Licensing Documents

Filter

Document Title Date of Filing Contents Download
FirstLight - March 8, 2016 Study 3.3.2 Adult Shad Telemetry Data Analysis Meeting. Presentation. 03/08/2016 Fish and Aquatics Download
Updated Study Report Summary 3.3.8 Computation Fluid Dynamics Modeling in the Vicinity of the Fishway Entrances and Powerhouse Forebays 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.6 Impact of Project Operations on Shad Spawning, Spawning Habitat and Egg Deposition in the area of Northfield Mountain and Turner Falls Projects 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.5 Evaluate Downstream Passage of American Eel 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.16 Habitat Assessment, Surveys, and Modeling of Suitable Habitat for State-Listed Mussel Species in the Connecticut River Below Cabot Station 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.3 Evaluate Downstream Passage of Juvenile American Shad 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.12 Evaluate Frequency and Impact of Emergency Water Control Gate Discharge Events and Bypass Flume Events on Shortnose Sturgeon Spawning and Rearing Habitat in the Tailrace and Downstream From Cabot Station 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.13 Impacts of the Turner Falls Project and Northfield Mountain Project on Littoral Zone Fish Habitat and Spawning Habitat 09/14/2015 Fish and Aquatics Download
Relicensing Study 3.3.2 Evaluate Upstream and Downstream Passage Addendum 1 05/01/2017 Fish and Aquatics Download
Updated Study Report Summary 3.3.15 Assessment of Adult Sea Lamprey Spawning with the Turner Falls Project and Northfield Mountain Project Area 09/14/2015 Fish and Aquatics Download
FirstLight files Turners Falls Project - Fish Passage Facilities 2013 Annual Report of Operations 03/15/2014 Fish and Aquatics Download
Letter from FirstLight Re: Study No. 3.3.18- Impact of Turners Falls Canal Drawdown on Fish Migration and Aquatic Organisms 08/15/2014 Fish and Aquatics Download
Relicensing Study 3.3.3 Evaluate Downstream Pass Evaluate Downstream Pass Evaluate Downstream Passage Addendum 1 05/01/2017 Fish and Aquatics Download
FirstLight Proposed Modification to Study Plan 3.3.2 Evaluate Upstream and Downstream Passage of Adult American Shad 12/08/2014 Fish and Aquatics Download
FERC Memo: FERC Staff Memo to Public Records documenting telephone conversation between Commission staff and Dr. Theodore Castro-Santos of the U.S. Geological Survey’s S.O. Conte Anadromous Fish Research Center 02/03/2014 Fish and Aquatics Download
Relicensing Study 3.3.5 Evaluate Downstream Passage of American Eel 03/01/2017 Fish and Aquatics Download
Letter from FirstLight regarding Study No. 3.3.6 Impact of Project Operations on Shad Spawning, Spawning Habitat and Egg Deposition in the Area of the Northfield Mountain and Turners Falls Project. 08/25/2014 Fish and Aquatics Download
Relicensing Study 3.3.19 Evaluate the Use of an Ultrasound Array to Facilitate Upstream Movement to Turners Falls Dam by avoiding Cabot Station Tailrace -2018 Study Report 03/01/2019 Fish and Aquatics Download
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D2) 04/01/2017 Fish and Aquatics Download
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 04/01/2017 Fish and Aquatics Download
Relicensing Study 3.3.15 Assessment of Sea Lamprey Spawning within Assessment of Sea Lamprey Spawning within Turners Falls Turners Falls Project Northfield Mountain Project Area Addendum 1 Impact on Sea Lamprey Spawning Nests near Stebbins Island 05/01/2018 Fish and Aquatics Download
Relicensing Study 3.3.20 Ichthyoplankton Entrainment Assessment at Northfield Mountain Project -Second year 12/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.4 Evaluate Upstream Passage of American Eel at the Turner Falls Project 03/31/2015 Fish and Aquatics Download
2014 Initial Study Report. Summary Study 3.3.19. 09/15/2014 Fish and Aquatics Download
Relicensing Study 3.3.13 Impacts of the Turners Falls Project and Northfield Mountain Project on Littoral Zone Fish Habitat and Spawning Habitat Study Report 06/30/2016 Fish and Aquatics Download
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D4) 04/01/2017 Fish and Aquatics Download
Updated Study Report Summary 3.3.4 Evaluate Upstream Passage of American Eel at the Turner Falls Project 09/14/2015 Fish and Aquatics Download
Udated Study Report Summary 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Project Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace 09/14/2015 Fish and Aquatics Download
Final License Application Exhibit G 04/29/2016 Final License Application Download
Final License Application Initial Statement and Additional Information 04/29/2016 Final License Application Download
Final License Application Exhibit C 04/29/2016 Final License Application Download
Final License Application Exhibit A 04/29/2016 Final License Application Download
Final License Application Exhibit E 04/29/2016 Final License Application Download
Final License Application Exhibit H 04/29/2016 Final License Application Download
Final License Application Exhibit D 04/29/2016 Final License Application Download
Final License Application Exhibit B 04/29/2016 Final License Application Download
Final License Application Cover Letter 04/29/2016 Final License Application Download
June 11-12, 2013 Working Group 3: Recreation and Land Use Resources, Aesthetic Resources , Cultural Resources Meeting Presentation 06/10/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Hydro Generating Company files Notification of Dates and Agenda for 2014 Initial Study Report Meeting 08/21/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Proposed Study Plan (PSP) for the relicensing of the Turners Falls Project and Northfield Mountain Project (Volume 2 Appendix A) 04/15/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
June 5, 2013 Working Group 2: Aquatic Resources, Terrestial, Wetlands, Riparian Resources Meeting Presentation 06/05/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Meeting Memo. FWS Formal Dispute Resolution. Meeting between Commission staff, the U.S. Fish and Wildlife Service (FWS) and FirstLight Hydro Generating Company (FirstLight) on the FWS’s formal dispute filed on March 13, 2014 04/16/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Letter requesting the Dispute Resolution Panel to provide recommendation by 5/2/14 re the Suspension of Dispute Resolution Panel 05/02/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
USDOI/Fish and Wildlife Service/NEFO Submits ILP Proposed Study Plan or Revised Study under P-2485. 05/02/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Supplemental Information from USDOI/Fish and Wildlife Service/NEFO re: Submitted ILP Proposed Study Plan or Revised Study under P-2485. 05/02/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Letter Supplemental/Additional Information to FERC re USFWS Proposed Revised Study Plan 05/02/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Staff Memo: Telephone conference 5/6/2014 between Commission Staff, Massachusetts Division of Fisheries and Wildlife, and FirstLight Hydro Generating Company 05/07/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Resolution of Dispute on Entrainment Study, and Clarification on Study 3.1.2 09/03/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Hydro Generating Company files 2014 Study Progress Report 07/23/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Response to Stakeholder Requests for Study Modifications and/or New Studies Based on the Study Report and Meeting Summary (5/31/2016) 05/31/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download