Licensing Documents

Filter

Document Title Date of Filing Contents Download
TF and NFM AFLA Volume 2 of 5 (Part 2 of 4) 12/04/2020 Amended Final License Application Download
TF and NFM AFLA Volume 2 of 5 (Part 3 of 4) 12/04/2020 Amended Final License Application Download
TF and NFM AFLA Volume 2 of 5 (Part 4 of 4) 12/04/2020 Amended Final License Application Download
TF AFLA Volume 1 of 5 12/04/2020 Amended Final License Application Download
2014 Initial Study Report. Transmittal Letter 09/15/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Revised Appendix C for Completed Study Report for Study No. 3.7.2 (Transmittal Letter) 07/22/2015 Cultural Download
March 16, 2016, Study Meeting Summary. 03/31/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Filing of Study Reports, Proposed Schedule, and Process Plan for Remaining Study Reports 03/01/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Updated Proposed Study Plan (PSP) for the relicensing of the Turners Falls Project and Northfield Mountain Project 06/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
The Western Massachusetts Climbers’ Coalition Scoping Comments for the Northfield Mountain Pumped Storage Project 02/20/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight - March 8, 2016 Study 3.3.2 Adult Shad Telemetry Data Analysis Meeting. Presentation. 03/08/2016 Fish and Aquatics Download
FirstLight Submittal of Modified Revised Study Plans, Study No.3.5.1(Baseline Inventory of Wetland, Riparian, and Littoral Habitat, and Assessment of Operational Impacts on Special-Status Species) and Study No.3.6.3 (Whitewater Boating Evaluation) 01/13/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download