Licensing Documents

Filter

Document Title Date of Filing Contents Download
Notification of Intent (NOI) of Firstlight Hydro Generation Company to File an Application for A New License For The Turners Falls Hydroelectric Project (No. 1889) and the Northfield Mountain Pumped Storage Project (No. 2485) 10/30/2012 Notice of Intent Download
Notification of Study Report Meeting, March 16, 2016 02/12/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Photos from Anonymous River Resident regarding the Turner Falls and Northfield Projects 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Pre-Application Document (PAD) For The Turners Falls Hydroelectric Project (No. 1889) and the Northfield Mountain Pumped Storage Project (No. 2485) 10/30/2012 Pre-Application Document Download
Presentation for Study Report Meeting March 16, 2017 03/16/2017 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Presentation for Study Report Meetings Oct 31, 2016 and Nov 1, 2016 10/31/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Proposed Study Plan for the Acoustic Evaluation of Juvenile American Shad and Adult American Eel Passage and Entrainment 11/04/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Proposed Study Plan (PSP) for the relicensing of the Turners Falls Project and Northfield Mountain Project (Volume 1 without Appendices) 04/15/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Proposed Study Plan (PSP) for the relicensing of the Turners Falls Project and Northfield Mountain Project (Volume 2 Appendices B-G) 04/15/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Proposed Study Plan (PSP) for the relicensing of the Turners Falls Project and Northfield Mountain Project (Volume 2 Appendix A) 04/15/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Relicensing Comments by Karl Meyer, Greenfield, MA 02/25/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume I (2016) 09/01/2016 Geology and Soils Download
Relicensing Study 3.1.2 Northfield Mountain/Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report, Volume I (2016) 10/01/2016 Geology and Soils Download
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume I (2017) 04/01/2017 Geology and Soils Download
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume II (2016) 09/01/2016 Geology and Soils Download
Relicensing Study 3.1.2 Northfield Mountain/Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report, Volume II (2016) 10/01/2016 Geology and Soils Download
Relicensing Study 3.1.2 Northfield Mountain/Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report, Volume III (2016) 10/01/2016 Geology and Soils Download
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume III (Re-Issue 2017) 04/01/2017 Geology and Soils Download
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume III (Re-Issue 2017) Appendix J-II 04/01/2017 Geology and Soils Download
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume II (Re-Issue 2017) 04/01/2017 Geology and Soils Download
Relicensing Study 3.1.3 Northfield Mountain Pumped Storage Project Sediment Management Plan 10/01/2016 Geology and Soils Download
Relicensing Study 3.1.3 Sediment Management Plan 09/14/2015 Geology and Soils Download
Relicensing Study 3.2.1 Water Quality Monitoring Study 03/01/2016 Water Resources Download
Relicensing Study 3.2.2 Hydraulic Study Addendum 02/04/2016 Water Resources Download
Relicensing Study 3.2.2 Hydraulic Study of Turner Falls Impoundment, Bypass Reach and Below Cabot 03/31/2015 Water Resources Download
Relicensing Study 3.3.10 Assess Operational Impacts on Emergence of State-Listed Odonates in the Connecticut River 02/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.10 Assess Operational Impacts on Emergence of State-Listed Odonates in the Connecticut River 2014-2016 Study Report 12/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.11 Fish Assemblage Assessment 03/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.12 Evaluation of Emergency Gate and Bypass Flume Discharges 03/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.13 Impacts of the Turners Falls Project and Northfield Mountain Project on Littoral Zone Fish Habitat and Spawning Habitat Study Report 06/30/2016 Fish and Aquatics Download
Relicensing Study 3.3.13 Impacts of the Turners Falls Project and Northfield Mountain Project on Littoral Zone Fish Habitat and Spawning Habitat Study Report (same report as posted 6/30/2016) 10/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.14 Aquatic Habitat Mapping of Turner Falls Impoundment 06/30/2015 Fish and Aquatics Download
Relicensing Study 3.3.15 Assessment of Adult Sea Lamprey Spawning within the Turners Falls Project and Northfield Mountain Project Area 06/30/2016 Fish and Aquatics Download
Relicensing Study 3.3.15 Assessment of Adult Sea Lamprey Spawning within the Turners Falls Project and Northfield Mountain Project Area (same report as posted 6/30/16) 10/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.15 Assessment of Sea Lamprey Spawning within Assessment of Sea Lamprey Spawning within Turners Falls Turners Falls Project Northfield Mountain Project Area Addendum 1 Impact on Sea Lamprey Spawning Nests near Stebbins Island 05/01/2018 Fish and Aquatics Download
Relicensing Study 3.3.16 Habitat Suitability Criteria for State-listed Mussel Species in the Connecticut River below Cabot Station Study Report 10/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.17 Assess the Impacts of Turner Falls Project and Northfield Project Operations on Tributary and Backwater Area Access and Habitat 06/30/2015 Fish and Aquatics Download
Relicensing Study 3.3.18 Impacts of the Turner Falls Canal Drawdown on Fish Migration and Aquatic Organisms 03/31/2015 Fish and Aquatics Download
Relicensing Study 3.3.18 Impacts of the Turners Falls Canal Drawdown on Fish Migration and Aquatic Organisms Addendum 02/12/2016 Fish and Aquatics Download
Relicensing Study 3.3.19 Evaluate the Use of an Ultrasound Array to Facilitate Upstream Movement to Turners Falls Dam by avoiding Cabot Station Tailrace -2018 Study Report 03/01/2019 Fish and Aquatics Download
Relicensing Study 3.3.19 Evaluate the use of Ultrasound Array to Facilitate Upstream Movement to Turners Falls Dam by Avoiding Cabot Station Tailrace 03/01/2017 Fish and Aquatics Download
Relicensing Study 3.3.19 - Final 2019 Ultrasound Array Control Study (Updated) 04/01/2019 Fish and Aquatics Download
Relicensing Study 3.3.19 Proposed 2019 Ultrasound Array Control Study 03/01/2019 Fish and Aquatics Download
Relicensing Study 3.3.19 Ultrasound Array and Cabot Station Shad Mortality Study (March 2019) 03/01/2020 Fish and Aquatics Download
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station Addendum 2 IFIM Study for Mussels in Reach 5 05/01/2018 Fish and Aquatics Download
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station Addendum 3 Assessment of Yellow Lampmussels in Reach 3 05/01/2018 Fish and Aquatics Download
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station Addendum 4 New Sea Lamprey Weighed Usable Area Curves based on Agency Proposed Habitat Suitability Index Curves 05/01/2018 Fish and Aquatics Download
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station Addendum 5 Assessment of Sea Lamprey (new spawning HSI curves) and Yellow Lampmussels in Reach 3 03/01/2019 Fish and Aquatics Download
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the bypass Reach and below Cabot Station -Addendum 6 Assessment of Sea Lamprey and Yellow Lampmussels in Reach 4 04/01/2019 Fish and Aquatics Download
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the bypass Reach and below Cabot Station -Addendum 7 09/01/2019 Fish and Aquatics Download