May 22, 2013 Working Group 2: Aquatic Resources, Terrestial, Wetlands, Riparian Resources Meeting Presentation 05/22/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
June 4, 2013 Working Group 2: Aquatic Resources, Terrestial, Wetlands, Riparian Resources Meeting Presentation 06/04/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
June 5, 2013 Working Group 2: Aquatic Resources, Terrestial, Wetlands, Riparian Resources Meeting Presentation 06/05/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
June 11-12, 2013 Working Group 3: Recreation and Land Use Resources, Aesthetic Resources , Cultural Resources Meeting Presentation 06/10/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Proposed Study Plan (PSP) for the relicensing of the Turners Falls Project and Northfield Mountain Project (Volume 1 without Appendices) 04/15/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Response to Stakeholder Requests for Study Modifications and/or New Studies Based on the Study Report and Meeting Summary (1/17/2017) 01/17/2017 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Response to Stakeholder Requests for Study Modifications and/or New Studies Based on the Study Report and Meeting Summary (5/31/2016) 05/31/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Revised Study Plan 08/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Revised Study Plan 3.3.20 Entrainment of American shad ichthyoplankton at the Northfield Mountain Pumped Storage Project 10/16/2014 Fish and Aquatics Download
FirstLight Response to FERC’s March 13, 2018 letter regarding Downstream Juvenile Shad Study No. 3.3.3 (RMC_1994) 04/06/2018 Fish and Aquatics Download
FirstLight Response to FERC’s March 13, 2018 letter regarding Downstream Juvenile Shad Study No. 3.3.3 (RMC_1995) 04/06/2018 Fish and Aquatics Download
Revised Study Plan. Appendix C – NRCS Chemical and Physical Soil Properties 08/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Revised Study Plan. Appendix D – 2013 Full River Reconnaissance Study and Quality Assurance Project Plan 08/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Revised Study Plan. Appendix E – Previous data and information for Adult American shad 08/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Revised Study Plan. Appendix F – Turners Falls Upstream Fish Passage CFD Modeling of Gatehouse Entrance 08/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Revised Study Plan. Appendix G – 2011 Cabot Station Drawdown Juvenile American Shad Stranding Survey 08/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Revised Study Plan. Appendix A – Study Request Letters 08/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Revised Study Plan. Appendix B – Resource Comments/Concerns and Response 08/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Revised Study Plan. Appendix H – Stakeholder Comments on Updated PSP 08/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Scoping proposal for noise study, filed by Warren Ondras 01/31/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comment of Stefanie Krug (2) 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comment of Stefanie Krug 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Study Plan Determination for the Turner Falls Hydroelectric Project and The Northfield Mountain Punmped Storage Project 09/13/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Presentation for Study Report Meeting March 16, 2017 03/16/2017 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Presentation for Study Report Meetings Oct 31, 2016 and Nov 1, 2016 10/31/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Letter from FirstLight pertaining to the causation study (Study No. 3.1.2) 08/12/2014 Geology and Soils Download
FirstLight Study No. 3.3.16 Interim Report - Habitat Assessment, Surveys, and Modeling for State-Listed Mussel Speices in the Connecticut River below Cabot Station 01/29/2015 Fish and Aquatics Download
FirstLight Response to EPA Comments on Northfield Mountain Pumped Storage Project Sediment Management Plan – 2014 Summary of Annual Monitoring 03/31/2015 Geology and Soils Download
Relicensing Study 3.2.1 Water Quality Monitoring Study 03/01/2016 Water Resources Download
Relicensing Study 3.2.2 Hydraulic Study of Turner Falls Impoundment, Bypass Reach and Below Cabot 03/31/2015 Water Resources Download
Relicensing Study 3.3.10 Assess Operational Impacts on Emergence of State-Listed Odonates in the Connecticut River 02/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.11 Fish Assemblage Assessment 03/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.12 Evaluation of Emergency Gate and Bypass Flume Discharges 03/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.18 Impacts of the Turners Falls Canal Drawdown on Fish Migration and Aquatic Organisms Addendum 02/12/2016 Fish and Aquatics Download
Relicensing Study 3.3.18 Impacts of the Turner Falls Canal Drawdown on Fish Migration and Aquatic Organisms 03/31/2015 Fish and Aquatics Download
Revised Study Plan 3.3.19 - Evaluate the Use of an Ultrasound Array to Facilitate Upstream Movement to Turners Falls Dam by Avoiding Cabot Station Tailrace 02/18/2016 Fish and Aquatics Download
Relicensing Study 3.3.20 Ichthyoplankton Entrainment Assessment at the Northfield Mountain Pumped Storage Project 02/12/2016 Fish and Aquatics Download
Relicensing Study 3.3.4 Evaluate Upstream Passage of American Eel at the Turners Falls Project 02/12/2016 Fish and Aquatics Download
Relicensing Study 3.3.4 Evaluate Upstream Passage of American Eel at the Turner Falls Project 03/31/2015 Fish and Aquatics Download
Relicensing Study 3.3.6 Impact of Project Operations on Shad Spawning, Spawning Habitat and Egg Deposition in the area of the Northfield Mountain and Turners Falls Projects 03/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.8 Computational Fluid Dynamics Modeling in the Vicinity of the Fishway Entrances and Powerhouse Forebays 02/01/2016 Fish and Aquatics Download
Relicensing Study 3.5.1 Baseline Inventory of Wetland, Riparian and Littoral Habitat in the Turners Falls Impoundment, and Assessment of Operational Impacts on Special-Status Species 02/12/2016 Wetlands Download
Relicensing Study 3.6.3 Whitewater Boating Evaluation 03/31/2015 Recreation and Land Use Download
Relicensing Study 3.6.4 Assessment of Day Use and Overnight Facilities associated with Non-Motorized Boats 03/31/2015 Recreation and Land Use Download
Relicensing Study 3.7.2 Historic Architectural Resources Survey & National Register Evaluation Study Report Addendum 11/16/2015 Cultural Download
Relicensing Study 3.7.3 Traditional Cultural Properties Study Report 03/31/2015 Cultural Download
April 16, 2013 Turners Fall Instream Flow Study Meeting: Study Process Overview Presentation 04/16/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Relicensing Study 3.4.1 Baseline Study of Terrestrial Wildlife and Botanical Resources 02/04/2016 Terrestrial Download
FirstLight- March 16, 2016 Study Report Meeting 03/14/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
TF and NFM AFLA Volume 2 of 5 (Part 1 of 4) 12/04/2020 Amended Final License Application Download