Simons, D.B., Andrew, J.W., Li, R.M., & Alawady, M.A. (1979). Connecticut River Streambank Erosion Study: Massachusetts, New Hampshire, and Vermont. Waltham, MA: US Army Corps of Engineers (USACE). |
01/01/1979 |
Geology and Soils |
Download
|
US Army Corps of Engineers (USACE). 1991. General investigation study - Connecticut River streambank erosion. Waltham, MA: USACE, New England Division. |
01/01/1991 |
Geology and Soils |
Download
|
Northrop, Devine and Tarbell, Inc.. 1991. Connecticut River Riverbank Management Master Plan (Draft). Northeast Utilities Service Company, Inc. |
01/01/1991 |
Geology and Soils |
Download
|
Field Geology Services. (2007). Fluvial geomorphology study of the Turners Falls Pool on the Connecticut River between Turners Falls, MA and Vernon, VT. Prepared for Northfield Mountain Pumped Storage Project. Farmington, ME: Field Geology Services. |
01/01/2007 |
Geology and Soils |
Download
|
Field, John. 2011. Detailed Analysis of the 2008 Full River Reconnaissance of the Turners Falls Pool on the Connecticut River: Unpublished report prepared for The Landowners and Concerned Citizens for License Compliance. |
01/01/2011 |
Geology and Soils |
Download
|
Pre-Application Document (PAD) For The Turners Falls Hydroelectric Project (No. 1889) and the Northfield Mountain Pumped Storage Project (No. 2485) |
10/30/2012 |
Pre-Application Document |
Download
|
Notification of Intent (NOI) of Firstlight Hydro Generation Company to File an Application for A New License For The Turners Falls Hydroelectric Project (No. 1889) and the Northfield Mountain Pumped Storage Project (No. 2485) |
10/30/2012 |
Notice of Intent |
Download
|
Scoping Document 1 for TransCanada Hydro Northeast Inc. (Wilder Project, Bellows Falls, Vernon Project) and FirstLight (Turner Falls, Northfield Mountain) |
12/21/2012 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Modification to Integrated Licensing Process Schedule |
12/21/2012 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Analysis of Erosion in Vicinity of Route 10 Bridge Spanning the Connecticut River prepared by Simons & Associates (2012). |
01/08/2013 |
Geology and Soils |
Download
|
Aquatic Mesohabitat Assessment and Mapping prepared by FirstLight (2012) |
01/08/2013 |
Fish and Aquatics |
Download
|
Riverbank Erosion Comparison along the Connecticut River prepared by Simons & Associates (2012) |
01/08/2013 |
Geology and Soils |
Download
|
Freshwater Mussel Survey in the Connecticut River for the Turners Falls and Northfield Mountain Hydroelectric Projects prepared by Biodrawversity (2012) |
01/08/2013 |
Fish and Aquatics |
Download
|
WD Cowls, Inc. submit comments in lieu of attending FERC Scoping Meeting |
01/14/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Massachusetts Historical Commission comments to assist in compliance with Section 106 of the National Historic Preservation Act oof 1966 as amended (36 CFR 800). |
01/16/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Instream Flow Study Scoping Meeting with Fish Agencies |
01/24/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
1/30/2013 - 1/31/2013 - FERC Scoping Meetings Presentation |
01/30/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Landowners & Concerned Citizens for License Compliance (LCCLC) Comments on proposed Relicensing of Turner Falls and Northfield Mountain |
01/30/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
New England Flow and American Whitewater's Comments and Study Requests |
01/30/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments from the Appalachian Mountain Club (AMC Riverwide Issues) |
01/30/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments from the Appalachian Mountain Club, headquartered in Boston, Mass., on riverwide issues in the proposed relicensing Connecticut River Facilities. |
01/30/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Scoping proposal for noise study, filed by Warren Ondras |
01/31/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments from Leena Newcomb of River Residents Association regarding the Turner Falls Project and Northfield Mountain Projects |
01/31/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments of Thomas Shearer et al re the Northfield Mountain Pumped Storage Project |
01/31/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Filing: Submitted on behalf of the Landowners and Concerned Citizens for License Compliance. Comments on the draft QAPP for the 2013 Full River Reconnaissance |
02/04/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Filing: REFILE of the Request of Massachusetts Division of Fisheries and Wildlife under P-1889, et al. |
02/11/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments from Peter W. Conway of River Residents Association re regarding the Turner Falls Project and Northfield Mountain Projects |
02/16/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments from Stanley Johnson of River Residents Association regarding the Turner Falls and Northfield Projects |
02/16/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments of Four Star Farms, Inc. re the Northfield Mountain Relicensing |
02/20/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Filing: Supplemental Information of FERC Staff under P-1889, et. al.. Town of Montague files the National Register Eligibility Notification for the Turners Falls Ceremonial Site and concept paper for the Great Falls Native Cultural Park |
02/20/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
The Western Massachusetts Climbers’ Coalition Scoping Comments for the Northfield Mountain Pumped Storage Project |
02/20/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Filing: Supplemental Information of FERC Staff under P-1889, et. al.. Email communications between Kenneth Hogan of the Commission's Staff and Ms. Leena Newcomb representing The River Residents Association |
02/20/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FERC Filing: Comment of FirstLight Hydro Generating Company on Scoping Document 1 under P-1889, et. al. |
02/22/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Northfield Conservation Commission, Town of Northfield, MA submits Comments re Northfield Mountain Pumped Storage Project |
02/22/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Draft Study plan - "Conduct Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station" |
02/22/2013 |
Fish and Aquatics |
Download
|
Comments or Study Request of Ashuelot River Local Advisory Committee |
02/24/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments from Leena Newcomb of the River Residents Association re the Turners Falls Project |
02/25/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments from Robert and Linda Emond of River Residents Association, Connecticut River concerns regarding the Turner Falls and Northfield Projects |
02/25/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Comments by Karl Meyer, Greenfield, MA |
02/25/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments from Michael and Diane Kane of River Residents Association, Connecticut River concerns regarding the Turner Falls and Northfield Projects |
02/25/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments from Cynthia S. Dale of River Residents Association Connecticut River concerns regarding the Turner Falls Project and Northfield Mountain Projects |
02/25/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Letter to FERC from Connecticut River Residents concerning Northfield Mountain and Turners Falls Dam licensing issues |
02/25/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments from Robert Stafford and Family of River Residents Association, Connecticut River concerns regarding the Turner Falls and Northfield Projects |
02/25/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Transcript of 1/31/13 scoping meeting held in Turners Falls, Massachusetts for the Connecticut River Projects' Cumulative Effects re TransCanada Hydro Northeast, Inc and FirstLight Hydro Generating Company |
02/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Transcript of 1/31/13 scoping meeting held in Turners Falls, Massachusetts for the Northfield Mountain and Turners Falls Hydroelectric Projects re FirstLight Hydro Generating Company |
02/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
SD1 Comments, PAD Comments, and Study Requests of the Massachusetts Division of Fisheries and Wildlife (MADFW) |
02/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments on the Preliminary Application Document, Scoping Document 1, and Study Requests submitted by the Landowners and Concerned Citizens for License Compliance |
02/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Appalachian Mountain Club, Vermont River Conservancy, and Friends |
02/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Photos from Anonymous River Resident regarding the Turner Falls and Northfield Projects |
02/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Supplemental/Additional Information Response to Data Request of Town of Montague, MA, Native American Cultural Landscape District Properties in Turners Falls Management Plan |
02/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|