FirstLight Study Report No. 3.7.2 Historic Architechtural Resources Survey & National Register Evaluation (Re-Submission) |
01/20/2015 |
Cultural |
Download
|
FirstLight Proposed Modification to Study Plan 3.3.2 Evaluate Upstream and Downstream Passage of Adult American Shad |
12/08/2014 |
Fish and Aquatics |
Download
|
Sediment Management Plan – Report of 2014 Activities for Northfield Mountain Pumped Storage Project (FERC No. 2485) |
12/01/2014 |
Geology and Soils |
Download
|
FirstLight Hydro Generating Company files 2014 Study Progress Report |
07/23/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Cover Letter |
02/24/2015 |
Geology and Soils |
Download
|
FirstLight CoverLetter Posting of First Quarter 2015 Study Reports, Turners Falls Hydroelectric Project (FERC No. 1889) and Northfield Mountain Pumped Storage Project (FERC No. 2485) |
03/31/2015 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Study 3.6.2 Recreation Facilities Inventory and Assessment Addendum Cover Letter |
06/15/2015 |
Recreation and Land Use |
Download
|
FristLight Notification of Updated Study Report Meetings September 29 and 30, 2015 |
07/21/2015 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Transmittal Letter for 2015 Updated Study Report FERC Submission |
09/14/2015 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Sediment Management Plan – Report of 2015 Activities for Northfield Mountain Pumped Storage Project (FERC No. 2485) |
12/01/2015 |
Geology and Soils |
Download
|
Relicensing Study 3.4.2 Effects of Northfield Mountain Pumped Storage Development Related to Land Management Practices and Recreation Use on Terrestral Habitats |
06/30/2015 |
Terrestrial |
Download
|
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace (Appendix A) |
12/01/2015 |
Water Resources |
Download
|
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace (Appendix B Depth) |
12/01/2015 |
Water Resources |
Download
|
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace (Appendix B Velocity) |
12/01/2015 |
Water Resources |
Download
|
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace (Appendix B Water Surface) |
12/01/2015 |
Water Resources |
Download
|
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace |
12/01/2015 |
Water Resources |
Download
|
Relicensing Study 3.1.3 Sediment Management Plan |
09/14/2015 |
Geology and Soils |
Download
|
Relicensing Study 3.3.14 Aquatic Habitat Mapping of Turner Falls Impoundment |
06/30/2015 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.17 Assess the Impacts of Turner Falls Project and Northfield Project Operations on Tributary and Backwater Area Access and Habitat |
06/30/2015 |
Fish and Aquatics |
Download
|
Relicensing Study 3.6.1 Recreation Use/User Contact Survey Study Report |
12/31/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.6.5 Land Use Inventory Study Report |
12/31/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.6.7 Recreation Study at Northfield Mountain, including Assessment of Sufficient of Trails for Shared Use |
06/30/2015 |
Recreation and Land Use |
Download
|
Study 3.6.2 Recreation Facilities Inventory and Assessment Addendum |
06/15/2015 |
Recreation and Land Use |
Download
|
2015 Updated Study Report Presentation |
09/28/2015 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Updated Study Report Summary 3.1.2 Operation Impacts on Existing Erosion and Potential Bank Instability |
09/14/2015 |
Recreation and Land Use |
Download
|
Updated Study Report Summary 3.2.1 Water Quality Monitoring Study |
09/14/2015 |
Water Resources |
Download
|
Updated Study Report Summary 3.3.10 Assess Operational Impacts on Emergence of State-Listed Odonates in the Connecticut River |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.11 Fish Assemblage Assessment |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.12 Evaluate Frequency and Impact of Emergency Water Control Gate Discharge Events and Bypass Flume Events on Shortnose Sturgeon Spawning and Rearing Habitat in the Tailrace and Downstream From Cabot Station |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.13 Impacts of the Turner Falls Project and Northfield Mountain Project on Littoral Zone Fish Habitat and Spawning Habitat |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.15 Assessment of Adult Sea Lamprey Spawning with the Turner Falls Project and Northfield Mountain Project Area |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.16 Habitat Assessment, Surveys, and Modeling of Suitable Habitat for State-Listed Mussel Species in the Connecticut River Below Cabot Station |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.19 Evaluate the Use of an Ultrasound Array to Facilitate Upstream Movement of American Shad at Turner Falls |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station |
09/14/2015 |
Water Resources |
Download
|
Updated Study Report Summary 3.3.20 Ichthyoplankton Entrainment Assessment at the Northfield Mountain Project |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.2 Evaluate Upstream and Downstream Passage of Adult American Shad |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.3 Evaluate Downstream Passage of Juvenile American Shad |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.4 Evaluate Upstream Passage of American Eel at the Turner Falls Project |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.5 Evaluate Downstream Passage of American Eel |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.6 Impact of Project Operations on Shad Spawning, Spawning Habitat and Egg Deposition in the area of Northfield Mountain and Turner Falls Projects |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.7 Fish Entrainment and Turbine Passage Mortality Study |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.8 Computation Fluid Dynamics Modeling in the Vicinity of the Fishway Entrances and Powerhouse Forebays |
09/14/2015 |
Fish and Aquatics |
Download
|
Udated Study Report Summary 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Project Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.4.1 Baseline Study of Terrestrial Wildlilfe and Botanical Resources |
09/14/2015 |
Terrestrial |
Download
|
Updated Study Report Summary 3.5.1 Baseline Inventory of Wetland, Ripariam and Littoral Habitat in the Turners Falls Impoundment and Assessment of Operational Impacts on Special-Status Species |
09/14/2015 |
Wetlands |
Download
|
Updated Study Report Summary 3.6.1 Recreational Use/User Contact Survey |
09/14/2015 |
Recreation and Land Use |
Download
|
Updated Study Report Summary 3.6.5 Land Use Inventory |
09/14/2015 |
Recreation and Land Use |
Download
|
Updated Study Report Summary 3.6.6 Assessment of Effects of Project Operation on the Recreation and Land Use |
09/14/2015 |
Recreation and Land Use |
Download
|
Updated Study Report Summary 3.7.1 Phase IA (Reconnaissance) Archaeological Survey |
09/14/2015 |
Cultural |
Download
|
Updated Study Report Summary 3.7.2 Historical Architechtural Resources Survey & National Register Evaluation |
09/14/2015 |
Cultural |
Download
|