Relicensing Study 3.3.7 Fish Entrainment and Turbine Passage Mortality Study |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.5.1 Baseline Inventory of Wetland, Riparian and Littoral Habitat in the Turners Falls Impoundment and Assessment of Operational Impacts on Special Status Species Addendum - Public Version |
10/01/2016 |
Wetlands |
Download
|
Relicensing Study 3.6.6 Assessment of Effects of Project Operation on Recreation and Land Use |
10/01/2016 |
Recreation and Land Use |
Download
|
FirstLight Transmittal Letter filing 10 Study Reports, 3 Addenda and Agenda for Study Report Meetings Oct 31, 2016 and Nov 1, 2016 |
10/14/2016 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Presentation for Study Report Meetings Oct 31, 2016 and Nov 1, 2016 |
10/31/2016 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Updated Study Report (URS) Study Meeting Summary (10/31/16 - 11/1/2016) |
11/15/2016 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Notification Letter providing revised FERC filing date for the Relicensing Study Report No. 3.1.2 Northfield Mountain/Turners Falls Operations Impacts on Existing Erosion and Potential Bank Instability Addendum |
11/18/2016 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Study 3.3.10 Assess Operational Impacts on Emergence of State-Listed Odonates in the Connecticut River 2014-2016 Study Report |
12/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.20 Ichthyoplankton Entrainment Assessment at Northfield Mountain Project -Second year |
12/01/2016 |
Fish and Aquatics |
Download
|
FirstLight Discuss Instream Flow Study (FirstLight Study No 3.3.1) Meeting Summary (12/2/2016) |
12/02/2016 |
Fish and Aquatics |
Download
|
FirstLight Transmittal Letter FERC filing Study Reports 3.3.10 and 3.3.20 |
12/28/2016 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Response to Stakeholder Requests for Study Modifications and/or New Studies Based on the Study Report and Meeting Summary (1/17/2017) |
01/17/2017 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight letter to FERC requesting filing date extension until April 3, 2017 for Study No. 3.1.2 Addendum |
02/22/2017 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Notification of Updated Study Report Meeting March 1, 2017 |
02/23/2017 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Study 3.8.1 Evaluate the Impact of Current and Potential Future Modes of Operations on Flow, Water Elevation and Hydropower Generation |
03/01/2017 |
Operations |
Download
|
Relicensing Study 3.3.5 Evaluate Downstream Passage of American Eel |
03/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.19 Evaluate the use of Ultrasound Array to Facilitate Upstream Movement to Turners Falls Dam by Avoiding Cabot Station Tailrace |
03/01/2017 |
Fish and Aquatics |
Download
|
Transmittal Letter Filing of Study Reports 3.3.5, 3.3.19, 3.8.1 and Agenda for Study Report Meeting, March 16, 2017 |
03/01/2017 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Response to the January 15, 2017 letter from the Narragansett Indian Tribe (NIT) regarding Traditional Cultural Properties Study |
03/01/2017 |
Cultural |
Download
|
FirstLight Response to the January 17, 2017 letter from the Elnu Abenaki Tribe regarding Traditional Cultural Properties Study |
03/01/2017 |
Cultural |
Download
|
Presentation for Study Report Meeting March 16, 2017 |
03/16/2017 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Study Report Meeting Summary (March 16, 2017) |
03/31/2017 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume II (Re-Issue 2017) |
04/01/2017 |
Geology and Soils |
Download
|
Relicensing Study 3.5.1 Baseline Inventory of Wetland, Riparian and Littoral Habitat in the Turners Falls Impoundment and Assessment of Operational Impacts on Special Status Species Addendum 2 - Public Version |
04/01/2017 |
Wetlands |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D7) |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume III (Re-Issue 2017) Appendix J-II |
04/01/2017 |
Geology and Soils |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment E2) |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D6) |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D1) |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume III (Re-Issue 2017) |
04/01/2017 |
Geology and Soils |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D3) |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D2) |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D4) |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study 3.5.1 Baseline Inventory of Wetland, Riparian and Littoral Habitat in the Turners Falls Impoundment and Assessment of Operational Impacts on Special Status Species Addendum 2 - Public Version (Attachment) |
04/01/2017 |
Wetlands |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment E1) |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume I (2017) |
04/01/2017 |
Geology and Soils |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D5) |
04/01/2017 |
Fish and Aquatics |
Download
|
FirstLight analysis of expanded use of the Upper Reservoir on potential shoreline erosion of the Turners Falls Impoundment |
04/03/2017 |
Operations |
Download
|
FirstLight Transmittal Letter FERC filing 2017 Study Reports 3.1.2 (re-issue), 3.3.1 Addendum 1, 3.5.1 Addendum 2 |
04/03/2017 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight response Massachusetts Department of Environmental Protection (MADEP) comments on the Erosion Causation Report letter dated December 14, 2016 |
04/03/2017 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Study 3.3.2 Evaluate Upstream and Downstream Passage Addendum 1 |
05/01/2017 |
Fish and Aquatics |
Download
|
Errata Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment E2 Errata) |
05/01/2017 |
Fish and Aquatics |
Download
|
FirstLight Cover Letter for filing 2017 Study Report 3.3.2, 3.3.3 Addendums and 3.3.1 Errata |
05/01/2017 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Study 3.3.3 Evaluate Downstream Pass Evaluate Downstream Pass Evaluate Downstream Passage Addendum 1 |
05/01/2017 |
Fish and Aquatics |
Download
|
FirstLight files status of additional data required for Relicensing Studies No. 3.3.1 and 3.3.15 by FERC's February 17, 2017 Study Plan Determination Letter |
05/11/2017 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight files Response to Stakeholder Requests for Study Modifications and/or New Studies Based on the Study Report |
05/30/2017 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station - IFIM for Mussels 2017 |
08/01/2017 |
Fish and Aquatics |
Download
|
FirstLight cover letter filing 2017 Relicensing Study 3.3.1 IFIM for Reach 5 Mussels |
08/23/2017 |
Fish and Aquatics |
Download
|
FirstLight Update to FERC Outstanding Addendums, Additional Proposed Studies and Proposed Schedule |
02/23/2018 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|