TF and NFM AFLA Executive Summary |
12/04/2020 |
Amended Final License Application |
Download
|
TF and NFM AFLA Volume 2 of 5 (Part 1 of 4) |
12/04/2020 |
Amended Final License Application |
Download
|
TF and NFM AFLA Volume 2 of 5 (Part 2 of 4) |
12/04/2020 |
Amended Final License Application |
Download
|
TF and NFM AFLA Volume 2 of 5 (Part 3 of 4) |
12/04/2020 |
Amended Final License Application |
Download
|
TF and NFM AFLA Volume 2 of 5 (Part 4 of 4) |
12/04/2020 |
Amended Final License Application |
Download
|
The Commonwealth of Massachusetts submits comments on the Project Notification Form (PMF) for Turners Falls and Northfield Mountain |
06/21/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
The Nature Conservancy Comments on Scoping Document 1 and Study Requests for the Wilder, Bellows Falls (FERC No. 1855-045), Vernon (FERC No. 1904-073), and Turners Falls (FERC No. 1889-081) hydroelectric projects, and the Northfield Mountain Pumped Storag |
03/01/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
The Nature Conservancy Connecticut River Program Comments on Proposed Study Plans for P-1889 and P-2485 |
07/15/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
The Nature Conservancy Connecticut River Program Comments on Revised Study Plan |
08/29/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
The Nolumbeka Project Inc. submits comments re the Phase 1A Archaeological Survey for relicensing of the Turners Falls & Northfield Mountain Pumped Storage Hydroelectric Projects |
04/15/2014 |
Cultural |
Download
|
The Vermont Agency of Natural Resources (Agency) submits comments and requests for studies. |
03/01/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
The Western Massachusetts Climbers’ Coalition Scoping Comments for the Northfield Mountain Pumped Storage Project |
02/20/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Town of Gill Comments on the Updated Proposed Study Plan |
07/15/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Town of Northfield Office of the Town Adminstrator Comments on Updated Proposed Study Plans 3.1.1 and 3.1.2 |
07/15/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Transcript of 1/30/13 scoping meeting held in Turners Falls, Massachusetts for the Vernon, Northfield Mountain, and Turners Falls Hydroelectric Projects re TransCanada Hydro Northeast, Inc and FirstLight Hydro Generating Company |
02/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Transcript of 1/31/13 scoping meeting held in Turners Falls, Massachusetts for the Connecticut River Projects' Cumulative Effects re TransCanada Hydro Northeast, Inc and FirstLight Hydro Generating Company |
02/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Transcript of 1/31/13 scoping meeting held in Turners Falls, Massachusetts for the Northfield Mountain and Turners Falls Hydroelectric Projects re FirstLight Hydro Generating Company |
02/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Transcript of the 11/25/13 Scoping Meeting held in Northfield, MA |
11/27/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Transmittal Letter Filing of Study Reports 3.3.5, 3.3.19, 3.8.1 and Agenda for Study Report Meeting, March 16, 2017 |
03/01/2017 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Trout Unlimited's comments on FirstLight Proposed Study Plan |
07/15/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Udated Study Report Summary 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Project Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Proposed Study Plan (PSP) for the relicensing of the Turners Falls Project and Northfield Mountain Project |
06/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Updated Study Report Summary 3.1.2 Operation Impacts on Existing Erosion and Potential Bank Instability |
09/14/2015 |
Recreation and Land Use |
Download
|
Updated Study Report Summary 3.2.1 Water Quality Monitoring Study |
09/14/2015 |
Water Resources |
Download
|
Updated Study Report Summary 3.3.10 Assess Operational Impacts on Emergence of State-Listed Odonates in the Connecticut River |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.11 Fish Assemblage Assessment |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.12 Evaluate Frequency and Impact of Emergency Water Control Gate Discharge Events and Bypass Flume Events on Shortnose Sturgeon Spawning and Rearing Habitat in the Tailrace and Downstream From Cabot Station |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.13 Impacts of the Turner Falls Project and Northfield Mountain Project on Littoral Zone Fish Habitat and Spawning Habitat |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.15 Assessment of Adult Sea Lamprey Spawning with the Turner Falls Project and Northfield Mountain Project Area |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.16 Habitat Assessment, Surveys, and Modeling of Suitable Habitat for State-Listed Mussel Species in the Connecticut River Below Cabot Station |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.19 Evaluate the Use of an Ultrasound Array to Facilitate Upstream Movement of American Shad at Turner Falls |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station |
09/14/2015 |
Water Resources |
Download
|
Updated Study Report Summary 3.3.20 Ichthyoplankton Entrainment Assessment at the Northfield Mountain Project |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.2 Evaluate Upstream and Downstream Passage of Adult American Shad |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.3 Evaluate Downstream Passage of Juvenile American Shad |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.4 Evaluate Upstream Passage of American Eel at the Turner Falls Project |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.5 Evaluate Downstream Passage of American Eel |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.6 Impact of Project Operations on Shad Spawning, Spawning Habitat and Egg Deposition in the area of Northfield Mountain and Turner Falls Projects |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.7 Fish Entrainment and Turbine Passage Mortality Study |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.8 Computation Fluid Dynamics Modeling in the Vicinity of the Fishway Entrances and Powerhouse Forebays |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.4.1 Baseline Study of Terrestrial Wildlilfe and Botanical Resources |
09/14/2015 |
Terrestrial |
Download
|
Updated Study Report Summary 3.5.1 Baseline Inventory of Wetland, Ripariam and Littoral Habitat in the Turners Falls Impoundment and Assessment of Operational Impacts on Special-Status Species |
09/14/2015 |
Wetlands |
Download
|
Updated Study Report Summary 3.6.1 Recreational Use/User Contact Survey |
09/14/2015 |
Recreation and Land Use |
Download
|
Updated Study Report Summary 3.6.5 Land Use Inventory |
09/14/2015 |
Recreation and Land Use |
Download
|
Updated Study Report Summary 3.6.6 Assessment of Effects of Project Operation on the Recreation and Land Use |
09/14/2015 |
Recreation and Land Use |
Download
|
Updated Study Report Summary 3.7.1 Phase IA (Reconnaissance) Archaeological Survey |
09/14/2015 |
Cultural |
Download
|
Updated Study Report Summary 3.7.2 Historical Architechtural Resources Survey & National Register Evaluation |
09/14/2015 |
Cultural |
Download
|
Updated Study Report Summary 3.8.1 Evaluate the IMpact of Current and Proposed Future Modes of Operation on Flow, Water Elevation and Hydropower Generation |
09/14/2015 |
Operations |
Download
|
US Army Corps of Engineers (USACE). 1991. General investigation study - Connecticut River streambank erosion. Waltham, MA: USACE, New England Division. |
01/01/1991 |
Geology and Soils |
Download
|
U.S. Department of the Interior Response on the study dispute resolution process initiated by the U.S. Fish and Wildlife Service on March 13, 2014 |
05/01/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|