Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station - IFIM for Mussels 2017 |
08/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station (Appendix E) |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.20 Ichthyoplankton Entrainment Assessment at Northfield Mountain Project -Second year |
12/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.20 Ichthyoplankton Entrainment Assessment at the Northfield Mountain Pumped Storage Project |
02/12/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.2 Evaluate Upstream and Downstream Passage Addendum 1 |
05/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.2. Evaluate Upstream and Downstream Passage of Adult American Shad Study Report |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.3 Evaluate Downstream Passage of Juvenile American Shad Interim Study Report |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.3 Evaluate Downstream Passage of Juvenile American Shad Interim Study Report |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.3 Evaluate Downstream Pass Evaluate Downstream Pass Evaluate Downstream Passage Addendum 1 |
05/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.4 Evaluate Upstream Passage of American Eel at the Turner Falls Project |
03/31/2015 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.4 Evaluate Upstream Passage of American Eel at the Turners Falls Project |
02/12/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.5 Evaluate Downstream Passage of American Eel |
03/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.6 Impact of Project Operations on Shad Spawning, Spawning Habitat and Egg Deposition in the area of the Northfield Mountain and Turners Falls Projects |
03/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.6 Impact of Project Operations on Shad Spawning, Spawning Habitat and Egg Deposition in the area of the Northfield Mountain and Turners Falls Projects Addendum |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.7 Fish Entrainment and Turbine Passage Mortality Study |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.8 Computational Fluid Dynamics Modeling in the Vicinity of the Fishway Entrances and Powerhouse Forebays |
02/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.8 Computational Fluid Dynamics Modeling in the Vicinity of the Fishway Entrances and Powerhouse Forebays Addendum |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace |
12/01/2015 |
Water Resources |
Download
|
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace (Appendix A) |
12/01/2015 |
Water Resources |
Download
|
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace (Appendix B Depth) |
12/01/2015 |
Water Resources |
Download
|
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace (Appendix B Velocity) |
12/01/2015 |
Water Resources |
Download
|
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace (Appendix B Water Surface) |
12/01/2015 |
Water Resources |
Download
|
Relicensing Study 3.4.1 Baseline Study of Terrestrial Wildlife and Botanical Resources |
02/04/2016 |
Terrestrial |
Download
|
Relicensing Study 3.4.2 Effects of Northfield Mountain Pumped Storage Development Related to Land Management Practices and Recreation Use on Terrestral Habitats |
06/30/2015 |
Terrestrial |
Download
|
Relicensing Study 3.5.1 Baseline Inventory of Wetland Riparian and Littoral Habitat in the Turners Falls Impoundment and Assessment of Operational Impacts on Special Species Addendum Tiger Beetles |
03/01/2019 |
Wetlands |
Download
|
Relicensing Study 3.5.1 Baseline Inventory of Wetland, Riparian and Littoral Habitat in the Turners Falls Impoundment, and Assessment of Operational Impacts on Special-Status Species |
02/12/2016 |
Wetlands |
Download
|
Relicensing Study 3.5.1 Baseline Inventory of Wetland, Riparian and Littoral Habitat in the Turners Falls Impoundment and Assessment of Operational Impacts on Special Status Species Addendum 2 - Public Version |
04/01/2017 |
Wetlands |
Download
|
Relicensing Study 3.5.1 Baseline Inventory of Wetland, Riparian and Littoral Habitat in the Turners Falls Impoundment and Assessment of Operational Impacts on Special Status Species Addendum 2 - Public Version (Attachment) |
04/01/2017 |
Wetlands |
Download
|
Relicensing Study 3.5.1 Baseline Inventory of Wetland, Riparian and Littoral Habitat in the Turners Falls Impoundment and Assessment of Operational Impacts on Special Status Species Addendum - Public Version |
10/01/2016 |
Wetlands |
Download
|
Relicensing Study 3.6.1 Recreation Use/User Contact Survey Study Report |
12/31/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.6.3 Whitewater Boating Evaluation |
03/31/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Comparative Flow Evaluation Form) |
03/31/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Form Flow 10000) |
03/31/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Form Flow 13000) |
03/31/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Form Flow 2500) |
03/31/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Form Flow 3500) |
03/31/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Form Flow 5000) |
03/31/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.6.3 Whitewater Boating Evaluation (Form Flow 8000) |
03/31/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.6.4 Assessment of Day Use and Overnight Facilities associated with Non-Motorized Boats |
03/31/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.6.5 Land Use Inventory Study Report |
12/31/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.6.6 Assessment of Effects of Project Operation on Recreation and Land Use |
10/01/2016 |
Recreation and Land Use |
Download
|
Relicensing Study 3.6.7 Recreation Study at Northfield Mountain, including Assessment of Sufficient of Trails for Shared Use |
06/30/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.7.2 Historic Architectural Resources Survey & National Register Evaluation Study Report Addendum |
11/16/2015 |
Cultural |
Download
|
Relicensing Study 3.7.3 Traditional Cultural Properties Study Report |
03/31/2015 |
Cultural |
Download
|
Relicensing Study 3.8.1 Evaluate the Impact of Current and Potential Future Modes of Operations on Flow, Water Elevation and Hydropower Generation |
03/01/2017 |
Operations |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D1) |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D2) |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D3) |
04/01/2017 |
Fish and Aquatics |
Download
|