Licensing Documents

Filter

Document Title Date of Filing Contents Download
Simons, D.B., Andrew, J.W., Li, R.M., & Alawady, M.A. (1979). Connecticut River Streambank Erosion Study: Massachusetts, New Hampshire, and Vermont. Waltham, MA: US Army Corps of Engineers (USACE). 01/01/1979 Geology and Soils Download
US Army Corps of Engineers (USACE). 1991. General investigation study - Connecticut River streambank erosion. Waltham, MA: USACE, New England Division. 01/01/1991 Geology and Soils Download
Northrop, Devine and Tarbell, Inc.. 1991. Connecticut River Riverbank Management Master Plan (Draft). Northeast Utilities Service Company, Inc. 01/01/1991 Geology and Soils Download
Field Geology Services. (2007). Fluvial geomorphology study of the Turners Falls Pool on the Connecticut River between Turners Falls, MA and Vernon, VT. Prepared for Northfield Mountain Pumped Storage Project. Farmington, ME: Field Geology Services. 01/01/2007 Geology and Soils Download
Field, John. 2011. Detailed Analysis of the 2008 Full River Reconnaissance of the Turners Falls Pool on the Connecticut River: Unpublished report prepared for The Landowners and Concerned Citizens for License Compliance. 01/01/2011 Geology and Soils Download
Pre-Application Document (PAD) For The Turners Falls Hydroelectric Project (No. 1889) and the Northfield Mountain Pumped Storage Project (No. 2485) 10/30/2012 Pre-Application Document Download
Notification of Intent (NOI) of Firstlight Hydro Generation Company to File an Application for A New License For The Turners Falls Hydroelectric Project (No. 1889) and the Northfield Mountain Pumped Storage Project (No. 2485) 10/30/2012 Notice of Intent Download
Scoping Document 1 for TransCanada Hydro Northeast Inc. (Wilder Project, Bellows Falls, Vernon Project) and FirstLight (Turner Falls, Northfield Mountain) 12/21/2012 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Modification to Integrated Licensing Process Schedule 12/21/2012 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Analysis of Erosion in Vicinity of Route 10 Bridge Spanning the Connecticut River prepared by Simons & Associates (2012). 01/08/2013 Geology and Soils Download
Aquatic Mesohabitat Assessment and Mapping prepared by FirstLight (2012) 01/08/2013 Fish and Aquatics Download
Riverbank Erosion Comparison along the Connecticut River prepared by Simons & Associates (2012) 01/08/2013 Geology and Soils Download
Freshwater Mussel Survey in the Connecticut River for the Turners Falls and Northfield Mountain Hydroelectric Projects prepared by Biodrawversity (2012) 01/08/2013 Fish and Aquatics Download
WD Cowls, Inc. submit comments in lieu of attending FERC Scoping Meeting 01/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Massachusetts Historical Commission comments to assist in compliance with Section 106 of the National Historic Preservation Act oof 1966 as amended (36 CFR 800). 01/16/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Instream Flow Study Scoping Meeting with Fish Agencies 01/24/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
1/30/2013 - 1/31/2013 - FERC Scoping Meetings Presentation 01/30/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Landowners & Concerned Citizens for License Compliance (LCCLC) Comments on proposed Relicensing of Turner Falls and Northfield Mountain 01/30/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
New England Flow and American Whitewater's Comments and Study Requests 01/30/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments from the Appalachian Mountain Club (AMC Riverwide Issues) 01/30/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments from the Appalachian Mountain Club, headquartered in Boston, Mass., on riverwide issues in the proposed relicensing Connecticut River Facilities. 01/30/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Scoping proposal for noise study, filed by Warren Ondras 01/31/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments from Leena Newcomb of River Residents Association regarding the Turner Falls Project and Northfield Mountain Projects 01/31/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments of Thomas Shearer et al re the Northfield Mountain Pumped Storage Project 01/31/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Filing: Submitted on behalf of the Landowners and Concerned Citizens for License Compliance. Comments on the draft QAPP for the 2013 Full River Reconnaissance 02/04/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Filing: REFILE of the Request of Massachusetts Division of Fisheries and Wildlife under P-1889, et al. 02/11/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments from Peter W. Conway of River Residents Association re regarding the Turner Falls Project and Northfield Mountain Projects 02/16/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments from Stanley Johnson of River Residents Association regarding the Turner Falls and Northfield Projects 02/16/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments of Four Star Farms, Inc. re the Northfield Mountain Relicensing 02/20/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Filing: Supplemental Information of FERC Staff under P-1889, et. al.. Town of Montague files the National Register Eligibility Notification for the Turners Falls Ceremonial Site and concept paper for the Great Falls Native Cultural Park 02/20/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
The Western Massachusetts Climbers’ Coalition Scoping Comments for the Northfield Mountain Pumped Storage Project 02/20/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Filing: Supplemental Information of FERC Staff under P-1889, et. al.. Email communications between Kenneth Hogan of the Commission's Staff and Ms. Leena Newcomb representing The River Residents Association 02/20/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Filing: Comment of FirstLight Hydro Generating Company on Scoping Document 1 under P-1889, et. al. 02/22/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Northfield Conservation Commission, Town of Northfield, MA submits Comments re Northfield Mountain Pumped Storage Project 02/22/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Draft Study plan - "Conduct Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station" 02/22/2013 Fish and Aquatics Download
Comments or Study Request of Ashuelot River Local Advisory Committee 02/24/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments from Leena Newcomb of the River Residents Association re the Turners Falls Project 02/25/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments from Robert and Linda Emond of River Residents Association, Connecticut River concerns regarding the Turner Falls and Northfield Projects 02/25/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Relicensing Comments by Karl Meyer, Greenfield, MA 02/25/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments from Michael and Diane Kane of River Residents Association, Connecticut River concerns regarding the Turner Falls and Northfield Projects 02/25/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments from Cynthia S. Dale of River Residents Association Connecticut River concerns regarding the Turner Falls Project and Northfield Mountain Projects 02/25/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Letter to FERC from Connecticut River Residents concerning Northfield Mountain and Turners Falls Dam licensing issues 02/25/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments from Robert Stafford and Family of River Residents Association, Connecticut River concerns regarding the Turner Falls and Northfield Projects 02/25/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Transcript of 1/31/13 scoping meeting held in Turners Falls, Massachusetts for the Connecticut River Projects' Cumulative Effects re TransCanada Hydro Northeast, Inc and FirstLight Hydro Generating Company 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Transcript of 1/31/13 scoping meeting held in Turners Falls, Massachusetts for the Northfield Mountain and Turners Falls Hydroelectric Projects re FirstLight Hydro Generating Company 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
SD1 Comments, PAD Comments, and Study Requests of the Massachusetts Division of Fisheries and Wildlife (MADFW) 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments on the Preliminary Application Document, Scoping Document 1, and Study Requests submitted by the Landowners and Concerned Citizens for License Compliance 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Appalachian Mountain Club, Vermont River Conservancy, and Friends 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Photos from Anonymous River Resident regarding the Turner Falls and Northfield Projects 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Supplemental/Additional Information Response to Data Request of Town of Montague, MA, Native American Cultural Landscape District Properties in Turners Falls Management Plan 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download