Notification of Intent (NOI) of Firstlight Hydro Generation Company to File an Application for A New License For The Turners Falls Hydroelectric Project (No. 1889) and the Northfield Mountain Pumped Storage Project (No. 2485) |
10/30/2012 |
Notice of Intent |
Download
|
Notification of Study Report Meeting, March 16, 2016 |
02/12/2016 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Photos from Anonymous River Resident regarding the Turner Falls and Northfield Projects |
02/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Pre-Application Document (PAD) For The Turners Falls Hydroelectric Project (No. 1889) and the Northfield Mountain Pumped Storage Project (No. 2485) |
10/30/2012 |
Pre-Application Document |
Download
|
Presentation for Study Report Meeting March 16, 2017 |
03/16/2017 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Presentation for Study Report Meetings Oct 31, 2016 and Nov 1, 2016 |
10/31/2016 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Proposed Study Plan for the Acoustic Evaluation of Juvenile American Shad and Adult American Eel Passage and Entrainment |
11/04/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Proposed Study Plan (PSP) for the relicensing of the Turners Falls Project and Northfield Mountain Project (Volume 1 without Appendices) |
04/15/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Proposed Study Plan (PSP) for the relicensing of the Turners Falls Project and Northfield Mountain Project (Volume 2 Appendices B-G) |
04/15/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Proposed Study Plan (PSP) for the relicensing of the Turners Falls Project and Northfield Mountain Project (Volume 2 Appendix A) |
04/15/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Comments by Karl Meyer, Greenfield, MA |
02/25/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume I (2016) |
09/01/2016 |
Geology and Soils |
Download
|
Relicensing Study 3.1.2 Northfield Mountain/Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report, Volume I (2016) |
10/01/2016 |
Geology and Soils |
Download
|
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume I (2017) |
04/01/2017 |
Geology and Soils |
Download
|
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume II (2016) |
09/01/2016 |
Geology and Soils |
Download
|
Relicensing Study 3.1.2 Northfield Mountain/Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report, Volume II (2016) |
10/01/2016 |
Geology and Soils |
Download
|
Relicensing Study 3.1.2 Northfield Mountain/Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report, Volume III (2016) |
10/01/2016 |
Geology and Soils |
Download
|
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume III (Re-Issue 2017) |
04/01/2017 |
Geology and Soils |
Download
|
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume III (Re-Issue 2017) Appendix J-II |
04/01/2017 |
Geology and Soils |
Download
|
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume II (Re-Issue 2017) |
04/01/2017 |
Geology and Soils |
Download
|
Relicensing Study 3.1.3 Northfield Mountain Pumped Storage Project Sediment Management Plan |
10/01/2016 |
Geology and Soils |
Download
|
Relicensing Study 3.1.3 Sediment Management Plan |
09/14/2015 |
Geology and Soils |
Download
|
Relicensing Study 3.2.1 Water Quality Monitoring Study |
03/01/2016 |
Water Resources |
Download
|
Relicensing Study 3.2.2 Hydraulic Study Addendum |
02/04/2016 |
Water Resources |
Download
|
Relicensing Study 3.2.2 Hydraulic Study of Turner Falls Impoundment, Bypass Reach and Below Cabot |
03/31/2015 |
Water Resources |
Download
|
Relicensing Study 3.3.10 Assess Operational Impacts on Emergence of State-Listed Odonates in the Connecticut River |
02/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.10 Assess Operational Impacts on Emergence of State-Listed Odonates in the Connecticut River 2014-2016 Study Report |
12/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.11 Fish Assemblage Assessment |
03/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.12 Evaluation of Emergency Gate and Bypass Flume Discharges |
03/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.13 Impacts of the Turners Falls Project and Northfield Mountain Project on Littoral Zone Fish Habitat and Spawning Habitat Study Report |
06/30/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.13 Impacts of the Turners Falls Project and Northfield Mountain Project on Littoral Zone Fish Habitat and Spawning Habitat Study Report (same report as posted 6/30/2016) |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.14 Aquatic Habitat Mapping of Turner Falls Impoundment |
06/30/2015 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.15 Assessment of Adult Sea Lamprey Spawning within the Turners Falls Project and Northfield Mountain Project Area |
06/30/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.15 Assessment of Adult Sea Lamprey Spawning within the Turners Falls Project and Northfield Mountain Project Area (same report as posted 6/30/16) |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.15 Assessment of Sea Lamprey Spawning within Assessment of Sea Lamprey Spawning within Turners Falls Turners Falls Project Northfield Mountain Project Area Addendum 1 Impact on Sea Lamprey Spawning Nests near Stebbins Island |
05/01/2018 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.16 Habitat Suitability Criteria for State-listed Mussel Species in the Connecticut River below Cabot Station Study Report |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.17 Assess the Impacts of Turner Falls Project and Northfield Project Operations on Tributary and Backwater Area Access and Habitat |
06/30/2015 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.18 Impacts of the Turner Falls Canal Drawdown on Fish Migration and Aquatic Organisms |
03/31/2015 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.18 Impacts of the Turners Falls Canal Drawdown on Fish Migration and Aquatic Organisms Addendum |
02/12/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.19 Evaluate the Use of an Ultrasound Array to Facilitate Upstream Movement to Turners Falls Dam by avoiding Cabot Station Tailrace -2018 Study Report |
03/01/2019 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.19 Evaluate the use of Ultrasound Array to Facilitate Upstream Movement to Turners Falls Dam by Avoiding Cabot Station Tailrace |
03/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.19 - Final 2019 Ultrasound Array Control Study (Updated) |
04/01/2019 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.19 Proposed 2019 Ultrasound Array Control Study |
03/01/2019 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.19 Ultrasound Array and Cabot Station Shad Mortality Study (March 2019) |
03/01/2020 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station Addendum 2 IFIM Study for Mussels in Reach 5 |
05/01/2018 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station Addendum 3 Assessment of Yellow Lampmussels in Reach 3 |
05/01/2018 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station Addendum 4 New Sea Lamprey Weighed Usable Area Curves based on Agency Proposed Habitat Suitability Index Curves |
05/01/2018 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station Addendum 5 Assessment of Sea Lamprey (new spawning HSI curves) and Yellow Lampmussels in Reach 3 |
03/01/2019 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the bypass Reach and below Cabot Station -Addendum 6 Assessment of Sea Lamprey and Yellow Lampmussels in Reach 4 |
04/01/2019 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the bypass Reach and below Cabot Station -Addendum 7 |
09/01/2019 |
Fish and Aquatics |
Download
|