Licensing Documents

Filter

Document Title Date of Filing Contents Download
TF and NFM AFLA Executive Summary 12/04/2020 Amended Final License Application Download
TF and NFM AFLA Volume 2 of 5 (Part 1 of 4) 12/04/2020 Amended Final License Application Download
TF and NFM AFLA Volume 2 of 5 (Part 2 of 4) 12/04/2020 Amended Final License Application Download
TF and NFM AFLA Volume 2 of 5 (Part 3 of 4) 12/04/2020 Amended Final License Application Download
TF and NFM AFLA Volume 2 of 5 (Part 4 of 4) 12/04/2020 Amended Final License Application Download
The Commonwealth of Massachusetts submits comments on the Project Notification Form (PMF) for Turners Falls and Northfield Mountain 06/21/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
The Nature Conservancy Comments on Scoping Document 1 and Study Requests for the Wilder, Bellows Falls (FERC No. 1855-045), Vernon (FERC No. 1904-073), and Turners Falls (FERC No. 1889-081) hydroelectric projects, and the Northfield Mountain Pumped Storag 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
The Nature Conservancy Connecticut River Program Comments on Proposed Study Plans for P-1889 and P-2485 07/15/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
The Nature Conservancy Connecticut River Program Comments on Revised Study Plan 08/29/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
The Nolumbeka Project Inc. submits comments re the Phase 1A Archaeological Survey for relicensing of the Turners Falls & Northfield Mountain Pumped Storage Hydroelectric Projects 04/15/2014 Cultural Download
The Vermont Agency of Natural Resources (Agency) submits comments and requests for studies. 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
The Western Massachusetts Climbers’ Coalition Scoping Comments for the Northfield Mountain Pumped Storage Project 02/20/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Town of Gill Comments on the Updated Proposed Study Plan 07/15/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Town of Northfield Office of the Town Adminstrator Comments on Updated Proposed Study Plans 3.1.1 and 3.1.2 07/15/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Transcript of 1/30/13 scoping meeting held in Turners Falls, Massachusetts for the Vernon, Northfield Mountain, and Turners Falls Hydroelectric Projects re TransCanada Hydro Northeast, Inc and FirstLight Hydro Generating Company 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Transcript of 1/31/13 scoping meeting held in Turners Falls, Massachusetts for the Connecticut River Projects' Cumulative Effects re TransCanada Hydro Northeast, Inc and FirstLight Hydro Generating Company 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Transcript of 1/31/13 scoping meeting held in Turners Falls, Massachusetts for the Northfield Mountain and Turners Falls Hydroelectric Projects re FirstLight Hydro Generating Company 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Transcript of the 11/25/13 Scoping Meeting held in Northfield, MA 11/27/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Transmittal Letter Filing of Study Reports 3.3.5, 3.3.19, 3.8.1 and Agenda for Study Report Meeting, March 16, 2017 03/01/2017 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Trout Unlimited's comments on FirstLight Proposed Study Plan 07/15/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Udated Study Report Summary 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Project Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace 09/14/2015 Fish and Aquatics Download
Updated Proposed Study Plan (PSP) for the relicensing of the Turners Falls Project and Northfield Mountain Project 06/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Updated Study Report Summary 3.1.2 Operation Impacts on Existing Erosion and Potential Bank Instability 09/14/2015 Recreation and Land Use Download
Updated Study Report Summary 3.2.1 Water Quality Monitoring Study 09/14/2015 Water Resources Download
Updated Study Report Summary 3.3.10 Assess Operational Impacts on Emergence of State-Listed Odonates in the Connecticut River 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.11 Fish Assemblage Assessment 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.12 Evaluate Frequency and Impact of Emergency Water Control Gate Discharge Events and Bypass Flume Events on Shortnose Sturgeon Spawning and Rearing Habitat in the Tailrace and Downstream From Cabot Station 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.13 Impacts of the Turner Falls Project and Northfield Mountain Project on Littoral Zone Fish Habitat and Spawning Habitat 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.15 Assessment of Adult Sea Lamprey Spawning with the Turner Falls Project and Northfield Mountain Project Area 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.16 Habitat Assessment, Surveys, and Modeling of Suitable Habitat for State-Listed Mussel Species in the Connecticut River Below Cabot Station 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.19 Evaluate the Use of an Ultrasound Array to Facilitate Upstream Movement of American Shad at Turner Falls 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station 09/14/2015 Water Resources Download
Updated Study Report Summary 3.3.20 Ichthyoplankton Entrainment Assessment at the Northfield Mountain Project 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.2 Evaluate Upstream and Downstream Passage of Adult American Shad 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.3 Evaluate Downstream Passage of Juvenile American Shad 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.4 Evaluate Upstream Passage of American Eel at the Turner Falls Project 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.5 Evaluate Downstream Passage of American Eel 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.6 Impact of Project Operations on Shad Spawning, Spawning Habitat and Egg Deposition in the area of Northfield Mountain and Turner Falls Projects 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.7 Fish Entrainment and Turbine Passage Mortality Study 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.8 Computation Fluid Dynamics Modeling in the Vicinity of the Fishway Entrances and Powerhouse Forebays 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.4.1 Baseline Study of Terrestrial Wildlilfe and Botanical Resources 09/14/2015 Terrestrial Download
Updated Study Report Summary 3.5.1 Baseline Inventory of Wetland, Ripariam and Littoral Habitat in the Turners Falls Impoundment and Assessment of Operational Impacts on Special-Status Species 09/14/2015 Wetlands Download
Updated Study Report Summary 3.6.1 Recreational Use/User Contact Survey 09/14/2015 Recreation and Land Use Download
Updated Study Report Summary 3.6.5 Land Use Inventory 09/14/2015 Recreation and Land Use Download
Updated Study Report Summary 3.6.6 Assessment of Effects of Project Operation on the Recreation and Land Use 09/14/2015 Recreation and Land Use Download
Updated Study Report Summary 3.7.1 Phase IA (Reconnaissance) Archaeological Survey 09/14/2015 Cultural Download
Updated Study Report Summary 3.7.2 Historical Architechtural Resources Survey & National Register Evaluation 09/14/2015 Cultural Download
Updated Study Report Summary 3.8.1 Evaluate the IMpact of Current and Proposed Future Modes of Operation on Flow, Water Elevation and Hydropower Generation 09/14/2015 Operations Download
US Army Corps of Engineers (USACE). 1991. General investigation study - Connecticut River streambank erosion. Waltham, MA: USACE, New England Division. 01/01/1991 Geology and Soils Download
U.S. Department of the Interior Response on the study dispute resolution process initiated by the U.S. Fish and Wildlife Service on March 13, 2014 05/01/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download