Relicensing Study 3.3.19 Evaluate the Use of an Ultrasound Array to Facilitate Upstream Movement to Turners Falls Dam by avoiding Cabot Station Tailrace -2018 Study Report |
03/01/2019 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.15 Assessment of Sea Lamprey Spawning within Assessment of Sea Lamprey Spawning within Turners Falls Turners Falls Project Northfield Mountain Project Area Addendum 1 Impact on Sea Lamprey Spawning Nests near Stebbins Island |
05/01/2018 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station Addendum 2 IFIM Study for Mussels in Reach 5 |
05/01/2018 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station Addendum 3 Assessment of Yellow Lampmussels in Reach 3 |
05/01/2018 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station Addendum 4 New Sea Lamprey Weighed Usable Area Curves based on Agency Proposed Habitat Suitability Index Curves |
05/01/2018 |
Fish and Aquatics |
Download
|
FirstLight submits response to Massachusetts Division of Fisheries and Wildlife relative to Mussel Assessment |
05/29/2019 |
Fish and Aquatics |
Download
|
FirstLight submits response to Connecticut River Conservancy (CRC) Comments on 2019 Updated Study Reports 3.3.19, 3.3.9 and 3.7.1 |
06/13/2019 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Northfield Mountain Generation Station CFD Modeling for Fish Exclusion Net Forces Report |
06/01/2019 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.19 - Final 2019 Ultrasound Array Control Study (Updated) |
04/01/2019 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.19 Proposed 2019 Ultrasound Array Control Study |
03/01/2019 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station Addendum 5 Assessment of Sea Lamprey (new spawning HSI curves) and Yellow Lampmussels in Reach 3 |
03/01/2019 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the bypass Reach and below Cabot Station -Addendum 6 Assessment of Sea Lamprey and Yellow Lampmussels in Reach 4 |
04/01/2019 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the bypass Reach and below Cabot Station -Addendum 7 |
09/01/2019 |
Fish and Aquatics |
Download
|
Relicensing Study 3.5.1 Baseline Inventory of Wetland Riparian and Littoral Habitat in the Turners Falls Impoundment and Assessment of Operational Impacts on Special Species Addendum Tiger Beetles |
03/01/2019 |
Wetlands |
Download
|
Relicensing Study 3.3.19 Ultrasound Array and Cabot Station Shad Mortality Study (March 2019) |
03/01/2020 |
Fish and Aquatics |
Download
|
FirstLight cover letter for filing Revised (Jan 2020) Relicensing Study 3.7.1 Phase II MA Report |
02/03/2020 |
Cultural |
Download
|
FirstLight submits request to revise schedule for filing Amended License Application |
02/10/2020 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight cover letter for filing Relicensing Study 3.3.19 Ultrasound Array and Cabot Station Shad Mortality Study (March 2019) |
03/31/2020 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Form Flow 2500) |
03/31/2015 |
Recreation and Land Use |
Download
|
Study Plan for Entrainment of American Shad Ichthyoplankton at the Northfield Mountain Pumped Storage Project. Study # 3.3.20. DRAFT FOR CONSULTATION. |
09/05/2014 |
Fish and Aquatics |
Download
|
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Form Flow 3500) |
03/31/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.5.1 Baseline Inventory of Wetland, Riparian and Littoral Habitat in the Turners Falls Impoundment and Assessment of Operational Impacts on Special Status Species Addendum 2 - Public Version (Attachment) |
04/01/2017 |
Wetlands |
Download
|
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Form Flow 5000) |
03/31/2015 |
Recreation and Land Use |
Download
|
Freshwater Mussel Survey in the Connecticut River for the Turners Falls and Northfield Mountain Hydroelectric Projects prepared by Biodrawversity (2012) |
01/08/2013 |
Fish and Aquatics |
Download
|
Analysis of Erosion in Vicinity of Route 10 Bridge Spanning the Connecticut River prepared by Simons & Associates (2012). |
01/08/2013 |
Geology and Soils |
Download
|
Riverbank Erosion Comparison along the Connecticut River prepared by Simons & Associates (2012) |
01/08/2013 |
Geology and Soils |
Download
|
Aquatic Mesohabitat Assessment and Mapping prepared by FirstLight (2012) |
01/08/2013 |
Fish and Aquatics |
Download
|
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Form Flow 8000) |
03/31/2015 |
Recreation and Land Use |
Download
|
Simons, D.B., Andrew, J.W., Li, R.M., & Alawady, M.A. (1979). Connecticut River Streambank Erosion Study: Massachusetts, New Hampshire, and Vermont. Waltham, MA: US Army Corps of Engineers (USACE). |
01/01/1979 |
Geology and Soils |
Download
|
Northrop, Devine and Tarbell, Inc.. 1991. Connecticut River Riverbank Management Master Plan (Draft). Northeast Utilities Service Company, Inc. |
01/01/1991 |
Geology and Soils |
Download
|
Proposed Study Plan for the Acoustic Evaluation of Juvenile American Shad and Adult American Eel Passage and Entrainment |
11/04/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments from the Appalachian Mountain Club (AMC Riverwide Issues) |
01/30/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Instream Flow Study Scoping Meeting with Fish Agencies |
01/24/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Comments from the Appalachian Mountain Club, headquartered in Boston, Mass., on riverwide issues in the proposed relicensing Connecticut River Facilities. |
01/30/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
New England Flow and American Whitewater's Comments and Study Requests |
01/30/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Field, John. 2011. Detailed Analysis of the 2008 Full River Reconnaissance of the Turners Falls Pool on the Connecticut River: Unpublished report prepared for The Landowners and Concerned Citizens for License Compliance. |
01/01/2011 |
Geology and Soils |
Download
|
Relicensing Study 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station (Appendix E) |
10/01/2016 |
Fish and Aquatics |
Download
|
Comments or Study Request of Ashuelot River Local Advisory Committee |
02/24/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 1 |
02/24/2015 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 2 |
02/24/2015 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 3 |
02/24/2015 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 4 |
02/24/2015 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 5 |
02/24/2015 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 6 |
02/24/2015 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment B-2007 to 2014 Photo Comparison |
02/24/2015 |
Geology and Soils |
Download
|
2014 Initial Study Report Meeting-Call in Number |
09/25/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight Comments and Information Regarding Notice of Study Dispute (4/16/2014) |
04/16/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Comparative Flow Evaluation Form) |
03/31/2015 |
Recreation and Land Use |
Download
|
TF and NFM AFLA Cover letter |
12/04/2020 |
Amended Final License Application |
Download
|
FirstLight cover letter for filing Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the bypass Reach and below Cabot Station -Addendum 7 |
09/30/2019 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|