2014 Initial Study Report. Summary Study 3.3.1. |
09/15/2014 |
Fish and Aquatics |
Download
|
2014 Initial Study Report. Summary Study 3.2.2. |
09/15/2014 |
Water Resources |
Download
|
2014 Initial Study Report. Summary Study 3.1.2 |
09/15/2014 |
Geology and Soils |
Download
|
2014 Initial Study Report Meeting Presentation |
09/25/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
2014 Initial Study Report Meeting-Call in Number |
09/25/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
2014 Initial Study Meeting Summary |
10/15/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Revised Study Plan 3.3.20 Entrainment of American shad ichthyoplankton at the Northfield Mountain Pumped Storage Project |
10/16/2014 |
Fish and Aquatics |
Download
|
FirstLight Letter Response to Connecticut River Streambank Erosion Committee Full River Reconnaissance Data Request received October 22, 2014 |
10/29/2014 |
Geology and Soils |
Download
|
Proposed Study Plan for the Acoustic Evaluation of Juvenile American Shad and Adult American Eel Passage and Entrainment |
11/04/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Sediment Management Plan – Report of 2014 Activities for Northfield Mountain Pumped Storage Project (FERC No. 2485) |
12/01/2014 |
Geology and Soils |
Download
|
FirstLight Proposed Modification to Study Plan 3.3.2 Evaluate Upstream and Downstream Passage of Adult American Shad |
12/08/2014 |
Fish and Aquatics |
Download
|
FirstLight Response to Stakeholder Comments on the Initial Study Report and Meeting Summary |
12/15/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Filing of November 17, 2014 Meeting Minutes re: Consultation on Studies employing Hydroacoustic and Telemetry Methods |
12/22/2014 |
Fish and Aquatics |
Download
|
FirstLight Study Report No. 3.7.2 Historic Architechtural Resources Survey & National Register Evaluation (Re-Submission) |
01/20/2015 |
Cultural |
Download
|
FirstLight Study No. 3.3.16 Interim Report - Habitat Assessment, Surveys, and Modeling for State-Listed Mussel Speices in the Connecticut River below Cabot Station |
01/29/2015 |
Fish and Aquatics |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 4 |
02/24/2015 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 5 |
02/24/2015 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 2 |
02/24/2015 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 1 |
02/24/2015 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 3 |
02/24/2015 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment B-2007 to 2014 Photo Comparison |
02/24/2015 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 6 |
02/24/2015 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Cover Letter |
02/24/2015 |
Geology and Soils |
Download
|
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Form Flow 2500) |
03/31/2015 |
Recreation and Land Use |
Download
|
FirstLight Response to EPA Comments on Northfield Mountain Pumped Storage Project Sediment Management Plan – 2014 Summary of Annual Monitoring |
03/31/2015 |
Geology and Soils |
Download
|
Relicensing Study 3.2.2 Hydraulic Study of Turner Falls Impoundment, Bypass Reach and Below Cabot |
03/31/2015 |
Water Resources |
Download
|
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Form Flow 3500) |
03/31/2015 |
Recreation and Land Use |
Download
|
FirstLight CoverLetter Posting of First Quarter 2015 Study Reports, Turners Falls Hydroelectric Project (FERC No. 1889) and Northfield Mountain Pumped Storage Project (FERC No. 2485) |
03/31/2015 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Study 3.6.3 Whitewater Boating Evaluation |
03/31/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.7.3 Traditional Cultural Properties Study Report |
03/31/2015 |
Cultural |
Download
|
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Form Flow 5000) |
03/31/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Comparative Flow Evaluation Form) |
03/31/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Form Flow 8000) |
03/31/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.3.18 Impacts of the Turner Falls Canal Drawdown on Fish Migration and Aquatic Organisms |
03/31/2015 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.4 Evaluate Upstream Passage of American Eel at the Turner Falls Project |
03/31/2015 |
Fish and Aquatics |
Download
|
Relicensing Study 3.6.4 Assessment of Day Use and Overnight Facilities associated with Non-Motorized Boats |
03/31/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Form Flow 10000) |
03/31/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Form Flow 13000) |
03/31/2015 |
Recreation and Land Use |
Download
|
Interim Relicensing Study 3.3.10 Assess Operational Impacts on Emergence of State-Listed Odonated in the Connecticut River |
04/02/2015 |
Fish and Aquatics |
Download
|
Study 3.6.2 Recreation Facilities Inventory and Assessment Addendum Cover Letter |
06/15/2015 |
Recreation and Land Use |
Download
|
Study 3.6.2 Recreation Facilities Inventory and Assessment Addendum |
06/15/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.4.2 Effects of Northfield Mountain Pumped Storage Development Related to Land Management Practices and Recreation Use on Terrestral Habitats |
06/30/2015 |
Terrestrial |
Download
|
FirstLight CoverLetter Posting of Second Quarter 2015 Study Reports, Turners Falls Hydroelectric Project (FERC No. 1889) and Northfield Mountain Pumped Storage Project (FERC No. 2485) |
06/30/2015 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Study 3.3.17 Assess the Impacts of Turner Falls Project and Northfield Project Operations on Tributary and Backwater Area Access and Habitat |
06/30/2015 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.14 Aquatic Habitat Mapping of Turner Falls Impoundment |
06/30/2015 |
Fish and Aquatics |
Download
|
Relicensing Study 3.6.7 Recreation Study at Northfield Mountain, including Assessment of Sufficient of Trails for Shared Use |
06/30/2015 |
Recreation and Land Use |
Download
|
FristLight Notification of Updated Study Report Meetings September 29 and 30, 2015 |
07/21/2015 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Revised Appendix C for Completed Study Report for Study No. 3.7.2 (NH Area Form) |
07/22/2015 |
Cultural |
Download
|
Revised Appendix C for Completed Study Report for Study No. 3.7.2 (Transmittal Letter) |
07/22/2015 |
Cultural |
Download
|
Updated Study Report Summary 3.3.13 Impacts of the Turner Falls Project and Northfield Mountain Project on Littoral Zone Fish Habitat and Spawning Habitat |
09/14/2015 |
Fish and Aquatics |
Download
|