Licensing Documents

Filter

Document Title Date of Filing Contents Download
Relicensing Comments by Karl Meyer, Greenfield, MA 02/25/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Filing: REFILE of the Request of Massachusetts Division of Fisheries and Wildlife under P-1889, et al. 02/11/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Scoping Document 1 for TransCanada Hydro Northeast Inc. (Wilder Project, Bellows Falls, Vernon Project) and FirstLight (Turner Falls, Northfield Mountain) 12/21/2012 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Modification to Integrated Licensing Process Schedule 12/21/2012 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FERC Filing: Submitted on behalf of the Landowners and Concerned Citizens for License Compliance. Comments on the draft QAPP for the 2013 Full River Reconnaissance 02/04/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Form Flow 13000) 03/31/2015 Recreation and Land Use Download
FirstLight Transmittal Letter FERC filing Study Reports 3.3.10 and 3.3.20 12/28/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight submits response to comments on various Study Report Addendums that were filed between April 3, 2017 and May 1, 2018 12/21/2018 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Letter FirstLight filing Phase IB and Phase II Reports for Archaeological Investigations in Vermont, New Hampshire, and Massachusetts as part of Relicensing Study No. 3.7.1 12/14/2018 Cultural Download
FirstLight Discuss Instream Flow Study (FirstLight Study No 3.3.1) Meeting Summary (12/2/2016) 12/02/2016 Fish and Aquatics Download
Field Geology Services. (2007). Fluvial geomorphology study of the Turners Falls Pool on the Connecticut River between Turners Falls, MA and Vernon, VT. Prepared for Northfield Mountain Pumped Storage Project. Farmington, ME: Field Geology Services. 01/01/2007 Geology and Soils Download
US Army Corps of Engineers (USACE). 1991. General investigation study - Connecticut River streambank erosion. Waltham, MA: USACE, New England Division. 01/01/1991 Geology and Soils Download
FirstLight Notification Letter providing revised FERC filing date for the Relicensing Study Report No. 3.1.2 Northfield Mountain/Turners Falls Operations Impacts on Existing Erosion and Potential Bank Instability Addendum 11/18/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight submits requested survey data relating to Relicensing Study No. 3.6.3 Whitewater Boating Evaluation and Study No. 3.6.7 Recreation Study at Northfield Mountain, Including Assessment of Sufficiency of Trails For Shared Use 11/10/2015 Recreation and Land Use Download
FirstLight cover letter for filing Relicensing Study 3.7.1 Phase II MA Report (Evaluations of 17 Archaeological Sites) 10/18/2019 Cultural Download
FirstLight 2015 Updated Study Meeting Summary, held on 9/29/15-9/30/15 10/14/2015 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight submits fifth Monthly Progress Report for Massachusetts Phase II Archaeological Report 10/04/2019 Cultural Download
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Form Flow 10000) 03/31/2015 Recreation and Land Use Download
FirstLight submits fourth Monthly Progress Report for Massachusetts Phase II Archaeological Report 08/30/2019 Cultural Download
FirstLight cover letter filing 2017 Relicensing Study 3.3.1 IFIM for Reach 5 Mussels 08/23/2017 Fish and Aquatics Download
FirstLight submits third Monthly Progress Report for Massachusetts Phase II Archaeological Report 08/05/2019 Cultural Download
FirstLight submits Request for Extension of Time to Complete Archaeological Surveys, Relicensing Study Nos 3.7.1 and 3.7.3 07/17/2018 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Cover Letter FirstLight files Response to FERC’s Additional Information Request dated June 21, 2018 regarding Phase IB Archaeological Surveys 07/16/2018 Cultural Download
FirstLight submits second Monthly Progress Report for Massachusetts Phase II Archaeological Report 07/05/2019 Cultural Download
FirstLight CoverLetter Posting of Second Quarter 2015 Study Reports, Turners Falls Hydroelectric Project (FERC No. 1889) and Northfield Mountain Pumped Storage Project (FERC No. 2485) 06/30/2015 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight's response to the USFWS letter requesting the report titled Juvenile American Shad Assessment in the Connecticut River – Fall 2017 06/28/2018 Fish and Aquatics Download
FirstLight request waiver of the requirement to conduct Phase IB Archaeological Surveys on lands owned by GRH and within the FERC project boundary 06/20/2018 Cultural Download
FirstLight submits first Monthly Progress Report for Massachusetts Phase II Archaeological Report 06/06/2019 Cultural Download
FirstLight cover letter for filing Northfield Mountain Generation Station CFD Modeling for Fish Exclusion Net Forces Report 06/03/2019 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Cover letter FirstLight files request to FERC regarding Phase IB Archaeological Surveys 05/31/2018 Cultural Download
FirstLight files Response to Stakeholder Requests for Study Modifications and/or New Studies Based on the Study Report 05/30/2017 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight files status of additional data required for Relicensing Studies No. 3.3.1 and 3.3.15 by FERC's February 17, 2017 Study Plan Determination Letter 05/11/2017 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight submits notification letter and attachments to FERC of Additional Proposed Study- Barrier Net Assessment 05/10/2018 Fish and Aquatics Download
FirstLight submits request to FERC for time extension regarding the Phase II Archaeological Report 05/06/2019 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Cover Letter FirstLight files outstanding Relicensing Study Addendums for Study 3.3.1 and 3.3.15 05/01/2018 Fish and Aquatics Download
FirstLight Cover Letter for filing 2017 Study Report 3.3.2, 3.3.3 Addendums and 3.3.1 Errata 05/01/2017 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight cover letter filing Final 2019 Ultrasound Array Control Study (Updated) 04/30/2019 Fish and Aquatics Download
Responses to Connecticut River Watershed Council comment letter dated March 25, 2016 and Mr. Karl Meyer comment letter dated March 27, 2016 04/22/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight cover letter for FERC filing Relicensing Study 3.3.1 Addendum 6 04/19/2019 Fish and Aquatics Download
FirstLight Submittal of RMC 1994 Report 04/19/2018 Fish and Aquatics Download
FirstLight Study Meeting Summary and presentation (March 29, 2019) 04/15/2019 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Response to Stakeholder Comments on Study Plan 3.3.19 04/13/2018 Fish and Aquatics Download
FirstLight proposed schedule for Amended License Application 04/12/2019 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Comments and Information Regarding Notice of Study Dispute (4/7/2014) 04/07/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Response to FERC’s March 13, 2018 letter regarding Downstream Juvenile Shad Study No. 3.3.3 04/06/2018 Fish and Aquatics Download
FirstLight Transmittal Letter FERC filing 2017 Study Reports 3.1.2 (re-issue), 3.3.1 Addendum 1, 3.5.1 Addendum 2 04/03/2017 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Study Report Meeting Summary (March 16, 2017) 03/31/2017 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight cover letter for filing 3/29/19 meeting agenda and Relicensing Study No. 3.3.19 Ultrasound Array 2018 report and the Proposed 2019 ultrasound array control study plan and the Relicensing Study No. 3.7.1 Phase IB Archaeological Survey for MA 03/12/2019 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight letter to FERC notifying study reports 3.3.13 and 3.3.15 uploaded to website 06/30/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight cover letter filing Relicensing Study 3.3.1 Addendum 5 and Relicensing Study 3.5.1 Addendum 3 03/01/2019 Wetlands Download