Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the bypass Reach and below Cabot Station -Addendum 6 Assessment of Sea Lamprey and Yellow Lampmussels in Reach 4 |
04/01/2019 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station Addendum 5 Assessment of Sea Lamprey (new spawning HSI curves) and Yellow Lampmussels in Reach 3 |
03/01/2019 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.19 Proposed 2019 Ultrasound Array Control Study |
03/01/2019 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.19 - Final 2019 Ultrasound Array Control Study (Updated) |
04/01/2019 |
Fish and Aquatics |
Download
|
Northfield Mountain Generation Station CFD Modeling for Fish Exclusion Net Forces Report |
06/01/2019 |
Fish and Aquatics |
Download
|
FirstLight submits response to Connecticut River Conservancy (CRC) Comments on 2019 Updated Study Reports 3.3.19, 3.3.9 and 3.7.1 |
06/13/2019 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight submits response to Massachusetts Division of Fisheries and Wildlife relative to Mussel Assessment |
05/29/2019 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station Addendum 4 New Sea Lamprey Weighed Usable Area Curves based on Agency Proposed Habitat Suitability Index Curves |
05/01/2018 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station Addendum 3 Assessment of Yellow Lampmussels in Reach 3 |
05/01/2018 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station Addendum 2 IFIM Study for Mussels in Reach 5 |
05/01/2018 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.15 Assessment of Sea Lamprey Spawning within Assessment of Sea Lamprey Spawning within Turners Falls Turners Falls Project Northfield Mountain Project Area Addendum 1 Impact on Sea Lamprey Spawning Nests near Stebbins Island |
05/01/2018 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.19 Evaluate the Use of an Ultrasound Array to Facilitate Upstream Movement to Turners Falls Dam by avoiding Cabot Station Tailrace -2018 Study Report |
03/01/2019 |
Fish and Aquatics |
Download
|
FirstLight files October 9, 2018 Study Report Meeting Summary |
10/24/2018 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight files Conference Call-In Number for October 9, 2018 Study Plan Meeting |
09/21/2018 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight files Agenda for October 9, 2018 Study Plan Meeting |
09/13/2018 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Study 3.8.1 Evaluate the Impact of Current and Potential Future Modes of Operations on Flow, Water Elevation and Hydropower Generation |
03/01/2017 |
Operations |
Download
|
Relicensing Study 3.5.1 Baseline Inventory of Wetland, Riparian and Littoral Habitat in the Turners Falls Impoundment and Assessment of Operational Impacts on Special Status Species Addendum 2 - Public Version |
04/01/2017 |
Wetlands |
Download
|
Relicensing Study 3.3.5 Evaluate Downstream Passage of American Eel |
03/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.3 Evaluate Downstream Pass Evaluate Downstream Pass Evaluate Downstream Passage Addendum 1 |
05/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.2 Evaluate Upstream and Downstream Passage Addendum 1 |
05/01/2017 |
Fish and Aquatics |
Download
|
Errata Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment E2 Errata) |
05/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.19 Evaluate the use of Ultrasound Array to Facilitate Upstream Movement to Turners Falls Dam by Avoiding Cabot Station Tailrace |
03/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume I (2017) |
04/01/2017 |
Geology and Soils |
Download
|
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume II (Re-Issue 2017) |
04/01/2017 |
Geology and Soils |
Download
|
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume III (Re-Issue 2017) |
04/01/2017 |
Geology and Soils |
Download
|
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station - IFIM for Mussels 2017 |
08/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment E2) |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment E1) |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D7) |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D6) |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D5) |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D3) |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D2) |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D1) |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume III (Re-Issue 2017) Appendix J-II |
04/01/2017 |
Geology and Soils |
Download
|
FirstLight response Massachusetts Department of Environmental Protection (MADEP) comments on the Erosion Causation Report letter dated December 14, 2016 |
04/03/2017 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
FirstLight analysis of expanded use of the Upper Reservoir on potential shoreline erosion of the Turners Falls Impoundment |
04/03/2017 |
Operations |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study 3.6.6 Assessment of Effects of Project Operation on Recreation and Land Use |
10/01/2016 |
Recreation and Land Use |
Download
|
Relicensing Study 3.5.1 Baseline Inventory of Wetland, Riparian and Littoral Habitat in the Turners Falls Impoundment and Assessment of Operational Impacts on Special Status Species Addendum - Public Version |
10/01/2016 |
Wetlands |
Download
|
Relicensing Study 3.3.8 Computational Fluid Dynamics Modeling in the Vicinity of the Fishway Entrances and Powerhouse Forebays Addendum |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.7 Fish Entrainment and Turbine Passage Mortality Study |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.6 Impact of Project Operations on Shad Spawning, Spawning Habitat and Egg Deposition in the area of the Northfield Mountain and Turners Falls Projects Addendum |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.3 Evaluate Downstream Passage of Juvenile American Shad Interim Study Report |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.3 Evaluate Downstream Passage of Juvenile American Shad Interim Study Report |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.2. Evaluate Upstream and Downstream Passage of Adult American Shad Study Report |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.20 Ichthyoplankton Entrainment Assessment at Northfield Mountain Project -Second year |
12/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.16 Habitat Suitability Criteria for State-listed Mussel Species in the Connecticut River below Cabot Station Study Report |
10/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.15 Assessment of Adult Sea Lamprey Spawning within the Turners Falls Project and Northfield Mountain Project Area |
06/30/2016 |
Fish and Aquatics |
Download
|