Licensing Documents
Filter
Document Title | Date of Filing | Contents | Download |
---|---|---|---|
TF and NFM AFLA Volume 2 of 5 (Part 2 of 4) | 12/04/2020 | Amended Final License Application | Download |
TF and NFM AFLA Volume 2 of 5 (Part 3 of 4) | 12/04/2020 | Amended Final License Application | Download |
TF and NFM AFLA Volume 2 of 5 (Part 4 of 4) | 12/04/2020 | Amended Final License Application | Download |
TF AFLA Volume 1 of 5 | 12/04/2020 | Amended Final License Application | Download |
2014 Initial Study Report. Transmittal Letter | 09/15/2014 | FERC Scoping/Integrated Licensing Process (ILP) Process | Download |
Revised Appendix C for Completed Study Report for Study No. 3.7.2 (Transmittal Letter) | 07/22/2015 | Cultural | Download |
March 16, 2016, Study Meeting Summary. | 03/31/2016 | FERC Scoping/Integrated Licensing Process (ILP) Process | Download |
Filing of Study Reports, Proposed Schedule, and Process Plan for Remaining Study Reports | 03/01/2016 | FERC Scoping/Integrated Licensing Process (ILP) Process | Download |
Updated Proposed Study Plan (PSP) for the relicensing of the Turners Falls Project and Northfield Mountain Project | 06/28/2013 | FERC Scoping/Integrated Licensing Process (ILP) Process | Download |
The Western Massachusetts Climbers’ Coalition Scoping Comments for the Northfield Mountain Pumped Storage Project | 02/20/2013 | FERC Scoping/Integrated Licensing Process (ILP) Process | Download |
FirstLight - March 8, 2016 Study 3.3.2 Adult Shad Telemetry Data Analysis Meeting. Presentation. | 03/08/2016 | Fish and Aquatics | Download |
FirstLight Submittal of Modified Revised Study Plans, Study No.3.5.1(Baseline Inventory of Wetland, Riparian, and Littoral Habitat, and Assessment of Operational Impacts on Special-Status Species) and Study No.3.6.3 (Whitewater Boating Evaluation) | 01/13/2014 | FERC Scoping/Integrated Licensing Process (ILP) Process | Download |