Licensing Documents

Filter

Document Title Date of Filing Contents Download
US Army Corps of Engineers (USACE). 1991. General investigation study - Connecticut River streambank erosion. Waltham, MA: USACE, New England Division. 01/01/1991 Geology and Soils Download
Field Geology Services. (2007). Fluvial geomorphology study of the Turners Falls Pool on the Connecticut River between Turners Falls, MA and Vernon, VT. Prepared for Northfield Mountain Pumped Storage Project. Farmington, ME: Field Geology Services. 01/01/2007 Geology and Soils Download
FirstLight Discuss Instream Flow Study (FirstLight Study No 3.3.1) Meeting Summary (12/2/2016) 12/02/2016 Fish and Aquatics Download
Letter FirstLight filing Phase IB and Phase II Reports for Archaeological Investigations in Vermont, New Hampshire, and Massachusetts as part of Relicensing Study No. 3.7.1 12/14/2018 Cultural Download
FirstLight submits response to comments on various Study Report Addendums that were filed between April 3, 2017 and May 1, 2018 12/21/2018 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Transmittal Letter FERC filing Study Reports 3.3.10 and 3.3.20 12/28/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Form Flow 13000) 03/31/2015 Recreation and Land Use Download
FERC Filing: Submitted on behalf of the Landowners and Concerned Citizens for License Compliance. Comments on the draft QAPP for the 2013 Full River Reconnaissance 02/04/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Modification to Integrated Licensing Process Schedule 12/21/2012 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Scoping Document 1 for TransCanada Hydro Northeast Inc. (Wilder Project, Bellows Falls, Vernon Project) and FirstLight (Turner Falls, Northfield Mountain) 12/21/2012 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Filing: REFILE of the Request of Massachusetts Division of Fisheries and Wildlife under P-1889, et al. 02/11/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Relicensing Comments by Karl Meyer, Greenfield, MA 02/25/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Transcript of 1/30/13 scoping meeting held in Turners Falls, Massachusetts for the Vernon, Northfield Mountain, and Turners Falls Hydroelectric Projects re TransCanada Hydro Northeast, Inc and FirstLight Hydro Generating Company 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Transcript of 1/31/13 scoping meeting held in Turners Falls, Massachusetts for the Northfield Mountain and Turners Falls Hydroelectric Projects re FirstLight Hydro Generating Company 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Transcript of 1/31/13 scoping meeting held in Turners Falls, Massachusetts for the Connecticut River Projects' Cumulative Effects re TransCanada Hydro Northeast, Inc and FirstLight Hydro Generating Company 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments and Study Requests in Response to the Notice of Intent to File License Application, Filing of Pre-Application Document (PAD), Commencement of Pre-Filing Process and Scoping and Request for Comments on the PAD and Scoping Document 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Appalachian Mountain Club, Vermont River Conservancy, and Friends 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Supplemental/Additional Information Response to Data Request of Town of Montague, MA, Native American Cultural Landscape District Properties in Turners Falls Management Plan 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Letter to FERC from Connecticut River Residents concerning Northfield Mountain and Turners Falls Dam licensing issues 02/25/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments on the Preliminary Application Document, Scoping Document 1, and Study Requests submitted by the Town of Gill, MA Select Board and Conservation Commission 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments on the Preliminary Application Document, Scoping Document 1, and Study Requests submitted by the Landowners and Concerned Citizens for License Compliance 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
SD1 Comments, PAD Comments, and Study Requests of the Massachusetts Division of Fisheries and Wildlife (MADFW) 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments on the Preliminary Application Document, Scoping Document 1, and Study Requests submitted by Franklin Regional Council of Governments 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments on PAD, SD1 and Study Requests from Franklin Conservation District 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Supplemental Information of Vivien Venskowski of The River Residents Association. Connecticut River concerns on Extreme Water Level Fluctuations and Campsite License Terms 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
NMFS Study Requests and Comments regarding PAD 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments on Scoping Document 1 for the Wilder, Bellows Falls, Vernon and Turners Falls hydroelectric projects, and the Northfield Mountain Pumped Storage Project from Northeast Climate Science Center 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comment and Study Requests of New England FLOW, American Whitewater and Appalachian Mountain Club 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments from Leena Newcomb of River Residents Association regarding the Turner Falls Project and Northfield Mountain Projects 01/31/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments of Thomas Shearer et al re the Northfield Mountain Pumped Storage Project 01/31/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments of Chris Curtis re the Turners Falls Project Article from The Recorder: "Lower water hampers use of Connecticut River, Jeopardizes potential river rescue response." 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Photos from Anonymous River Resident regarding the Turner Falls and Northfield Projects 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments from Leena Newcomb of the River Residents Association re the Turners Falls Project 02/25/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Letter to FirstLight Hydro Generating Company providing Identified PAD Deficiencies, Additional Information Requests, and Study Requests 03/01/2013 Pre-Application Document Download
Comments and Study Request submitted by The Nolumbeka Project, Inc, et al 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Stefanie Krug Study Plan Request for the Northfield Mountain Trail Assessment under P-2485: Mountain Bike Trails Access 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments on the PAD, Scoping Document 1, and Study Requests of Connecticut River Watershed Council, Inc. 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments on Connecticut River Massachusetts water withdrawal by Massachusetts Farm Bureau Federation ( A. Richard Bonanno, Ph.D.) 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comment of Howard Fairman re environmental impacts on migratory fish in relicensing of Northfield Mountain Pumped Storage. 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
The Nature Conservancy Comments on Scoping Document 1 and Study Requests for the Wilder, Bellows Falls (FERC No. 1855-045), Vernon (FERC No. 1904-073), and Turners Falls (FERC No. 1889-081) hydroelectric projects, and the Northfield Mountain Pumped Storag 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
New Hampshire Department of Environmental Services Comments on Pre-Application Documents and Study Requests for 5 Hydroelectric Projects on the Connecticut River 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
The Vermont Agency of Natural Resources (Agency) submits comments and requests for studies. 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Connecticut River Joint Commissions Comments on Integrated Licensing Process and Study Request for FERC project numbers P-1904 (Vernon), P-1855 (Bellows Falls), P-1892 (Wilder), 1889 (Turners Falls), No. 2485 (Northfield Mountain). 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Study Requests of Deerfield River Trout Unlimited 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
New England Farmers Union review of Pre-Application Documents 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments of Four Star Farms, Inc. re the Northfield Mountain Relicensing 02/20/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments from Peter W. Conway of River Residents Association re regarding the Turner Falls Project and Northfield Mountain Projects 02/16/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments and Study Requests of Kurt Heidinger for Biocitizen School of Environmental Philosophy and Practice 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Comments of Joanne McGee regarding Canoe/Kayaks access on Connecticut River 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
ILP Comments or Study Request of U.S. Fish and Wildlife Service/New England Field Office 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download