Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D4) |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D5) |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D6) |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D7) |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment E1) |
04/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment E2) |
04/01/2017 |
Fish and Aquatics |
Download
|
Responses to Connecticut River Watershed Council comment letter dated March 25, 2016 and Mr. Karl Meyer comment letter dated March 27, 2016 |
04/22/2016 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Revised Appendix C for Completed Study Report for Study No. 3.7.2 (NH Area Form) |
07/22/2015 |
Cultural |
Download
|
Revised Appendix C for Completed Study Report for Study No. 3.7.2 (Transmittal Letter) |
07/22/2015 |
Cultural |
Download
|
Revised Study Plan |
08/14/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Revised Study Plan 3.3.19 - Evaluate the Use of an Ultrasound Array to Facilitate Upstream Movement to Turners Falls Dam by Avoiding Cabot Station Tailrace |
02/18/2016 |
Fish and Aquatics |
Download
|
Revised Study Plan 3.3.20 Entrainment of American shad ichthyoplankton at the Northfield Mountain Pumped Storage Project |
10/16/2014 |
Fish and Aquatics |
Download
|
Revised Study Plan. Appendix A – Study Request Letters |
08/14/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Revised Study Plan. Appendix B – Resource Comments/Concerns and Response |
08/14/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Revised Study Plan. Appendix C – NRCS Chemical and Physical Soil Properties |
08/14/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Revised Study Plan. Appendix D – 2013 Full River Reconnaissance Study and Quality Assurance Project Plan |
08/14/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Revised Study Plan. Appendix E – Previous data and information for Adult American shad |
08/14/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Revised Study Plan. Appendix F – Turners Falls Upstream Fish Passage CFD Modeling of Gatehouse Entrance |
08/14/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Revised Study Plan. Appendix G – 2011 Cabot Station Drawdown Juvenile American Shad Stranding Survey |
08/14/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Revised Study Plan. Appendix H – Stakeholder Comments on Updated PSP |
08/14/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Riverbank Erosion Comparison along the Connecticut River prepared by Simons & Associates (2012) |
01/08/2013 |
Geology and Soils |
Download
|
Schedule for Filing 2013 Full River Reconnaissance Report |
06/27/2013 |
Geology and Soils |
Download
|
Schedule for Meetings after formal meeting to discuss Proposed Study Plan |
04/05/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Scoping Document 1 for TransCanada Hydro Northeast Inc. (Wilder Project, Bellows Falls, Vernon Project) and FirstLight (Turner Falls, Northfield Mountain) |
12/21/2012 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Scoping Document 2 for the Wilder (FERC No. 1892-026), Bellows Falls (FERC No. 1855-045), Vernon (FERC No. 1904-073), and Turners Falls (FERC No. 1889-081) hydroelectric projects, and the Northfield Mountain Pumped Storage Project (FERC No. 2485-063) |
04/15/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Scoping proposal for noise study, filed by Warren Ondras |
01/31/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
SD1 Comments, PAD Comments, and Study Requests of the Massachusetts Division of Fisheries and Wildlife (MADFW) |
02/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Sediment Management Plan - 2013 Summary of Annual Monitoring |
12/02/2013 |
Geology and Soils |
Download
|
Sediment Management Plan – Report of 2014 Activities for Northfield Mountain Pumped Storage Project (FERC No. 2485) |
12/01/2014 |
Geology and Soils |
Download
|
Sediment Management Plan – Report of 2015 Activities for Northfield Mountain Pumped Storage Project (FERC No. 2485) |
12/01/2015 |
Geology and Soils |
Download
|
Simons, D.B., Andrew, J.W., Li, R.M., & Alawady, M.A. (1979). Connecticut River Streambank Erosion Study: Massachusetts, New Hampshire, and Vermont. Waltham, MA: US Army Corps of Engineers (USACE). |
01/01/1979 |
Geology and Soils |
Download
|
Stefanie Krug Additional information and comments letter for study request (Accession No. 20130301-5029) |
03/01/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Stefanie Krug Study Plan Request for the Northfield Mountain Trail Assessment under P-2485: Mountain Bike Trails Access |
03/01/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Study 3.6.2 Recreation Facilities Inventory and Assessment Addendum |
06/15/2015 |
Recreation and Land Use |
Download
|
Study 3.6.2 Recreation Facilities Inventory and Assessment Addendum Cover Letter |
06/15/2015 |
Recreation and Land Use |
Download
|
Study dispute resolution panel re Northfield Mountain Pumped Storage Project under P-2485. |
04/30/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Study Plan Determination for the Turner Falls Hydroelectric Project and The Northfield Mountain Punmped Storage Project |
09/13/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Study Plan for Entrainment of American Shad Ichthyoplankton at the Northfield Mountain Pumped Storage Project. Study # 3.3.20. DRAFT FOR CONSULTATION. |
09/05/2014 |
Fish and Aquatics |
Download
|
Study Requests of Deerfield River Trout Unlimited |
03/01/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Supplemental/Additional Information Response to Data Request of Town of Montague, MA, Native American Cultural Landscape District Properties in Turners Falls Management Plan |
02/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Supplemental Information from USDOI/Fish and Wildlife Service/NEFO re: Submitted ILP Proposed Study Plan or Revised Study under P-2485. |
05/02/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Supplemental Information of FERC Staff under P-1892, et. al. Memo of Teleconference between Commission staff and representatives of TransCanada |
08/07/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Supplemental Information of FirstLight Hydro Generating Company under P-2485, et. al to Narragansett Indian Tribe (NIT) re: Traditional Cultural Properties Study |
04/24/2014 |
Cultural |
Download
|
Supplemental Information of Vivien Venskowski of The River Residents Association. Connecticut River concerns on Extreme Water Level Fluctuations and Campsite License Terms |
03/01/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Supplemental Information/Request of FERC Staff Memo of Teleconference between Commission staff and Representatives of FirstLight Power Resources regarding PSP 3.1.2 |
07/23/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Supplemental Information/Request of U.S. Fish and Wildlife Service/NEFO under P-2485. FWS Response to Panel Questions Study from April 8, 2014 Dispute Panel Questions for NMPS Project Study Dispute Technical Conference |
04/24/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Supplemental Information submitted by Massachusetts Division of Fisheries and Wildlife under P-1889. et. al. , regarding documented presence of yellow lampmussel, eastern pondmussel, and tidewater mucket in Reach 5 of Project Area. |
05/05/2014 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Supplement Information from L. McLoughlin and Warren Ondras Additonal Noise Spectral Plots |
08/28/2013 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
TF AFLA Volume 1 of 5 |
12/04/2020 |
Amended Final License Application |
Download
|
TF and NFM AFLA Cover letter |
12/04/2020 |
Amended Final License Application |
Download
|