Licensing Documents

Filter

Document Title Date of Filing Contents Download
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D4) 04/01/2017 Fish and Aquatics Download
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D5) 04/01/2017 Fish and Aquatics Download
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D6) 04/01/2017 Fish and Aquatics Download
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D7) 04/01/2017 Fish and Aquatics Download
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment E1) 04/01/2017 Fish and Aquatics Download
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment E2) 04/01/2017 Fish and Aquatics Download
Responses to Connecticut River Watershed Council comment letter dated March 25, 2016 and Mr. Karl Meyer comment letter dated March 27, 2016 04/22/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Revised Appendix C for Completed Study Report for Study No. 3.7.2 (NH Area Form) 07/22/2015 Cultural Download
Revised Appendix C for Completed Study Report for Study No. 3.7.2 (Transmittal Letter) 07/22/2015 Cultural Download
Revised Study Plan 08/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Revised Study Plan 3.3.19 - Evaluate the Use of an Ultrasound Array to Facilitate Upstream Movement to Turners Falls Dam by Avoiding Cabot Station Tailrace 02/18/2016 Fish and Aquatics Download
Revised Study Plan 3.3.20 Entrainment of American shad ichthyoplankton at the Northfield Mountain Pumped Storage Project 10/16/2014 Fish and Aquatics Download
Revised Study Plan. Appendix A – Study Request Letters 08/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Revised Study Plan. Appendix B – Resource Comments/Concerns and Response 08/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Revised Study Plan. Appendix C – NRCS Chemical and Physical Soil Properties 08/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Revised Study Plan. Appendix D – 2013 Full River Reconnaissance Study and Quality Assurance Project Plan 08/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Revised Study Plan. Appendix E – Previous data and information for Adult American shad 08/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Revised Study Plan. Appendix F – Turners Falls Upstream Fish Passage CFD Modeling of Gatehouse Entrance 08/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Revised Study Plan. Appendix G – 2011 Cabot Station Drawdown Juvenile American Shad Stranding Survey 08/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Revised Study Plan. Appendix H – Stakeholder Comments on Updated PSP 08/14/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Riverbank Erosion Comparison along the Connecticut River prepared by Simons & Associates (2012) 01/08/2013 Geology and Soils Download
Schedule for Filing 2013 Full River Reconnaissance Report 06/27/2013 Geology and Soils Download
Schedule for Meetings after formal meeting to discuss Proposed Study Plan 04/05/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Scoping Document 1 for TransCanada Hydro Northeast Inc. (Wilder Project, Bellows Falls, Vernon Project) and FirstLight (Turner Falls, Northfield Mountain) 12/21/2012 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Scoping Document 2 for the Wilder (FERC No. 1892-026), Bellows Falls (FERC No. 1855-045), Vernon (FERC No. 1904-073), and Turners Falls (FERC No. 1889-081) hydroelectric projects, and the Northfield Mountain Pumped Storage Project (FERC No. 2485-063) 04/15/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Scoping proposal for noise study, filed by Warren Ondras 01/31/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
SD1 Comments, PAD Comments, and Study Requests of the Massachusetts Division of Fisheries and Wildlife (MADFW) 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Sediment Management Plan - 2013 Summary of Annual Monitoring 12/02/2013 Geology and Soils Download
Sediment Management Plan – Report of 2014 Activities for Northfield Mountain Pumped Storage Project (FERC No. 2485) 12/01/2014 Geology and Soils Download
Sediment Management Plan – Report of 2015 Activities for Northfield Mountain Pumped Storage Project (FERC No. 2485) 12/01/2015 Geology and Soils Download
Simons, D.B., Andrew, J.W., Li, R.M., & Alawady, M.A. (1979). Connecticut River Streambank Erosion Study: Massachusetts, New Hampshire, and Vermont. Waltham, MA: US Army Corps of Engineers (USACE). 01/01/1979 Geology and Soils Download
Stefanie Krug Additional information and comments letter for study request (Accession No. 20130301-5029) 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Stefanie Krug Study Plan Request for the Northfield Mountain Trail Assessment under P-2485: Mountain Bike Trails Access 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Study 3.6.2 Recreation Facilities Inventory and Assessment Addendum 06/15/2015 Recreation and Land Use Download
Study 3.6.2 Recreation Facilities Inventory and Assessment Addendum Cover Letter 06/15/2015 Recreation and Land Use Download
Study dispute resolution panel re Northfield Mountain Pumped Storage Project under P-2485. 04/30/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Study Plan Determination for the Turner Falls Hydroelectric Project and The Northfield Mountain Punmped Storage Project 09/13/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Study Plan for Entrainment of American Shad Ichthyoplankton at the Northfield Mountain Pumped Storage Project. Study # 3.3.20. DRAFT FOR CONSULTATION. 09/05/2014 Fish and Aquatics Download
Study Requests of Deerfield River Trout Unlimited 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Supplemental/Additional Information Response to Data Request of Town of Montague, MA, Native American Cultural Landscape District Properties in Turners Falls Management Plan 02/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Supplemental Information from USDOI/Fish and Wildlife Service/NEFO re: Submitted ILP Proposed Study Plan or Revised Study under P-2485. 05/02/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Supplemental Information of FERC Staff under P-1892, et. al. Memo of Teleconference between Commission staff and representatives of TransCanada 08/07/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Supplemental Information of FirstLight Hydro Generating Company under P-2485, et. al to Narragansett Indian Tribe (NIT) re: Traditional Cultural Properties Study 04/24/2014 Cultural Download
Supplemental Information of Vivien Venskowski of The River Residents Association. Connecticut River concerns on Extreme Water Level Fluctuations and Campsite License Terms 03/01/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Supplemental Information/Request of FERC Staff Memo of Teleconference between Commission staff and Representatives of FirstLight Power Resources regarding PSP 3.1.2 07/23/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Supplemental Information/Request of U.S. Fish and Wildlife Service/NEFO under P-2485. FWS Response to Panel Questions Study from April 8, 2014 Dispute Panel Questions for NMPS Project Study Dispute Technical Conference 04/24/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Supplemental Information submitted by Massachusetts Division of Fisheries and Wildlife under P-1889. et. al. , regarding documented presence of yellow lampmussel, eastern pondmussel, and tidewater mucket in Reach 5 of Project Area. 05/05/2014 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Supplement Information from L. McLoughlin and Warren Ondras Additonal Noise Spectral Plots 08/28/2013 FERC Scoping/Integrated Licensing Process (ILP) Process Download
TF AFLA Volume 1 of 5 12/04/2020 Amended Final License Application Download
TF and NFM AFLA Cover letter 12/04/2020 Amended Final License Application Download