FERC Letter Determination on Requests for Study Modifications and New Studies |
01/15/2016 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Study 3.3.8 Computational Fluid Dynamics Modeling in the Vicinity of the Fishway Entrances and Powerhouse Forebays |
02/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.10 Assess Operational Impacts on Emergence of State-Listed Odonates in the Connecticut River |
02/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.4.1 Baseline Study of Terrestrial Wildlife and Botanical Resources |
02/04/2016 |
Terrestrial |
Download
|
Relicensing Study 3.2.2 Hydraulic Study Addendum |
02/04/2016 |
Water Resources |
Download
|
Relicensing Study 3.3.18 Impacts of the Turners Falls Canal Drawdown on Fish Migration and Aquatic Organisms Addendum |
02/12/2016 |
Fish and Aquatics |
Download
|
Notification of Study Report Meeting, March 16, 2016 |
02/12/2016 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Study 3.3.20 Ichthyoplankton Entrainment Assessment at the Northfield Mountain Pumped Storage Project |
02/12/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.4 Evaluate Upstream Passage of American Eel at the Turners Falls Project |
02/12/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.5.1 Baseline Inventory of Wetland, Riparian and Littoral Habitat in the Turners Falls Impoundment, and Assessment of Operational Impacts on Special-Status Species |
02/12/2016 |
Wetlands |
Download
|
Revised Study Plan 3.3.19 - Evaluate the Use of an Ultrasound Array to Facilitate Upstream Movement to Turners Falls Dam by Avoiding Cabot Station Tailrace |
02/18/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.2.1 Water Quality Monitoring Study |
03/01/2016 |
Water Resources |
Download
|
Relicensing Study 3.3.12 Evaluation of Emergency Gate and Bypass Flume Discharges |
03/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.6 Impact of Project Operations on Shad Spawning, Spawning Habitat and Egg Deposition in the area of the Northfield Mountain and Turners Falls Projects |
03/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.11 Fish Assemblage Assessment |
03/01/2016 |
Fish and Aquatics |
Download
|
Filing of Study Reports, Proposed Schedule, and Process Plan for Remaining Study Reports |
03/01/2016 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight - March 8, 2016 Study 3.3.2 Adult Shad Telemetry Data Analysis Meeting. Presentation. |
03/08/2016 |
Fish and Aquatics |
Download
|
FirstLight - March 8, 2016 Study 3.3.2 Adult Shad Telemetry Data Analysis Meeting. Memorandum. |
03/08/2016 |
Fish and Aquatics |
Download
|
FirstLight- March 16, 2016 Study Report Meeting |
03/14/2016 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
March 16, 2016, Study Meeting Summary. |
03/31/2016 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Responses to Connecticut River Watershed Council comment letter dated March 25, 2016 and Mr. Karl Meyer comment letter dated March 27, 2016 |
04/22/2016 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Final License Application Exhibit B |
04/29/2016 |
Final License Application |
Download
|
Final License Application Exhibit G |
04/29/2016 |
Final License Application |
Download
|
Final License Application Exhibit H |
04/29/2016 |
Final License Application |
Download
|
Final License Application Cover Letter |
04/29/2016 |
Final License Application |
Download
|
Final License Application Exhibit D |
04/29/2016 |
Final License Application |
Download
|
Final License Application Exhibit A |
04/29/2016 |
Final License Application |
Download
|
Final License Application Exhibit C |
04/29/2016 |
Final License Application |
Download
|
Final License Application Initial Statement and Additional Information |
04/29/2016 |
Final License Application |
Download
|
Final License Application Exhibit E |
04/29/2016 |
Final License Application |
Download
|
FirstLight Response to Stakeholder Requests for Study Modifications and/or New Studies Based on the Study Report and Meeting Summary (5/31/2016) |
05/31/2016 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Study 3.3.15 Assessment of Adult Sea Lamprey Spawning within the Turners Falls Project and Northfield Mountain Project Area |
06/30/2016 |
Fish and Aquatics |
Download
|
FirstLight letter to FERC notifying study reports 3.3.13 and 3.3.15 uploaded to website |
06/30/2016 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Study 3.3.13 Impacts of the Turners Falls Project and Northfield Mountain Project on Littoral Zone Fish Habitat and Spawning Habitat Study Report |
06/30/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume I (2016) |
09/01/2016 |
Geology and Soils |
Download
|
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume II (2016) |
09/01/2016 |
Geology and Soils |
Download
|
Relicensing Study 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station (Appendix E) |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.8 Computational Fluid Dynamics Modeling in the Vicinity of the Fishway Entrances and Powerhouse Forebays Addendum |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.2. Evaluate Upstream and Downstream Passage of Adult American Shad Study Report |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.16 Habitat Suitability Criteria for State-listed Mussel Species in the Connecticut River below Cabot Station Study Report |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.1.2 Northfield Mountain/Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report, Volume I (2016) |
10/01/2016 |
Geology and Soils |
Download
|
Relicensing Study 3.1.3 Northfield Mountain Pumped Storage Project Sediment Management Plan |
10/01/2016 |
Geology and Soils |
Download
|
Relicensing Study 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.13 Impacts of the Turners Falls Project and Northfield Mountain Project on Littoral Zone Fish Habitat and Spawning Habitat Study Report (same report as posted 6/30/2016) |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.1.2 Northfield Mountain/Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report, Volume II (2016) |
10/01/2016 |
Geology and Soils |
Download
|
Relicensing Study 3.3.15 Assessment of Adult Sea Lamprey Spawning within the Turners Falls Project and Northfield Mountain Project Area (same report as posted 6/30/16) |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.1.2 Northfield Mountain/Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report, Volume III (2016) |
10/01/2016 |
Geology and Soils |
Download
|
Relicensing Study 3.3.3 Evaluate Downstream Passage of Juvenile American Shad Interim Study Report |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.6 Impact of Project Operations on Shad Spawning, Spawning Habitat and Egg Deposition in the area of the Northfield Mountain and Turners Falls Projects Addendum |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.3 Evaluate Downstream Passage of Juvenile American Shad Interim Study Report |
10/01/2016 |
Fish and Aquatics |
Download
|