Relicensing Study 3.6.1 Recreation Use/User Contact Survey Study Report |
12/31/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.6.7 Recreation Study at Northfield Mountain, including Assessment of Sufficient of Trails for Shared Use |
06/30/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.6.5 Land Use Inventory Study Report |
12/31/2015 |
Recreation and Land Use |
Download
|
FirstLight Letter Additional Information on Study Plan 3.6.3, Whitewater Boating Evaluation |
02/10/2014 |
Recreation and Land Use |
Download
|
Updated Study Report Summary 3.6.1 Recreational Use/User Contact Survey |
09/14/2015 |
Recreation and Land Use |
Download
|
Updated Study Report Summary 3.6.5 Land Use Inventory |
09/14/2015 |
Recreation and Land Use |
Download
|
Study 3.6.2 Recreation Facilities Inventory and Assessment Addendum Cover Letter |
06/15/2015 |
Recreation and Land Use |
Download
|
FERC Letter to FirstLight Hydro Generating Company providing Identified PAD Deficiencies, Additional Information Requests, and Study Requests |
03/01/2013 |
Pre-Application Document |
Download
|
Pre-Application Document (PAD) For The Turners Falls Hydroelectric Project (No. 1889) and the Northfield Mountain Pumped Storage Project (No. 2485) |
10/30/2012 |
Pre-Application Document |
Download
|
FirstLight analysis of expanded use of the Upper Reservoir on potential shoreline erosion of the Turners Falls Impoundment |
04/03/2017 |
Operations |
Download
|
2014 Initial Study Report. Summary Study 3.8.1. |
09/15/2014 |
Operations |
Download
|
Updated Study Report Summary 3.8.1 Evaluate the IMpact of Current and Proposed Future Modes of Operation on Flow, Water Elevation and Hydropower Generation |
09/14/2015 |
Operations |
Download
|
Relicensing Study 3.8.1 Evaluate the Impact of Current and Potential Future Modes of Operations on Flow, Water Elevation and Hydropower Generation |
03/01/2017 |
Operations |
Download
|
Notification of Intent (NOI) of Firstlight Hydro Generation Company to File an Application for A New License For The Turners Falls Hydroelectric Project (No. 1889) and the Northfield Mountain Pumped Storage Project (No. 2485) |
10/30/2012 |
Notice of Intent |
Download
|
Letter from FirstLight pertaining to the causation study (Study No. 3.1.2) |
08/12/2014 |
Geology and Soils |
Download
|
FirstLight Response to EPA Comments on Northfield Mountain Pumped Storage Project Sediment Management Plan – 2014 Summary of Annual Monitoring |
03/31/2015 |
Geology and Soils |
Download
|
Schedule for Filing 2013 Full River Reconnaissance Report |
06/27/2013 |
Geology and Soils |
Download
|
EPA Comments of EPA New England under P-2485, comments on PSP Section 3.1 Geology and Soils |
07/11/2013 |
Geology and Soils |
Download
|
2014 Initial Study Report. Study 3.1.1 |
09/15/2014 |
Geology and Soils |
Download
|
FERC Order Approving FirstLight 2013 Full River Reconnaissance (FRR) Report Schedule for the Northfield Mountain |
10/02/2013 |
Geology and Soils |
Download
|
Field Geology Services. (2007). Fluvial geomorphology study of the Turners Falls Pool on the Connecticut River between Turners Falls, MA and Vernon, VT. Prepared for Northfield Mountain Pumped Storage Project. Farmington, ME: Field Geology Services. |
01/01/2007 |
Geology and Soils |
Download
|
2014 Initial Study Report. Summary Study 3.1.3. |
09/15/2014 |
Geology and Soils |
Download
|
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume III (Re-Issue 2017) Appendix J-II |
04/01/2017 |
Geology and Soils |
Download
|
Northrop, Devine and Tarbell, Inc.. 1991. Connecticut River Riverbank Management Master Plan (Draft). Northeast Utilities Service Company, Inc. |
01/01/1991 |
Geology and Soils |
Download
|
Simons, D.B., Andrew, J.W., Li, R.M., & Alawady, M.A. (1979). Connecticut River Streambank Erosion Study: Massachusetts, New Hampshire, and Vermont. Waltham, MA: US Army Corps of Engineers (USACE). |
01/01/1979 |
Geology and Soils |
Download
|
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume II (Re-Issue 2017) |
04/01/2017 |
Geology and Soils |
Download
|
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume I (2016) |
09/01/2016 |
Geology and Soils |
Download
|
US Army Corps of Engineers (USACE). 1991. General investigation study - Connecticut River streambank erosion. Waltham, MA: USACE, New England Division. |
01/01/1991 |
Geology and Soils |
Download
|
Relicensing Study 3.1.3 Sediment Management Plan |
09/14/2015 |
Geology and Soils |
Download
|
Sediment Management Plan – Report of 2014 Activities for Northfield Mountain Pumped Storage Project (FERC No. 2485) |
12/01/2014 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment B-2007 to 2014 Photo Comparison |
02/24/2015 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 1 |
02/24/2015 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 2 |
02/24/2015 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 3 |
02/24/2015 |
Geology and Soils |
Download
|
Relicensing Study 3.1.2 Northfield Mountain/Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report, Volume I (2016) |
10/01/2016 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Cover Letter |
02/24/2015 |
Geology and Soils |
Download
|
FERC Letter Acknowledging Receipt of Sediment Management Plan - 2013 Summary of Annual Monitoring |
01/23/2014 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 6 |
02/24/2015 |
Geology and Soils |
Download
|
Riverbank Erosion Comparison along the Connecticut River prepared by Simons & Associates (2012) |
01/08/2013 |
Geology and Soils |
Download
|
Relicensing Study 3.1.3 Northfield Mountain Pumped Storage Project Sediment Management Plan |
10/01/2016 |
Geology and Soils |
Download
|
Analysis of Erosion in Vicinity of Route 10 Bridge Spanning the Connecticut River prepared by Simons & Associates (2012). |
01/08/2013 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 5 |
02/24/2015 |
Geology and Soils |
Download
|
FirstLight Letter Response to Connecticut River Streambank Erosion Committee Full River Reconnaissance Data Request received October 22, 2014 |
10/29/2014 |
Geology and Soils |
Download
|
Field, John. 2011. Detailed Analysis of the 2008 Full River Reconnaissance of the Turners Falls Pool on the Connecticut River: Unpublished report prepared for The Landowners and Concerned Citizens for License Compliance. |
01/01/2011 |
Geology and Soils |
Download
|
Relicensing Study 3.1.2 Northfield Mountain/Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report, Volume III (2016) |
10/01/2016 |
Geology and Soils |
Download
|
Relicensing Study 3.1.2 Northfield Mountain/Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report, Volume II (2016) |
10/01/2016 |
Geology and Soils |
Download
|
Sediment Management Plan – Report of 2015 Activities for Northfield Mountain Pumped Storage Project (FERC No. 2485) |
12/01/2015 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 4 |
02/24/2015 |
Geology and Soils |
Download
|
Sediment Management Plan - 2013 Summary of Annual Monitoring |
12/02/2013 |
Geology and Soils |
Download
|
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume I (2017) |
04/01/2017 |
Geology and Soils |
Download
|