FirstLight Response to Stakeholder Comments on Study Plan 3.3.19 |
04/13/2018 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station Addendum 2 IFIM Study for Mussels in Reach 5 |
05/01/2018 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.15 Assessment of Sea Lamprey Spawning within Assessment of Sea Lamprey Spawning within Turners Falls Turners Falls Project Northfield Mountain Project Area Addendum 1 Impact on Sea Lamprey Spawning Nests near Stebbins Island |
05/01/2018 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.19 Evaluate the Use of an Ultrasound Array to Facilitate Upstream Movement to Turners Falls Dam by avoiding Cabot Station Tailrace -2018 Study Report |
03/01/2019 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.5 Evaluate Downstream Passage of American Eel |
03/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.3 Evaluate Downstream Pass Evaluate Downstream Pass Evaluate Downstream Passage Addendum 1 |
05/01/2017 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.2 Evaluate Upstream and Downstream Passage Addendum 1 |
05/01/2017 |
Fish and Aquatics |
Download
|
2014 Initial Study Report. Summary 3.3.3. |
09/15/2014 |
Fish and Aquatics |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 1 |
02/24/2015 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 3 |
02/24/2015 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 6 |
02/24/2015 |
Geology and Soils |
Download
|
Northrop, Devine and Tarbell, Inc.. 1991. Connecticut River Riverbank Management Master Plan (Draft). Northeast Utilities Service Company, Inc. |
01/01/1991 |
Geology and Soils |
Download
|
FirstLight Response to EPA Comments on Northfield Mountain Pumped Storage Project Sediment Management Plan – 2014 Summary of Annual Monitoring |
03/31/2015 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 5 |
02/24/2015 |
Geology and Soils |
Download
|
Field Geology Services. (2007). Fluvial geomorphology study of the Turners Falls Pool on the Connecticut River between Turners Falls, MA and Vernon, VT. Prepared for Northfield Mountain Pumped Storage Project. Farmington, ME: Field Geology Services. |
01/01/2007 |
Geology and Soils |
Download
|
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume II (2016) |
09/01/2016 |
Geology and Soils |
Download
|
Field, John. 2011. Detailed Analysis of the 2008 Full River Reconnaissance of the Turners Falls Pool on the Connecticut River: Unpublished report prepared for The Landowners and Concerned Citizens for License Compliance. |
01/01/2011 |
Geology and Soils |
Download
|
FirstLight Letter Response to Connecticut River Streambank Erosion Committee Full River Reconnaissance Data Request received October 22, 2014 |
10/29/2014 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment B-2007 to 2014 Photo Comparison |
02/24/2015 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 2 |
02/24/2015 |
Geology and Soils |
Download
|
Analysis of Erosion in Vicinity of Route 10 Bridge Spanning the Connecticut River prepared by Simons & Associates (2012). |
01/08/2013 |
Geology and Soils |
Download
|
Letter from FirstLight pertaining to the causation study (Study No. 3.1.2) |
08/12/2014 |
Geology and Soils |
Download
|
Schedule for Filing 2013 Full River Reconnaissance Report |
06/27/2013 |
Geology and Soils |
Download
|
Sediment Management Plan - 2013 Summary of Annual Monitoring |
12/02/2013 |
Geology and Soils |
Download
|
2014 Initial Study Report. Summary Study 3.1.3. |
09/15/2014 |
Geology and Soils |
Download
|
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume III (Re-Issue 2017) Appendix J-II |
04/01/2017 |
Geology and Soils |
Download
|
Simons, D.B., Andrew, J.W., Li, R.M., & Alawady, M.A. (1979). Connecticut River Streambank Erosion Study: Massachusetts, New Hampshire, and Vermont. Waltham, MA: US Army Corps of Engineers (USACE). |
01/01/1979 |
Geology and Soils |
Download
|
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume I (2017) |
04/01/2017 |
Geology and Soils |
Download
|
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume II (Re-Issue 2017) |
04/01/2017 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Cover Letter |
02/24/2015 |
Geology and Soils |
Download
|
Relicensing Study 3.1.2 Northfield Mountain/Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report, Volume II (2016) |
10/01/2016 |
Geology and Soils |
Download
|
2014 Initial Study Report. Summary Study 3.1.2 |
09/15/2014 |
Geology and Soils |
Download
|
Relicensing Study 3.1.2 Northfield Mountain/Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report, Volume III (2016) |
10/01/2016 |
Geology and Soils |
Download
|
2014 Initial Study Report. Study 3.1.1 |
09/15/2014 |
Geology and Soils |
Download
|
Riverbank Erosion Comparison along the Connecticut River prepared by Simons & Associates (2012) |
01/08/2013 |
Geology and Soils |
Download
|
Sediment Management Plan – Report of 2015 Activities for Northfield Mountain Pumped Storage Project (FERC No. 2485) |
12/01/2015 |
Geology and Soils |
Download
|
Sediment Management Plan – Report of 2014 Activities for Northfield Mountain Pumped Storage Project (FERC No. 2485) |
12/01/2014 |
Geology and Soils |
Download
|
FERC Order Approving FirstLight 2013 Full River Reconnaissance (FRR) Report Schedule for the Northfield Mountain |
10/02/2013 |
Geology and Soils |
Download
|
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume III (Re-Issue 2017) |
04/01/2017 |
Geology and Soils |
Download
|
2013 Full River Reconnaissance – 2015 Addendum Attachment A Riverbank Segment QA Comparison Part 4 |
02/24/2015 |
Geology and Soils |
Download
|
FirstLight submits to FERC 2013 Construction Progress Report MA Erosion Control Plan for Northfield Mountain Project, Riverbank Restoration Bathory-Gallagher and Wallace-Watson Sites. |
12/06/2013 |
Geology and Soils |
Download
|
Relicensing Study 3.1.2 Northfield Mountain/Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report, Volume I (2016) |
10/01/2016 |
Geology and Soils |
Download
|
Relicensing Study 3.1.3 Sediment Management Plan |
09/14/2015 |
Geology and Soils |
Download
|
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume I (2016) |
09/01/2016 |
Geology and Soils |
Download
|
Relicensing Study 3.1.3 Northfield Mountain Pumped Storage Project Sediment Management Plan |
10/01/2016 |
Geology and Soils |
Download
|
US Army Corps of Engineers (USACE). 1991. General investigation study - Connecticut River streambank erosion. Waltham, MA: USACE, New England Division. |
01/01/1991 |
Geology and Soils |
Download
|
FERC Letter Acknowledging Receipt of Sediment Management Plan - 2013 Summary of Annual Monitoring |
01/23/2014 |
Geology and Soils |
Download
|
EPA Comments of EPA New England under P-2485, comments on PSP Section 3.1 Geology and Soils |
07/11/2013 |
Geology and Soils |
Download
|
Notification of Intent (NOI) of Firstlight Hydro Generation Company to File an Application for A New License For The Turners Falls Hydroelectric Project (No. 1889) and the Northfield Mountain Pumped Storage Project (No. 2485) |
10/30/2012 |
Notice of Intent |
Download
|
Updated Study Report Summary 3.8.1 Evaluate the IMpact of Current and Proposed Future Modes of Operation on Flow, Water Elevation and Hydropower Generation |
09/14/2015 |
Operations |
Download
|