Licensing Documents

Filter

Document Title Date of Filing Contents Download
Relicensing Study 3.3.15 Assessment of Adult Sea Lamprey Spawning within the Turners Falls Project and Northfield Mountain Project Area (same report as posted 6/30/16) 10/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.13 Impacts of the Turners Falls Project and Northfield Mountain Project on Littoral Zone Fish Habitat and Spawning Habitat Study Report 06/30/2016 Fish and Aquatics Download
Relicensing Study 3.3.13 Impacts of the Turners Falls Project and Northfield Mountain Project on Littoral Zone Fish Habitat and Spawning Habitat Study Report (same report as posted 6/30/2016) 10/01/2016 Fish and Aquatics Download
Relicensing Study 3.1.3 Northfield Mountain Pumped Storage Project Sediment Management Plan 10/01/2016 Geology and Soils Download
Relicensing Study 3.1.2 Northfield Mountain/Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report, Volume I (2016) 10/01/2016 Geology and Soils Download
Relicensing Study 3.1.2 Northfield Mountain/Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report, Volume II (2016) 10/01/2016 Geology and Soils Download
Relicensing Study 3.1.2 Northfield Mountain/Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report, Volume III (2016) 10/01/2016 Geology and Soils Download
FirstLight Transmittal Letter filing 10 Study Reports, 3 Addenda and Agenda for Study Report Meetings Oct 31, 2016 and Nov 1, 2016 10/14/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume I (2016) 09/01/2016 Geology and Soils Download
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume II (2016) 09/01/2016 Geology and Soils Download
FERC Letter Determination on Requests for Study Modifications and New Studies 01/15/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Updated Study Report Summary 3.8.1 Evaluate the IMpact of Current and Proposed Future Modes of Operation on Flow, Water Elevation and Hydropower Generation 09/14/2015 Operations Download
Updated Study Report Summary 3.7.2 Historical Architechtural Resources Survey & National Register Evaluation 09/14/2015 Cultural Download
Updated Study Report Summary 3.7.1 Phase IA (Reconnaissance) Archaeological Survey 09/14/2015 Cultural Download
Updated Study Report Summary 3.6.6 Assessment of Effects of Project Operation on the Recreation and Land Use 09/14/2015 Recreation and Land Use Download
Updated Study Report Summary 3.6.5 Land Use Inventory 09/14/2015 Recreation and Land Use Download
Updated Study Report Summary 3.6.1 Recreational Use/User Contact Survey 09/14/2015 Recreation and Land Use Download
Updated Study Report Summary 3.5.1 Baseline Inventory of Wetland, Ripariam and Littoral Habitat in the Turners Falls Impoundment and Assessment of Operational Impacts on Special-Status Species 09/14/2015 Wetlands Download
Updated Study Report Summary 3.4.1 Baseline Study of Terrestrial Wildlilfe and Botanical Resources 09/14/2015 Terrestrial Download
Udated Study Report Summary 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Project Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.8 Computation Fluid Dynamics Modeling in the Vicinity of the Fishway Entrances and Powerhouse Forebays 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.7 Fish Entrainment and Turbine Passage Mortality Study 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.6 Impact of Project Operations on Shad Spawning, Spawning Habitat and Egg Deposition in the area of Northfield Mountain and Turner Falls Projects 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.5 Evaluate Downstream Passage of American Eel 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.4 Evaluate Upstream Passage of American Eel at the Turner Falls Project 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.3 Evaluate Downstream Passage of Juvenile American Shad 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.2 Evaluate Upstream and Downstream Passage of Adult American Shad 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.20 Ichthyoplankton Entrainment Assessment at the Northfield Mountain Project 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station 09/14/2015 Water Resources Download
Updated Study Report Summary 3.3.19 Evaluate the Use of an Ultrasound Array to Facilitate Upstream Movement of American Shad at Turner Falls 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.16 Habitat Assessment, Surveys, and Modeling of Suitable Habitat for State-Listed Mussel Species in the Connecticut River Below Cabot Station 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.15 Assessment of Adult Sea Lamprey Spawning with the Turner Falls Project and Northfield Mountain Project Area 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.13 Impacts of the Turner Falls Project and Northfield Mountain Project on Littoral Zone Fish Habitat and Spawning Habitat 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.12 Evaluate Frequency and Impact of Emergency Water Control Gate Discharge Events and Bypass Flume Events on Shortnose Sturgeon Spawning and Rearing Habitat in the Tailrace and Downstream From Cabot Station 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.11 Fish Assemblage Assessment 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.10 Assess Operational Impacts on Emergence of State-Listed Odonates in the Connecticut River 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.2.1 Water Quality Monitoring Study 09/14/2015 Water Resources Download
Updated Study Report Summary 3.1.2 Operation Impacts on Existing Erosion and Potential Bank Instability 09/14/2015 Recreation and Land Use Download
2015 Updated Study Report Presentation 09/28/2015 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Study 3.6.2 Recreation Facilities Inventory and Assessment Addendum 06/15/2015 Recreation and Land Use Download
Relicensing Study 3.6.7 Recreation Study at Northfield Mountain, including Assessment of Sufficient of Trails for Shared Use 06/30/2015 Recreation and Land Use Download
Relicensing Study 3.6.5 Land Use Inventory Study Report 12/31/2015 Recreation and Land Use Download
Relicensing Study 3.6.1 Recreation Use/User Contact Survey Study Report 12/31/2015 Recreation and Land Use Download
Relicensing Study 3.3.17 Assess the Impacts of Turner Falls Project and Northfield Project Operations on Tributary and Backwater Area Access and Habitat 06/30/2015 Fish and Aquatics Download
Relicensing Study 3.3.14 Aquatic Habitat Mapping of Turner Falls Impoundment 06/30/2015 Fish and Aquatics Download
Relicensing Study 3.1.3 Sediment Management Plan 09/14/2015 Geology and Soils Download
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace 12/01/2015 Water Resources Download
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace (Appendix B Water Surface) 12/01/2015 Water Resources Download
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace (Appendix B Velocity) 12/01/2015 Water Resources Download
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace (Appendix B Depth) 12/01/2015 Water Resources Download