment Assessment at the Northfield Mountain Pumped Storage Project 02/12/2016 Fish and Aquatics Download
Relicensing Study 3.5.1 Baseline Inventory of Wetland, Riparian and Littoral Habitat in the Turners Falls Impoundment, and Assessment of Operational Impacts on Special-Status Species 02/12/2016 Wetlands Download
Relicensing Study 3.3.18 Impacts of the Turners Falls Canal Drawdown on Fish Migration and Aquatic Organisms Addendum 02/12/2016 Fish and Aquatics Download
Relicensing Study 3.2.2 Hydraulic Study Addendum 02/04/2016 Water Resources Download
Relicensing Study 3.4.1 Baseline Study of Terrestrial Wildlife and Botanical Resources 02/04/2016 Terrestrial Download
Relicensing Study 3.3.8 Computational Fluid Dynamics Modeling in the Vicinity of the Fishway Entrances and Powerhouse Forebays 02/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.10 Assess Operational Impacts on Emergence of State-Listed Odonates in the Connecticut River 02/01/2016 Fish and Aquatics Download
FERC Letter Determination on Requests for Study Modifications and New Studies 01/15/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Relicensing Study 3.6.1 Recreation Use/User Contact Survey Study Report 12/31/2015 Recreation and Land Use Download
Relicensing Study 3.6.5 Land Use Inventory Study Report 12/31/2015 Recreation and Land Use Download
FirstLight ​Response to Stakeholder Requests for Study Modifications and/or New Studies Based on the Updated Study Report and Meeting Summary 12/14/2015 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Draft License Application Exhibit E 12/02/2015 Draft License Application Download
Draft License Application Exhibit D 12/02/2015 Draft License Application Download
Draft License Application Cover Letter 12/02/2015 Draft License Application Download
Draft License Application Exhibit C 12/02/2015 Draft License Application Download
Draft License Application 12/02/2015 Draft License Application Download
Draft License Application Exhibit A 12/02/2015 Draft License Application Download
Draft License Application - Initial Statement and Additional Information 12/02/2015 Draft License Application Download
Draft License Application Exhibit G 12/02/2015 Draft License Application Download
Draft License Application Exhibit H 12/02/2015 Draft License Application Download
Sediment Management Plan – Report of 2015 Activities for Northfield Mountain Pumped Storage Project (FERC No. 2485) 12/01/2015 Geology and Soils Download
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace (Appendix A) 12/01/2015 Water Resources Download
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace (Appendix B Velocity) 12/01/2015 Water Resources Download
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace 12/01/2015 Water Resources Download
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace (Appendix B Depth) 12/01/2015 Water Resources Download
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace (Appendix B Water Surface) 12/01/2015 Water Resources Download
Relicensing Study 3.7.2 Historic Architectural Resources Survey & National Register Evaluation Study Report Addendum 11/16/2015 Cultural Download
FirstLight submits requested survey data relating to Relicensing Study No. 3.6.3 Whitewater Boating Evaluation and Study No. 3.6.7 Recreation Study at Northfield Mountain, Including Assessment of Sufficiency of Trails For Shared Use 11/10/2015 Recreation and Land Use Download
FirstLight 2015 Updated Study Meeting Summary, held on 9/29/15-9/30/15 10/14/2015 FERC Scoping/Integrated Licensing Process (ILP) Process Download
2015 Updated Study Report Presentation 09/28/2015 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Updated Study Report Summary 3.3.11 Fish Assemblage Assessment 09/14/2015 Fish and Aquatics Download
FirstLight Transmittal Letter for 2015 Updated Study Report FERC Submission 09/14/2015 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Updated Study Report Summary 3.8.1 Evaluate the IMpact of Current and Proposed Future Modes of Operation on Flow, Water Elevation and Hydropower Generation 09/14/2015 Operations Download
Updated Study Report Summary 3.7.2 Historical Architechtural Resources Survey & National Register Evaluation 09/14/2015 Cultural Download
Updated Study Report Summary 3.7.1 Phase IA (Reconnaissance) Archaeological Survey 09/14/2015 Cultural Download
Updated Study Report Summary 3.6.6 Assessment of Effects of Project Operation on the Recreation and Land Use 09/14/2015 Recreation and Land Use Download
Updated Study Report Summary 3.6.5 Land Use Inventory 09/14/2015 Recreation and Land Use Download
Updated Study Report Summary 3.6.1 Recreational Use/User Contact Survey 09/14/2015 Recreation and Land Use Download
Updated Study Report Summary 3.3.7 Fish Entrainment and Turbine Passage Mortality Study 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.2 Evaluate Upstream and Downstream Passage of Adult American Shad 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.19 Evaluate the Use of an Ultrasound Array to Facilitate Upstream Movement of American Shad at Turner Falls 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.5.1 Baseline Inventory of Wetland, Ripariam and Littoral Habitat in the Turners Falls Impoundment and Assessment of Operational Impacts on Special-Status Species 09/14/2015 Wetlands Download
Updated Study Report Summary 3.4.1 Baseline Study of Terrestrial Wildlilfe and Botanical Resources 09/14/2015 Terrestrial Download
Updated Study Report Summary 3.3.8 Computation Fluid Dynamics Modeling in the Vicinity of the Fishway Entrances and Powerhouse Forebays 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.6 Impact of Project Operations on Shad Spawning, Spawning Habitat and Egg Deposition in the area of Northfield Mountain and Turner Falls Projects 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.5 Evaluate Downstream Passage of American Eel 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.16 Habitat Assessment, Surveys, and Modeling of Suitable Habitat for State-Listed Mussel Species in the Connecticut River Below Cabot Station 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.3 Evaluate Downstream Passage of Juvenile American Shad 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.12 Evaluate Frequency and Impact of Emergency Water Control Gate Discharge Events and Bypass Flume Events on Shortnose Sturgeon Spawning and Rearing Habitat in the Tailrace and Downstream From Cabot Station 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.13 Impacts of the Turner Falls Project and Northfield Mountain Project on Littoral Zone Fish Habitat and Spawning Habitat 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.15 Assessment of Adult Sea Lamprey Spawning with the Turner Falls Project and Northfield Mountain Project Area 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.2.1 Water Quality Monitoring Study 09/14/2015 Water Resources Download
Updated Study Report Summary 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station 09/14/2015 Water Resources Download
Udated Study Report Summary 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Project Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.4 Evaluate Upstream Passage of American Eel at the Turner Falls Project 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.10 Assess Operational Impacts on Emergence of State-Listed Odonates in the Connecticut River 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.1.2 Operation Impacts on Existing Erosion and Potential Bank Instability 09/14/2015 Recreation and Land Use Download
Updated Study Report Summary 3.3.20 Ichthyoplankton Entrainment Assessment at the Northfield Mountain Project 09/14/2015 Fish and Aquatics Download
Relicensing Study 3.1.3 Sediment Management Plan 09/14/2015 Geology and Soils Download
Revised Appendix C for Completed Study Report for Study No. 3.7.2 (Transmittal Letter) 07/22/2015 Cultural Download
Revised Appendix C for Completed Study Report for Study No. 3.7.2 (NH Area Form) 07/22/2015 Cultural Download
FristLight Notification of Updated Study Report Meetings September 29 and 30, 2015 07/21/2015 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Relicensing Study 3.4.2 Effects of Northfield Mountain Pumped Storage Development Related to Land Management Practices and Recreation Use on Terrestral Habitats 06/30/2015 Terrestrial Download
Relicensing Study 3.3.14 Aquatic Habitat Mapping of Turner Falls Impoundment 06/30/2015 Fish and Aquatics Download
Relicensing Study 3.6.7 Recreation Study at Northfield Mountain, including Assessment of Sufficient of Trails for Shared Use 06/30/2015 Recreation and Land Use Download
FirstLight CoverLetter Posting of Second Quarter 2015 Study Reports, Turners Falls Hydroelectric Project (FERC No. 1889) and Northfield Mountain Pumped Storage Project (FERC No. 2485) 06/30/2015 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Relicensing Study 3.3.17 Assess the Impacts of Turner Falls Project and Northfield Project Operations on Tributary and Backwater Area Access and Habitat 06/30/2015 Fish and Aquatics Download
Study 3.6.2 Recreation Facilities Inventory and Assessment Addendum 06/15/2015 Recreation and Land Use Download
Study 3.6.2 Recreation Facilities Inventory and Assessment Addendum Cover Letter 06/15/2015 Recreation and Land Use Download
Interim Relicensing Study 3.3.10 Assess Operational Impacts on Emergence of State-Listed Odonated in the Connecticut River 04/02/2015 Fish and Aquatics Download
Relicensing Study 3.2.2 Hydraulic Study of Turner Falls Impoundment, Bypass Reach and Below Cabot 03/31/2015 Water Resources Download
Relicensing Study 3.6.4 Assessment of Day Use and Overnight Facilities associated with Non-Motorized Boats 03/31/2015 Recreation and Land Use Download
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Form Flow 3500) 03/31/2015 Recreation and Land Use Download
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Form Flow 2500) 03/31/2015 Recreation and Land Use Download
Relicensing Study 3.3.4 Evaluate Upstream Passage of American Eel at the Turner Falls Project 03/31/2015 Fish and Aquatics Download
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Form Flow 8000) 03/31/2015 Recreation and Land Use Download
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Form Flow 13000) 03/31/2015 Recreation and Land Use Download
FirstLight CoverLetter Posting of First Quarter 2015 Study Reports, Turners Falls Hydroelectric Project (FERC No. 1889) and Northfield Mountain Pumped Storage Project (FERC No. 2485) 03/31/2015 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Form Flow 5000) 03/31/2015 Recreation and Land Use Download
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Comparative Flow Evaluation Form) 03/31/2015 Recreation and Land Use Download
Relicensing Study 3.7.3 Traditional Cultural Properties Study Report 03/31/2015 Cultural Download
FirstLight Response to EPA Comments on Northfield Mountain Pumped Storage Project Sediment Management Plan – 2014 Summary of Annual Monitoring 03/31/2015 Geology and Soils Download
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Form Flow 10000) 03/31/2015 Recreation and Land Use Download
Relicensing Study 3.3.18 Impacts of the Turner Falls Canal Drawdown on Fish Migration and Aquatic Organisms 03/31/2015 Fish and Aquatics Download
Relicensing Study 3.6.3 Whitewater Boating Evaluation 03/31/2015 Recreation and Land Use Download
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 1 02/24/2015 Geology and Soils Download
2013 Full River Reconnaissance – 2015 Addendum Attachment B-2007 to 2014 Photo Comparison 02/24/2015 Geology and Soils Download
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 3 02/24/2015 Geology and Soils Download
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 6 02/24/2015 Geology and Soils Download
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 5 02/24/2015 Geology and Soils Download
2013 Full River Reconnaissance – 2015 Addendum Cover Letter 02/24/2015 Geology and Soils Download
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 4 02/24/2015 Geology and Soils Download
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 2 02/24/2015 Geology and Soils Download
FirstLight Study No. 3.3.16 Interim Report - Habitat Assessment, Surveys, and Modeling for State-Listed Mussel Speices in the Connecticut River below Cabot Station 01/29/2015 Fish and Aquatics Download
FirstLight Study Report No. 3.7.2 Historic Architechtural Resources Survey & National Register Evaluation (Re-Submission) 01/20/2015 Cultural Download
Filing of November 17, 2014 Meeting Minutes re: Consultation on Studies employing Hydroacoustic and Telemetry Methods 12/22/2014 Fish and Aquatics Download
FirstLight Response to Stakeholder Comments on the Initial Study Report and Meeting Summary 12/15/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Proposed Modification to Study Plan 3.3.2 Evaluate Upstream and Downstream Passage of Adult American Shad 12/08/2014 Fish and Aquatics Download
Sediment Management Plan – Report of 2014 Activities for Northfield Mountain Pumped Storage Project (FERC No. 2485) 12/01/2014 Geology and Soils Download
Proposed Study Plan for the Acoustic Evaluation of Juvenile American Shad and Adult American Eel Passage and Entrainment 11/04/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Letter Response to Connecticut River Streambank Erosion Committee Full River Reconnaissance Data Request received October 22, 2014 10/29/2014 Geology and Soils Download
Revised Study Plan 3.3.20 Entrainment of American shad ichthyoplankton at the Northfield Mountain Pumped Storage Project 10/16/2014 Fish and Aquatics Download
2014 Initial Study Meeting Summary 10/15/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
2014 Initial Study Report Meeting-Call in Number 09/25/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
2014 Initial Study Report Meeting Presentation 09/25/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
2014 Initial Study Report. Study 3.1.1 09/15/2014 Geology and Soils Download
2014 Initial Study Report. Transmittal Letter 09/15/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
2014 Initial Study Report. Summary Study 3.6.5. 09/15/2014 Recreation and Land Use Download
2014 Initial Study Report. Summary Study 3.8.1. 09/15/2014 Operations Download
2014 Initial Study Report. Summary Study 3.7.2. 09/15/2014 Cultural Download
2014 Initial Study Report. Summary Study 3.6.6. 09/15/2014 Recreation and Land Use Download
2014 Initial Study Report. Summary Study 3.6.7. 09/15/2014 Recreation and Land Use Download
2014 Initial Study Report. Summary Study 3.3.7. 09/15/2014 Fish and Aquatics Download
2014 Initial Study Report. Summary Study 3.4.1. 09/15/2014 Terrestrial Download
2014 Initial Study Report. Summary Study 3.3.16. 09/15/2014 Fish and Aquatics Download
2014 Initial Study Report. Summary Study 3.3.8. 09/15/2014 Fish and Aquatics Download
2014 Initial Study Report. Summary Study 3.3.5. 09/15/2014 Fish and Aquatics Download
2014 Initial Study Report. Summary Study 3.3.4. 09/15/2014 Fish and Aquatics Download
2014 Initial Study Report. Summary Study 3.3.15. 09/15/2014 Fish and Aquatics Download
2014 Initial Study Report. Summary Study 3.3.2. 09/15/2014 Fish and Aquatics Download
2014 Initial Study Report. Summary Study 3.3.13. 09/15/2014 Fish and Aquatics Download
2014 Initial Study Report. Summary Study 3.3.19. 09/15/2014 Fish and Aquatics Download
2014 Initial Study Report. Summary Study 3.6.3. 09/15/2014 Recreation and Land Use Download
2014 Initial Study Report. Summary 3.4.2. 09/15/2014 Terrestrial Download
2014 Initial Study Report. Summary Study 3.5.1. 09/15/2014 Wetlands Download
2014 Initial Study Report. Summary Study 3.6.1. 09/15/2014 Recreation and Land Use Download
2014 Initial Study Report. Summary Study 3.7.1. 09/15/2014 Cultural Download
2014 Initial Study Report. Study Summary 3.7.3a. 09/15/2014 Cultural Download
2014 Initial Study Report. Summary 3.3.3. 09/15/2014 Fish and Aquatics Download
2014 Initial Study Report. Summary Study 3.3.18. 09/15/2014 Fish and Aquatics Download
2014 Initial Study Report. Summary Study 3.3.14. 09/15/2014 Fish and Aquatics Download
2014 Initial Study Report. Summary Study 3.3.12. 09/15/2014 Fish and Aquatics Download
2014 Initial Study Report. Summary Study 3.2.1. 09/15/2014 Water Resources Download
2014 Initial Study Report. Summary Study 3.1.3. 09/15/2014 Geology and Soils Download
2014 Initial Study Report. Summary study 3.3.10 09/15/2014 Fish and Aquatics Download
2014 Initial Study Report. Summary Study 3.3.11. 09/15/2014 Fish and Aquatics Download
2014 Initial Study Report. Summary Study 3.3.6. 09/15/2014 Fish and Aquatics Download
2014 Initial Study Report. Summary Study 3.3.9. 09/15/2014 Fish and Aquatics Download
2014 Initial Study Report. Summary Study 3.6.4. 09/15/2014 Recreation and Land Use Download
2014 Initial Study Report. Summary Study 3.3.17. 09/15/2014 Fish and Aquatics Download
2014 Initial Study Report. Summary Study 3.6.2. 09/15/2014 Recreation and Land Use Download
2014 Initial Study Report. Summary Study 3.3.1. 09/15/2014 Fish and Aquatics Download
2014 Initial Study Report. Summary Study 3.2.2. 09/15/2014 Water Resources Download
2014 Initial Study Report. Summary Study 3.1.2 09/15/2014 Geology and Soils Download
Study Plan for Entrainment of American Shad Ichthyoplankton at the Northfield Mountain Pumped Storage Project. Study # 3.3.20. DRAFT FOR CONSULTATION. 09/05/2014 Fish and Aquatics Download
FERC Resolution of Dispute on Entrainment Study, and Clarification on Study 3.1.2 09/03/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Letter from FirstLight regarding Study No. 3.3.6 Impact of Project Operations on Shad Spawning, Spawning Habitat and Egg Deposition in the Area of the Northfield Mountain and Turners Falls Project. 08/25/2014 Fish and Aquatics Download
FirstLight Hydro Generating Company files Notification of Dates and Agenda for 2014 Initial Study Report Meeting 08/21/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Letter from FirstLight Re: Study No. 3.3.18- Impact of Turners Falls Canal Drawdown on Fish Migration and Aquatic Organisms 08/15/2014 Fish and Aquatics Download
Letter from FirstLight pertaining to the causation study (Study No. 3.1.2) 08/12/2014 Geology and Soils Download
FirstLight Hydro Generating Company files 2014 Study Progress Report 07/23/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Staff Memo: Telephone conference 5/6/2014 between Commission Staff, Massachusetts Division of Fisheries and Wildlife, and FirstLight Hydro Generating Company 05/07/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Supplemental Information submitted by Massachusetts Division of Fisheries and Wildlife under P-1889. et. al. , regarding documented presence of yellow lampmussel, eastern pondmussel, and tidewater mucket in Reach 5 of Project Area. 05/05/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
USDOI/Fish and Wildlife Service/NEFO Submits ILP Proposed Study Plan or Revised Study under P-2485. 05/02/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Letter Supplemental/Additional Information to FERC re USFWS Proposed Revised Study Plan 05/02/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Letter requesting the Dispute Resolution Panel to provide recommendation by 5/2/14 re the Suspension of Dispute Resolution Panel 05/02/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Supplemental Information from USDOI/Fish and Wildlife Service/NEFO re: Submitted ILP Proposed Study Plan or Revised Study under P-2485. 05/02/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
U.S. Department of the Interior Response on the study dispute resolution process initiated by the U.S. Fish and Wildlife Service on March 13, 2014 05/01/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Study dispute resolution panel re Northfield Mountain Pumped Storage Project under P-2485. 04/30/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Letter order approving FirstLight Approval Letter for Modified Study 3.6.3 – Whitewater Boating 04/25/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Supplemental Information/Request of U.S. Fish and Wildlife Service/NEFO under P-2485. FWS Response to Panel Questions Study from April 8, 2014 Dispute Panel Questions for NMPS Project Study Dispute Technical Conference 04/24/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Supplemental Information of FirstLight Hydro Generating Company under P-2485, et. al to Narragansett Indian Tribe (NIT) re: Traditional Cultural Properties Study 04/24/2014 Cultural Download
FERC Staff Memo: Teleconference 4/22/2014 between Commission staff, the U.S. Fish and Wildlife Service (FWS) and FirstLight Hydro Generating Company (FirstLight) on the FWS’s formal dispute filed on March 13, 2014. 04/24/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Comments and Information Regarding Notice of Study Dispute (4/16/2014) 04/16/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Meeting Memo. FWS Formal Dispute Resolution. Meeting between Commission staff, the U.S. Fish and Wildlife Service (FWS) and FirstLight Hydro Generating Company (FirstLight) on the FWS’s formal dispute filed on March 13, 2014 04/16/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Hydro Generating Company provides maps depicting the final APE for Notifications of the impending archaeological investigations (P-1889 and P-2485). 04/15/2014 Cultural Download
The Nolumbeka Project Inc. submits comments re the Phase 1A Archaeological Survey for relicensing of the Turners Falls & Northfield Mountain Pumped Storage Hydroelectric Projects 04/15/2014 Cultural Download
FirstLight Hydro Generating Company submits Dye Test Information as requested as part of U.S. Fish and Wildlife Service Notice of Study Dispute under P-2485, et al. 04/15/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Hydro Generating Company submits Drawings and Photographs requested as part of U.S. Fish and Wildlife Service Notice of Study Dispute (CEII) under P-2485, et al. 04/15/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Memo. Supplemental Information of FERC Staff / Teleconference between Commission staff, the U.S. Fish and Wildlife Service (FWS) and FirstLight on the FWS's formal dispute filed on March 13, 2014 04/07/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Comments and Information Regarding Notice of Study Dispute (4/7/2014) 04/07/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight files Information Relevant to U.S. Fish and Wildlife Service Notice of Study Dispute 04/03/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments of Kevin Malone re: Dispute Resolution for the Turners Falls Hydroelectric Project (P-1889) and Northfield Mountain Pumped Storage Project(P-2485) 04/01/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Hydro Generating Company Notifications of the impending archaeological investigations (P-1889 and P-2485). 03/31/2014 Cultural Download
FERC Notice of dispute resolution panel meeting and technical conference (4/8/2014) re FirstLight Hydro Generating Company under P-2485. 03/31/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments of Stakeholder Karl Meyer on FirstLight Repsonse/Filing Supplemental Information Relevant to U.S. Fish and Wildlife Service Notice of Study Dispute 03/31/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Files Supplemental Information Relevant to U.S. Fish and Wildlife Service Notice of Study Dispute 03/28/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Response to FERC Request for Northfield Mountain Pumped Storage Project, 1992 American Shad Study 03/18/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight files Turners Falls Project - Fish Passage Facilities 2013 Annual Report of Operations 03/15/2014 Fish and Aquatics Download
MADFW Additional Comment/Supplemental Information re: Documented Presence of State-listed Mussel Species in the Project Area 03/13/2014 Fish and Aquatics Download
U.S. Fish and Wildlife Service/NEFO ILP Notice for Dispute Resolution of project study requests. 03/13/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Staff Memo to Public Files: Tribal consultation telephone conference with the Narragansett Indian Tribe of Rhode Island 03/12/2014 Cultural Download
FERC Staff Memo to Public Files - Email communication between Commission staff and FirstLight Re: Clarification on Study No. 3.3.7- Fish Entrainmental and Turbine Mortality Study 03/07/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Staff Memo to Public Files -Telephone communications between Commission staff and the Massachusetts Division of Fisheries & Wildlife re: FERC's Study Plan Determination of the mussel studies (3.3.1, 3.3.11 and 3.3.16) 03/07/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Letter to FirstLight re: Clarification of the Study Plan Determination for Aquatic Studies 03/07/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Staff Memo to Public Files - Email communication between Commission staff and the U.S. Fish and Wildlife Service re: clarification of the February 21, 2014 study plan determination 03/07/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Letter order approving FirstLight Hydro Generating Company's 9/13/13 filing of the Study 3.5.1 - Baseline Inventory of Wetland, Riparian & Littoral Habitat in Turners Falls Impoundment 03/06/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Letter to FirstLight Hydro Generating Company providing the Study Plan Determination for Aquatic Studies - Turners Falls Hydroelectric Project and the Northfield Mountain Pumped Storage Project 02/21/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FWS/NEFO Supplemental Comments on Revised Study Plan: Request for Additional Consultation on Studies 3.3.6 and 3.3.11 02/12/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Letter Additional Information on Study Plan 3.6.3, Whitewater Boating Evaluation 02/10/2014 Recreation and Land Use Download
FERC Memo: FERC Staff Memo to Public Records documenting telephone conversation between Commission staff and Dr. Theodore Castro-Santos of the U.S. Geological Survey’s S.O. Conte Anadromous Fish Research Center 02/03/2014 Fish and Aquatics Download
FERC Memo: Supplemental Information/Request of FERC Staff under P-1889, et. al..Communications between Commission staff and Bob Nasdor of the American Whitewater 01/31/2014 Recreation and Land Use Download
FERC Memo: Supplemental Information/Request of FERC Staff under P-1889, et. al..Communications between Commission staff, and Mr. Mark Wamser and Mr. John Howard of FirstLight 01/31/2014 Recreation and Land Use Download
FirstLight's letter to Narragansett Indian Tribal Historic Preservation Office regarding initiation of the Traditional Cultural Properties Study Plan (FERC Project No. 2485 and 1889) 01/31/2014 Cultural Download
FERC Memo: Communications between FERC staff and the U.S. Geological Survey’s Conte Anadromous Fish Research Center (Conte Lab) 01/29/2014 Fish and Aquatics Download
FirstLight Response to National Marine Fisheries Service Supplemental Comments on Study Plan 01/28/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Letter Acknowledging Receipt of Sediment Management Plan - 2013 Summary of Annual Monitoring 01/23/2014 Geology and Soils Download
FERC Letter reminding FirstLight Power Resources, LLC of their license obligation to gather recreation use data for a 12-month beginning no later than March 15, 2014, re Revised Form 80 for the Turners Falls 01/22/2014 Recreation and Land Use Download
Additional Comments of American Whitewater's on Modified Revised Study Plan Study No. 3.6.3 (Whitewater Boating Evaluation) 01/22/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Submittal of Modified Revised Study Plans, Study No.3.5.1(Baseline Inventory of Wetland, Riparian, and Littoral Habitat, and Assessment of Operational Impacts on Special-Status Species) and Study No.3.6.3 (Whitewater Boating Evaluation) 01/13/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Report Regarding Conveyance of Easements, Rights-of-Way, or Leases in 2013 01/10/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Letter Approval for Modified Study Plan No. 3.6.7 Recreation Study at Northfield Mountain, including Assessment of Sufficiency of Trails for Shared Use 01/10/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
VT SHPO concurrence with FERC's APE determination Turners Falls and Northfield Mountain Projects 01/09/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments of Boyd Kynard, PhD on FERC Study Plan Determination, Study 4.2.3 Hydraulic Study of Turner Falls 01/07/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments of Massachusetts Division of Fisheries and Wildlife on Draft Modified Revised Study Plan, Study No. 3.5.1 01/06/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments of Dorothy McIver on Northfield and Turner Falls Projects Relicensing power canal hydraulic study 01/02/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comment of Garrett D. Connelly regarding socioeconomic and environmental positive goods not yet analyzed under P-1889. 01/02/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comment of citizen Hazel Dawkins on Northfield Project Relicensing 01/01/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comment of citizen Margo P. Jones on Turner Falls Project Relicensing 12/30/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Massachusetts Historical Commission (MHC) submits letter to FERC: concurs with FERC's determination of the project APE 12/19/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Letter to FirstLight Hydro Generating Company re the Interim ILP schedule for Study Plan Determination for the Turners Falls Project 12/13/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Submittal of Modified Revised Study Plan, Study No. 3.6.7 (Recreation Study at Northfield Mountain, including Assessment of Sufficiency of Trails for Shared Use) 12/11/2013 Recreation and Land Use Download
MA Division of Fisheries and Wildlife Comments on Technical Meeting (11/25/13) re:Effects of Decommissioning the Vermont Yankee Power Plant on Revised Proposed Study Plan 12/06/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight submits to FERC 2013 Construction Progress Report MA Erosion Control Plan for Northfield Mountain Project, Riverbank Restoration Bathory-Gallagher and Wallace-Watson Sites. 12/06/2013 Geology and Soils Download
Sediment Management Plan - 2013 Summary of Annual Monitoring 12/02/2013 Geology and Soils Download
FERC Letter to FirstLight requesting their concurrence on the area of potential effects for the Turner Falls and Northfield Mountain Projects 11/27/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Transcript of the 11/25/13 Scoping Meeting held in Northfield, MA 11/27/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Department of Commerce, NOAA Supplemental Comments on FirstLight's Proposed Study Plan dated June 28, 2013 for Turner Falls and Northfield Mountain Pumped Storage 11/22/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Letter order approving FirstLight Hydro Generating Company's 10/25/13 request for an extension of time until 1/13/14 to file modified study plans 11/08/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Letter to FirstLight regarding the Request for Clarification of September 13, 2012 Study Plan Determination 10/25/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Request for Extension of Time to File Modified Study Plans 10/25/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Notification of November 25, 2013 Technical Meeting 10/25/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Letter Postponement of October 16, 2013 Technical Meeting 10/08/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Request for Clarification on an aspect of one of the 20 studies entitled: Study No. 3.2.2- Hydraulic Study of Turners Falls Impoundment, Bypassed Reach, and the Connecticut River below Cabot Station 10/07/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Appalachian Mountain Club, Vermont River Conservancy, and the Friends of the Connecticut River Paddlers' Trail's Comments on the Revised Study Plans 10/03/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Letter to Peter Champoux discussing the canal water seeping incident 10/03/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Order Approving FirstLight 2013 Full River Reconnaissance (FRR) Report Schedule for the Northfield Mountain 10/02/2013 Geology and Soils Download
FERC Letter Response to US Representative James P McGovern's 8/30/13 letter re FirstLight Hydro Generating Co's revised study plans for the relicensing of the Northfield Mountain Pumped Storage 09/25/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Notification of October 16, 2013 Technical Meeting 09/18/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Study Plan Determination for the Turner Falls Hydroelectric Project and The Northfield Mountain Punmped Storage Project 09/13/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
U.S. Fish and Wildlife Service/NEFO Supplemental Comments on Revised Study Plan 09/13/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
US House of Representatives Comments on the Revised Study Plan for Turner Falls and Northfield Mountain Pumped 08/30/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Letter to FERC re: Impact on Relicensing Studies and Schedule due to Reported Closing of the Vermont Yankee Nuclear Project, Vernon, VT, Connecticut River 08/30/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
New Hampshire Department of Environmental Services (NHDES) Comments on Revised Study Plan for FERC NO. 1889 (Turners Falls) and 2485 (Northfield Mountain) 08/29/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments of the Landowners and Concerned Citizens for License Compliance on FirstLight Power's Revised Study Plan 08/29/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Massachusetts Division of Fisheries and Wildlife Comments on Northfield Mountain and Turners Falls Revised Proposed Study Plan 08/29/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
U.S. Fish and Wildlife Service/NEFO Comments on Revised Study Plan 08/29/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
The Nature Conservancy Connecticut River Program Comments on Revised Study Plan 08/29/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Donald Pugh Comments regarding FirstLight Revised Study Plans dated August 14, 2013 08/29/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
New Hampshire Fish and Game Department Comments on Impacts of Closure of Vermont Yankee Nuclear Power Plant on Results of Proposed Study Plans 08/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Massachusetts Division of Fisheries and Wildlife (MADFW) Impacts of Closure of Vermont Yankee Nuclear Power Plant on Results of Proposed Study Plans 08/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Massachusetts Department of Environmental Protection Comments on Revised Study Plans 08/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Karl Meyer Comments on FirstLight Hydro Generating Company's Revised Study Plan (RSP) 08/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Massachusetts Department of Conservation and Recreation Comments on Revised Study Plans 08/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
National Oceanic and Atmospheric Administration (NOAA) Fisheries comments on Revised Study Plans 08/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Franklin Regional Council of Governments Comment the Revised Study Plan (RSP) submitted by FirstLight August 14, 2013 08/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Supplement Information from L. McLoughlin and Warren Ondras Additonal Noise Spectral Plots 08/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
American Whitewater Comment's on FirstLight Power's Revised Study Plan for the Turners Falls Hydroelectric 08/27/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Massachusetts Historical Commission Comments on the Revised Proposed Study Plan 08/26/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comment of Thomas J Christopher (New England Flow) Comments on Revised Study Plans 08/26/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Letter to FERC re: Northfield Mountain Station submits the Erosion Control Plan Status and Update of Activities 08/26/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments of National Park Service on RSP, Appl. For License / Relicense of FirstLight, Northeast Region 08/23/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Revised Study Plan. Appendix F – Turners Falls Upstream Fish Passage CFD Modeling of Gatehouse Entrance 08/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Revised Study Plan. Appendix E – Previous data and information for Adult American shad 08/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Revised Study Plan. Appendix C – NRCS Chemical and Physical Soil Properties 08/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Revised Study Plan. Appendix D – 2013 Full River Reconnaissance Study and Quality Assurance Project Plan 08/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Revised Study Plan. Appendix H – Stakeholder Comments on Updated PSP 08/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Revised Study Plan 08/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Revised Study Plan. Appendix A – Study Request Letters 08/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight's Letter to Narragansett Indian Tribal Historic Preservation Office, RE:Revised Study Plan, Traditional Cultural Properties Study Plan for Northfield Mountain Pumped Storage et al under P-2485 et al. 08/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Revised Study Plan. Appendix G – 2011 Cabot Station Drawdown Juvenile American Shad Stranding Survey 08/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Revised Study Plan. Appendix B – Resource Comments/Concerns and Response 08/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Supplemental Information of FERC Staff under P-1892, et. al. Memo of Teleconference between Commission staff and representatives of TransCanada 08/07/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight's request for approval Report on Uses and Occupancies of Project Lands (2013 Mitigation Implementation Report) 08/05/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Supplemental Information/Request of FERC Staff Memo of Teleconference between Commission staff and Representatives of FirstLight Power Resources regarding PSP 3.1.2 07/23/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Massachusetts Historical Commission submits Comments on Updated Proposed Study Plan 3.7.1 07/16/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Vermont Department of Environmental Conservation Comments on Updated Proposed Study Plans for Turners Falls and Northfield Mountain 07/15/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
VT Office of Historic Preservation Comments on Updated Proposed Study Plan 07/15/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments from the Landowners and Concerned Citizens for License Compliance on the Updated Study Plan filed by FirstLight on June 28, 2013 07/15/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Connecticut River Watershed Council, Inc. (CRWC) Comments on the June 28, 2013 updated Proposed Study Plan 07/15/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Franklin Regional Council of Governments Comments on the Updated Proposed Study Plan (PSP) submitted by FirstLight June 28, 2013 07/15/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
US Fish and Wildlife Service Comments on 6-28-13 Updated Proposed Study Plan 07/15/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Town of Northfield Office of the Town Adminstrator Comments on Updated Proposed Study Plans 3.1.1 and 3.1.2 07/15/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comment of Katherine Putnam "Using the river for the lower reservoir is old technology and an old idea." 07/15/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
National Marine Fisheries Service Comments on Updated Proposed Study Plans 07/15/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Franklin Conservation District Comments on Proposed Study Plan for Turners Falls and Northfield Mountain 07/15/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
The Nature Conservancy Connecticut River Program Comments on Proposed Study Plans for P-1889 and P-2485 07/15/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
New Hampshire Department of Environmental Services (NHDES) Comments on Updated Proposed Study Plan 07/15/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Town of Gill Comments on the Updated Proposed Study Plan 07/15/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Trout Unlimited's comments on FirstLight Proposed Study Plan 07/15/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Karl Meyer Comments on FirstLight Hydro Generating Company's Updated Proposed Study Plan (PSP) 07/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Nolumbeka Project, Inc. Traditional Cultural Properties Study Request 07/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments to FERC from Steve Alves regarding FirstLight use of Connecticut River for Northfield Mountain Pumping Station 07/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
National Park Service, Northeast Region comments on Proposed Study Plans Revision 07/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
American Whitewater Comments on Updated Proposed Study Plan 07/12/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Massachusetts Department of Environmental Protection comments to Proposed Study Plans under P-1889 07/12/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Massachusetts Division of Fisheries and Wildlife Comments on Updated Proposed Study Plan 07/12/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC memo: Teleconference between Commission staff and the MA Division of Fisheries 07/11/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
EPA Comments of EPA New England under P-2485, comments on PSP Section 3.1 Geology and Soils 07/11/2013 Geology and Soils Download
New Hampshire Department of Fish and Game comments to Draft Proposed Study Plans 07/11/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
NEW ENGLAND FLOW Comments on Updated Proposed Study Plans 07/09/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Appeal to rejection of request for noise study of Warren Ondras under P-2485. 07/08/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments from Peter Richardson on Northfield Mountain project 07/08/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments from Philip Tomlinson on Northfield Mountain project 07/08/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comment from Jane Whittlesey on Northfield Mountain project 07/05/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments from Elizabeth Austin on Relicensing of the Northfield Pumped Storage Facility 07/05/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Updated Proposed Study Plan (PSP) for the relicensing of the Turners Falls Project and Northfield Mountain Project 06/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Letter Order denying U.S. Fish and Wildlife Service's request for a 15 days extension of time request on the licensees' proposed study plan re the TransCanada Hydro Northeast Inc et al under P-1892 et al 06/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Information Concerning Request for Noise Study 06/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Schedule for Filing 2013 Full River Reconnaissance Report 06/27/2013 Geology and Soils Download
Letter to Peter Champoux from FERC responding to the 3/1/13 letter and the 6/19/13 email discussing the parcel of land that abuts the power canal wall of the Turners Falls Project under P-1889 06/25/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
The Commonwealth of Massachusetts submits comments on the Project Notification Form (PMF) for Turners Falls and Northfield Mountain 06/21/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments of Fire Chief Robert Escott on effects of low water levels of Turner Falls Project 06/21/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Franklin Regional Council of Governments (FRCOG) letter in Support of the Extension of Time Request to Comment Support for Extension of Time Request to Comment on Proposed Study Plans for five Hydroelectric Projects on the Connecticut River 06/19/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Response to US Fish and Wildlife Service Extension of Time Request 06/19/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comment of The Nature Conservancy, Connecticut River Program under P-1892, et. al..Support for the US Fish and Wildlife Service Extension of Time Request to Comment on Proposed Study Plans 06/18/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Letter of Support for USFWS EOT by the New Hampshire Department of Environmental Services and request for extension of time to Comment on Draft Proposed Study Plans 06/18/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Massachusetts Division of Fisheries and Wildlife Comments in regard to Extension of time request by the US Fish and Wildlife Service to Comment on Proposed Study Plans 06/17/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
NOAA Fisheries comments in support for US Fish and Wildlife Service Extension of Time request on P-1889 Turners Falls and P-2485 Northfield Mtn Pump Storage 06/17/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments of Connecticut River Watershed Council, Inc. under P-2485. "Support for the Extension of time request by the US Fish and Wildlife Service to Comment on Proposed Study Plans" 06/17/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Donald Pugh comments re Trout Unlimited's EOT request to Comment on Draft Proposed Study Plans 06/17/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
USDOI/Fish and Wildlife Service/NEFO Extension of Time Request to Comment on Proposed Study Plans 06/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
U.S. Fish & Wildlife Service - Extension of Time Request to Comment of Proposed Study Plans 06/13/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
June 11-12, 2013 Working Group 3: Recreation and Land Use Resources, Aesthetic Resources , Cultural Resources Meeting Presentation 06/10/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
June 5, 2013 Working Group 2: Aquatic Resources, Terrestial, Wetlands, Riparian Resources Meeting Presentation 06/05/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
June 4, 2013 Working Group 2: Aquatic Resources, Terrestial, Wetlands, Riparian Resources Meeting Presentation 06/04/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
May 22, 2013 Working Group 2: Aquatic Resources, Terrestial, Wetlands, Riparian Resources Meeting Presentation 05/22/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
May 21, 2013 Working Group 2: Aquatic Resources, Terrestial, Wetlands, Riparian Resources Meeting Presentation 05/21/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
May 14, 2013 Broad Overview of All Proposed Studies Meeting Presentation 05/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
May 14 (afternoon) and May 15, 2013 Working Group 1 (Geology and Soils, Water Resources, Developmental Resources) Meeting Presentation 05/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Order approving report on existing uses and occupancies of project lands and waters re FirstLight Hydro Generating Company 05/13/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Public Files Memo: Initial Tribal consultation meeting with the Narragansett Indian Tribe of Rhode Island 05/03/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Massachusetts Historical Commission submits comments re the proposed study plan for the relicensing of the Turners Falls and Northfield Mountain Pumped Storage Hydroelectric 04/24/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
April 16, 2013 Turners Fall Instream Flow Study Meeting: Study Process Overview Presentation 04/16/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Scoping Document 2 for the Wilder (FERC No. 1892-026), Bellows Falls (FERC No. 1855-045), Vernon (FERC No. 1904-073), and Turners Falls (FERC No. 1889-081) hydroelectric projects, and the Northfield Mountain Pumped Storage Project (FERC No. 2485-063) 04/15/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Proposed Study Plan (PSP) for the relicensing of the Turners Falls Project and Northfield Mountain Project (Volume 2 Appendix A) 04/15/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Proposed Study Plan (PSP) for the relicensing of the Turners Falls Project and Northfield Mountain Project (Volume 1 without Appendices) 04/15/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Proposed Study Plan (PSP) for the relicensing of the Turners Falls Project and Northfield Mountain Project (Volume 2 Appendices B-G) 04/15/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Schedule for Meetings after formal meeting to discuss Proposed Study Plan 04/05/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Study Requests of Deerfield River Trout Unlimited 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments of Joanne McGee regarding Canoe/Kayaks access on Connecticut River 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments and Study Requests of Kurt Heidinger for Biocitizen School of Environmental Philosophy and Practice 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
The Nature Conservancy Comments on Scoping Document 1 and Study Requests for the Wilder, Bellows Falls (FERC No. 1855-045), Vernon (FERC No. 1904-073), and Turners Falls (FERC No. 1889-081) hydroelectric projects, and the Northfield Mountain Pumped Storag 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comment of Howard Fairman re environmental impacts on migratory fish in relicensing of Northfield Mountain Pumped Storage. 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments on Connecticut River Massachusetts water withdrawal by Massachusetts Farm Bureau Federation ( A. Richard Bonanno, Ph.D.) 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
ILP Comments or Study Request of U.S. Fish and Wildlife Service/New England Field Office 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Connecticut River Joint Commissions Comments on Integrated Licensing Process and Study Request for FERC project numbers P-1904 (Vernon), P-1855 (Bellows Falls), P-1892 (Wilder), 1889 (Turners Falls), No. 2485 (Northfield Mountain). 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments on the PAD, Scoping Document 1, and Study Requests of Connecticut River Watershed Council, Inc. 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Stefanie Krug Study Plan Request for the Northfield Mountain Trail Assessment under P-2485: Mountain Bike Trails Access 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
ILP Comments or Study Request of Massachusetts Department of Environmental Protection 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments and Study Request submitted by The Nolumbeka Project, Inc, et al 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Letter to FirstLight Hydro Generating Company providing Identified PAD Deficiencies, Additional Information Requests, and Study Requests 03/01/2013 Pre-Application Document Download
NMFS Study Requests and Comments regarding PAD 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments on Scoping Document 1 for the Wilder, Bellows Falls, Vernon and Turners Falls hydroelectric projects, and the Northfield Mountain Pumped Storage Project from Northeast Climate Science Center 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments on PAD, SD1 and Study Requests from Franklin Conservation District 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comment and Study Requests of New England FLOW, American Whitewater and Appalachian Mountain Club 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Supplemental Information of Vivien Venskowski of The River Residents Association. Connecticut River concerns on Extreme Water Level Fluctuations and Campsite License Terms 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comment of Stefanie Krug (2) 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comment of Stefanie Krug 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
New Hampshire Department of Environmental Services Comments on Pre-Application Documents and Study Requests for 5 Hydroelectric Projects on the Connecticut River 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
New England Farmers Union review of Pre-Application Documents 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Stefanie Krug Additional information and comments letter for study request (Accession No. 20130301-5029) 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
The Vermont Agency of Natural Resources (Agency) submits comments and requests for studies. 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments and Study Requests in Response to the Notice of Intent to File License Application, Filing of Pre-Application Document (PAD), Commencement of Pre-Filing Process and Scoping and Request for Comments on the PAD and Scoping Document 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Photos from Anonymous River Resident regarding the Turner Falls and Northfield Projects 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
SD1 Comments, PAD Comments, and Study Requests of the Massachusetts Division of Fisheries and Wildlife (MADFW) 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments on the Preliminary Application Document, Scoping Document 1, and Study Requests submitted by the Landowners and Concerned Citizens for License Compliance 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Supplemental/Additional Information Response to Data Request of Town of Montague, MA, Native American Cultural Landscape District Properties in Turners Falls Management Plan 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Appalachian Mountain Club, Vermont River Conservancy, and Friends 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments of Chris Curtis re the Turners Falls Project Article from The Recorder: "Lower water hampers use of Connecticut River, Jeopardizes potential river rescue response." 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments on the Preliminary Application Document, Scoping Document 1, and Study Requests submitted by Franklin Regional Council of Governments 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments on the Preliminary Application Document, Scoping Document 1, and Study Requests submitted by the Town of Gill, MA Select Board and Conservation Commission 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Transcript of 1/30/13 scoping meeting held in Turners Falls, Massachusetts for the Vernon, Northfield Mountain, and Turners Falls Hydroelectric Projects re TransCanada Hydro Northeast, Inc and FirstLight Hydro Generating Company 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Transcript of 1/31/13 scoping meeting held in Turners Falls, Massachusetts for the Connecticut River Projects' Cumulative Effects re TransCanada Hydro Northeast, Inc and FirstLight Hydro Generating Company 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Transcript of 1/31/13 scoping meeting held in Turners Falls, Massachusetts for the Northfield Mountain and Turners Falls Hydroelectric Projects re FirstLight Hydro Generating Company 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments from Cynthia S. Dale of River Residents Association Connecticut River concerns regarding the Turner Falls Project and Northfield Mountain Projects 02/25/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments from Robert Stafford and Family of River Residents Association, Connecticut River concerns regarding the Turner Falls and Northfield Projects 02/25/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Relicensing Comments by Karl Meyer, Greenfield, MA 02/25/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments from Leena Newcomb of the River Residents Association re the Turners Falls Project 02/25/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments from Michael and Diane Kane of River Residents Association, Connecticut River concerns regarding the Turner Falls and Northfield Projects 02/25/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Letter to FERC from Connecticut River Residents concerning Northfield Mountain and Turners Falls Dam licensing issues 02/25/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments from Robert and Linda Emond of River Residents Association, Connecticut River concerns regarding the Turner Falls and Northfield Projects 02/25/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments or Study Request of Ashuelot River Local Advisory Committee 02/24/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Draft Study plan - "Conduct Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station" 02/22/2013 Fish and Aquatics Download
FERC Filing: Comment of FirstLight Hydro Generating Company on Scoping Document 1 under P-1889, et. al. 02/22/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Northfield Conservation Commission, Town of Northfield, MA submits Comments re Northfield Mountain Pumped Storage Project 02/22/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments of Four Star Farms, Inc. re the Northfield Mountain Relicensing 02/20/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Filing: Supplemental Information of FERC Staff under P-1889, et. al.. Town of Montague files the National Register Eligibility Notification for the Turners Falls Ceremonial Site and concept paper for the Great Falls Native Cultural Park 02/20/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
The Western Massachusetts Climbers’ Coalition Scoping Comments for the Northfield Mountain Pumped Storage Project 02/20/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Filing: Supplemental Information of FERC Staff under P-1889, et. al.. Email communications between Kenneth Hogan of the Commission's Staff and Ms. Leena Newcomb representing The River Residents Association 02/20/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments from Stanley Johnson of River Residents Association regarding the Turner Falls and Northfield Projects 02/16/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments from Peter W. Conway of River Residents Association re regarding the Turner Falls Project and Northfield Mountain Projects 02/16/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Filing: REFILE of the Request of Massachusetts Division of Fisheries and Wildlife under P-1889, et al. 02/11/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Filing: Submitted on behalf of the Landowners and Concerned Citizens for License Compliance. Comments on the draft QAPP for the 2013 Full River Reconnaissance 02/04/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments of Thomas Shearer et al re the Northfield Mountain Pumped Storage Project 01/31/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments from Leena Newcomb of River Residents Association regarding the Turner Falls Project and Northfield Mountain Projects 01/31/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Scoping proposal for noise study, filed by Warren Ondras 01/31/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments from the Appalachian Mountain Club, headquartered in Boston, Mass., on riverwide issues in the proposed relicensing Connecticut River Facilities. 01/30/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments from the Appalachian Mountain Club (AMC Riverwide Issues) 01/30/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
1/30/2013 - 1/31/2013 - FERC Scoping Meetings Presentation 01/30/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Landowners & Concerned Citizens for License Compliance (LCCLC) Comments on proposed Relicensing of Turner Falls and Northfield Mountain 01/30/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
New England Flow and American Whitewater's Comments and Study Requests 01/30/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Instream Flow Study Scoping Meeting with Fish Agencies 01/24/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Massachusetts Historical Commission comments to assist in compliance with Section 106 of the National Historic Preservation Act oof 1966 as amended (36 CFR 800). 01/16/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
WD Cowls, Inc. submit comments in lieu of attending FERC Scoping Meeting 01/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Aquatic Mesohabitat Assessment and Mapping prepared by FirstLight (2012) 01/08/2013 Fish and Aquatics Download
Analysis of Erosion in Vicinity of Route 10 Bridge Spanning the Connecticut River prepared by Simons & Associates (2012). 01/08/2013 Geology and Soils Download
Freshwater Mussel Survey in the Connecticut River for the Turners Falls and Northfield Mountain Hydroelectric Projects prepared by Biodrawversity (2012) 01/08/2013 Fish and Aquatics Download
Riverbank Erosion Comparison along the Connecticut River prepared by Simons & Associates (2012) 01/08/2013 Geology and Soils Download
Scoping Document 1 for TransCanada Hydro Northeast Inc. (Wilder Project, Bellows Falls, Vernon Project) and FirstLight (Turner Falls, Northfield Mountain) 12/21/2012 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Modification to Integrated Licensing Process Schedule 12/21/2012 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Pre-Application Document (PAD) For The Turners Falls Hydroelectric Project (No. 1889) and the Northfield Mountain Pumped Storage Project (No. 2485) 10/30/2012 Pre-Application Document Download
Notification of Intent (NOI) of Firstlight Hydro Generation Company to File an Application for A New License For The Turners Falls Hydroelectric Project (No. 1889) and the Northfield Mountain Pumped Storage Project (No. 2485) 10/30/2012 Notice of Intent Download
Field, John. 2011. Detailed Analysis of the 2008 Full River Reconnaissance of the Turners Falls Pool on the Connecticut River: Unpublished report prepared for The Landowners and Concerned Citizens for License Compliance. 01/01/2011 Geology and Soils Download
Field Geology Services. (2007). Fluvial geomorphology study of the Turners Falls Pool on the Connecticut River between Turners Falls, MA and Vernon, VT. Prepared for Northfield Mountain Pumped Storage Project. Farmington, ME: Field Geology Services. 01/01/2007 Geology and Soils Download
US Army Corps of Engineers (USACE). 1991. General investigation study - Connecticut River streambank erosion. Waltham, MA: USACE, New England Division. 01/01/1991 Geology and Soils Download
Northrop, Devine and Tarbell, Inc.. 1991. Connecticut River Riverbank Management Master Plan (Draft). Northeast Utilities Service Company, Inc. 01/01/1991 Geology and Soils Download
Simons, D.B., Andrew, J.W., Li, R.M., & Alawady, M.A. (1979). Connecticut River Streambank Erosion Study: Massachusetts, New Hampshire, and Vermont. Waltham, MA: US Army Corps of Engineers (USACE). 01/01/1979 Geology and Soils Download